Plan Review Details - Permit 18060581
Plan Review Stops For Permit 18060581
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2018-09-11 Cont ID  
Sent By tmoore Date 2018-09-11 Time 08:33 Rev Time 0.00
Received By tmoore Date 2018-09-11 Time 08:31 Sent To  
Notes
2018-09-11 08:33:15OK TO ISSUE. NOW HAVE ALL UTILITY RELEASES.
 WILL E-MAIL ALLISON, PERMIT READY TO PICK UP.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2018-08-22 Cont ID  
Sent By tmoore Date 2018-08-22 Time 08:37 Rev Time 0.00
Received By tmoore Date 2018-08-22 Time 08:27 Sent To  
Notes
2018-08-22 08:37:21STILL MISSING FROM APPLICATION IS THE FOLLOWING;
  
 1) RELEASE COPY FROM F.P.U.
  
 2) COPY OF THE N.O.C.
  
 3) A PLUMBING FINAL #703 CALLED IN ON SEWER LATERAL
 CAPPING PERMIT # 18061375 BY SUB CONTRACTOR CUSTOM
 PLUMBING.
  
 4) REMAINING FEE OF $190.00 CAN BE PAID AT PERMIT
 PICK-UP.
  
 5) A DEBRIS DISPOSAL FORM FILLED OUT BY PERMIT PICK-UP.
  
  
 TOM AT 561-805-6669
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-06-14 Cont ID  
Sent By tmoore Date 2018-06-14 Time 08:06 Rev Time 0.00
Received By tmoore Date 2018-06-14 Time 07:53 Sent To ENG
Notes
2018-06-14 08:06:50APPLICATION WAS RECEIVED WITHOUT ANY UTILITY RELEASES.
 BEFORE THE DEMO PERMIT CAN BE ISSUED, THE FOLLOWING
 WILL BE NEEDED AS THE REAR BUILDING WAS A GARAGE
 APARTMENT WITH A FIXTURE BATH.
  
 1) RELEASE CONFIRMATION FROM FPL THAT THE SERVICE IS
 DISCONNECTED TO THE GARAGE APARTMENT.
  
 2) RELEASE CONFIRMATION FROM FPU THAT THE SERVICE IS
 DISCONNECTED OR NOT PREVIOUSLY SERVICED TO THE REAR
 GARAGE APARTMENT.
  
 3) A RODENT LETTER FROM A PEST CONTROL COMPANY.
  
 4) A RELEASE FROM THE WATER DEPARTMENT ON THEIR FORM,
 THAT THE REAR BUILDING WILL BE DEMOED. THEY WILL LOCATE
 AND MARK THE SEWER LATERAL IN GREEN PAINT. THIS WILL
 ALLOW YOUR PLUMBER TO FIND AND CAP THE SEWER LATERAL
 TIE TO THE REAR BUILDING.
  
 5) A SEPERATE PERMIT TO CAP THE SEWER LATERAL TIE IN AT
 THE REAR BUILDING. A FINAL INSPECTION #703 WILL NEED TO
 BE REQUESTED AND PASSED PRIOR TO DEMO PERMIT ISSUANCE.
  
 6) A DEBRIS DISPOSAL FORM FILLED OUT. THIS CAN BE DONE
 AT PERMIT PICK UP.
  
 7) A COPY OF THE N.O.C.,
  
 8) PASSED REVIEW STOPS FROM THE HISTORIC AND
 ENGINEERING DEPARTMENTS. I WILL MOVE THE APPLICATION TO
 ENGINEERING'S MAILBOX NOW.
  
 IF YOU HAVE QUESTIONS ON WHAT IS REQUIRED, I CAN BE
 REACHED AT 561-805-6669.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2018-06-18 Cont ID  
Sent By hhall Date 2018-06-18 Time 08:48 Rev Time 0.00
Received By hhall Date 2018-06-18 Time 08:48 Sent To HIST
Notes
2018-06-18 08:52:17PASSED - NO UTILITY CONFLICTS - REFERENCE INCLUDED
 AERIAL
 ADDRESS BUILDING COMMENTS - SEWER LINE IN NORTH SIDE OF
 OMAR RD

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2018-06-20 Cont ID  
Sent By fmittner Date 2018-06-20 Time 09:28 Rev Time 0.00
Received By fmittner Date 2018-06-20 Time 09:28 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-09-11 Cont ID  
Sent By tmoore Date 2018-09-11 Time 08:31 Rev Time 0.00
Received By tmoore Date 2018-09-11 Time 08:31 Sent To  
Notes
2018-08-17 15:11:43RESUB ROUTED TO TMOORE'S DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-06-20 Cont ID  
Sent By cpuell Date 2018-06-20 Time 16:25 Rev Time 0.00
Received By cpuell Date 2018-06-12 Time 12:54 Sent To  
Notes
2018-06-13 12:54:27ROUTED TO TMOORE'S DESK


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved