Plan Review Stops For Permit 18060232 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2018-06-26 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-06-26 |
Time |
09:11 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-06-26 |
Time |
09:07 |
Sent To |
E |
|
Notes |
2018-06-26 09:11:30 | FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND | | BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO | | FILLING THE POOL WITH WATER. | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2018-06-27 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2018-06-27 |
Time |
06:32 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2018-06-27 |
Time |
06:30 |
Sent To |
I |
|
Notes |
2018-06-27 06:32:07 | MASTER PERMIT MUST INCLUDE VALUE OF ALL SUB-PERMITS | | UNDER MASTER. VALUE UPDATED FROM 42092$ TO 44092$ TO | | INCLUDE PLUMBING AND ELECTRICAL SUB-PERMIT VALUES. |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
N |
Date |
2018-06-26 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-06-26 |
Time |
06:20 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-06-26 |
Time |
06:07 |
Sent To |
|
|
Notes |
2018-06-26 06:21:04 | THERE IS NO GAS ASSOCIATED WITH THIS POOL. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2018-08-08 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-08-08 |
Time |
06:28 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-07-30 |
Time |
10:21 |
Sent To |
|
|
Notes |
2018-07-31 10:22:12 | RESUB ROUTED TO TKLARGE |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2018-07-16 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-07-16 |
Time |
08:09 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-07-06 |
Time |
14:03 |
Sent To |
|
|
Notes |
2018-07-09 14:03:39 | RESUB ROUTED TO TKLARGE |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-06-27 |
|
|
Cont ID |
|
Sent By |
fgiaquin |
Date |
2018-06-27 |
Time |
06:32 |
Rev Time |
0.00 |
Received By |
fgiaquin |
Date |
2018-06-06 |
Time |
10:37 |
Sent To |
|
|
Notes |
2018-06-07 10:37:13 | ROUTED TO ZONING INBOX |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2018-08-08 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-08-08 |
Time |
06:28 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-08-08 |
Time |
06:18 |
Sent To |
I |
|
Notes |
2018-08-01 06:23:09 | 1) THE POOL PLANS SHOW TDH CALCULATIONS BASED ON THE | | SIMPLIFIED TDH CALCULATION METHOD. THIS METHOD IS | | ALLOWED IN THE 2006 VERSION OF APSP 7 BUT IS NO LONGER | | ALLOWED IN THE 2013 EDITION OF APSP 7 WHICH HAS BEEN | | ADOPTED BY THE 2017. | | FBC. TOTAL DYNAMIC HEAD CALCULATIONS SHALL BE DONE IN | | ACCORDANCE WITH 2013 APSP 7 SEC.4.4.9.1. | | 2) TWO PUMP CURVES HAVE BEEN PROVIDED BUT THERE IS NO | | INDICATION ON EITHER CURVE WHICH CURVE KEY IS SPECIFIC | | TO THE TDH CALCULATIONS. THERE ARE DIFFERENT RPM'S ON | | THE CURVES. CLARRIFY WHICH ONE. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2018-07-16 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-07-16 |
Time |
08:08 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-07-16 |
Time |
07:58 |
Sent To |
I |
|
Notes |
2018-07-16 08:08:49 | 1) SHT. 2 OF 4 - APSP/ANSI-7 BOX - THE PLAN STILL | | STATES THAT THE MAXIMUM FLOW RATE OF THE SYSTEM IS | | BASED ON THE MAXIMUM FLOW FROM THE PUMP CURVE. REMOVE | | THIS NOTE FROM BOTH SETS OF PLANS. | | 2) TOTAL DYNAMIC HEAD CALCULATIONS HAVE NOT BEEN | | SUBMITTED AS PREVIOUSLY REQUESTED. THERE IS A CLOUDED | | AREA WITH TDH NUMBERS FOR THE PIPE, FITTINGS AND | | FILTER. THESE ARE NOT CALCULATIONS. 2ND REQUEST. | | 3) . IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS | | SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL. THIS | | IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE | | TDH CALCULATIONS. 2ND REQUEST. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2018-06-26 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-06-26 |
Time |
06:20 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-06-26 |
Time |
06:07 |
Sent To |
|
|
Notes |
2018-06-26 06:20:09 | 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE | | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM | | ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN | | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC | | 7 ? 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION | | ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT | | REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED | | THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET | | FITTING ASSEMBLY (DRAIN COVER). | | | | 2) IDENTIFY ON THE PUMP CURVE WHICH KEY CURVE IS | | SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | | | | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2018-06-08 |
|
|
Cont ID |
|
Sent By |
mcruz |
Date |
2018-06-08 |
Time |
15:51 |
Rev Time |
0.00 |
Received By |
mcruz |
Date |
2018-06-08 |
Time |
15:48 |
Sent To |
B |
|
Notes |
|
|