Plan Review Details - Permit 18060124
Plan Review Stops For Permit 18060124 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2019-03-26 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2019-03-26 |
Time |
18:04 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2019-03-26 |
Time |
17:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2018-06-16 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-06-16 |
Time |
19:15 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-06-16 |
Time |
19:14 |
Sent To |
|
|
Notes |
2018-06-16 19:15:52 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | | | 1. IT APPEARS THAT THE PROPOSED TANK IS OUTDOORS. FBC B | | 1609, PROVIDE A DETAIL FOR HOW THE TANK WILL BE | | ANCHORED TO RESIST OVERTURNING AND SLIDING. | | | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2019-03-11 |
|
|
Cont ID |
|
Sent By |
scaldero |
Date |
2019-03-11 |
Time |
10:23 |
Rev Time |
0.00 |
Received By |
scaldero |
Date |
2019-03-11 |
Time |
10:23 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2018-06-11 |
|
|
Cont ID |
|
Sent By |
scaldero |
Date |
2018-06-11 |
Time |
10:47 |
Rev Time |
0.00 |
Received By |
scaldero |
Date |
2018-06-11 |
Time |
10:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2019-03-26 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2019-03-26 |
Time |
18:05 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2019-03-08 |
Time |
14:05 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-07-13 |
|
|
Cont ID |
|
Sent By |
mcruz |
Date |
2018-07-13 |
Time |
12:01 |
Rev Time |
0.00 |
Received By |
mcruz |
Date |
2018-07-13 |
Time |
12:01 |
Sent To |
PC |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2019-03-26 |
|
|
Cont ID |
|
Sent By |
jesmith |
Date |
2019-03-26 |
Time |
11:46 |
Rev Time |
0.00 |
Received By |
jesmith |
Date |
2019-03-26 |
Time |
10:38 |
Sent To |
|
|
Notes |
2019-03-26 11:46:46 | APPROVED | | PLUMBING PROVISO | | RE: PERMIT 18060124 1009 BANYAN AVENUE | | SCOPE IS LIMITED TO REPLACEMENT OF TWO (2) EXISTING | | PROCESS TANKS. CONNECT BY MEANS OF A COUPLING TO | | EXISTING PIPING. | | ALL WORK PER CITY CODES SUBJECT TO FIELD INSPECTOR?S | | APPROVAL | | THE FOLLOWING SHEETS HAVE BEEN REVIEWED FOR COMPLIANCE | | WITH LOCAL AND NATIONAL PLUMBING CODES | | 1. ATTACHMENT 1; TANK LOAD & ANCHOR BOLT DETAIL. (1 | | PAGE) | | 2. ATTACHMENT 2; SITE PLAN (1 PAGE) | | 3. ATTACHMENT 3; RECORD DRAWINGS (11 PAGES) | | 4. ATTACHMENT 4; TANK MANUFACTURER QUOTE (2 PAGES) | | 5. ATTACHMENT 5; TANK MANUFACTURER DESIGN | | SPECIFICATIONS (4 PAGES) | | 6. ATTACHMENT 6; CLARIFOC A-210P SAFETY DATA SHEET (13 | | PAGES) |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2018-06-27 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2018-06-27 |
Time |
07:46 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2018-06-27 |
Time |
06:10 |
Sent To |
|
|
Notes |
2018-06-27 08:01:37 | 1ST REVIEW: FBC 2017 6TH EDITION | | 2017 FLORIDA BUILDING CODE - PLUMBING, SIXTH EDITION | | 2017 FLORIDA BUILDING CODE - ACCESSIBILITY, SIXTH | | EDITION | | | | PLUMBING COMMENTS: | | | | 1. PLEASE PROVIDE A PIPING DIAGRAM THATS IS A MIN 1/8IN | | SCALE AND LEGIBLE THE ONE THAT WAS PROVIDED IS NOT. PER | | WPB AMEND TO FBC 107.2.1.3 | | 2. PROVIDE SIT PLAN THE SAT PHOTOGRAPH IS NOT CLEAR. | | PER WPB AMEND TO FBC 107.2.1.3, 107.2.5 | | 3. PLEASE INDICATE ON THE MANUFACTURE SPEC THE MODEL OF | | THE TANK AND TIE DOWN THAT YOU ARE USING THE PROPOSAL | | AND SPEC DON'T MATCH UP. PER PER WPB AMEND TO | | FBC107.2.1 | | 4. PROVIDE MSDS SHEETS FOR CHEMICAL STORED IN TANKS. | | PER WPB AMEND TO FBC107.2.1 | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | THE PREVIOUSLY REVIEWED SHEETS. | | | | GEORGE JOHNSON | | PLUMBING PLANS EXAMINER | | CITY OF WEST PALM BEACH | | 561-805-6711 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
N |
Date |
2018-07-13 |
|
|
Cont ID |
|
Sent By |
AA |
Date |
2018-07-13 |
Time |
12:00 |
Rev Time |
0.00 |
Received By |
mcruz |
Date |
2018-07-13 |
Time |
11:59 |
Sent To |
PC |
|
Notes |
2018-07-13 12:00:41 | ZONING REVIEW IS N/A. TANKS BEING REPLACED ARE SAME | | SIZE/CAPACITY AT SAME LOCATION. | | | | MAGGIE CRUZ | | ASSOCIATE PLANNER | | PLANNING AND ZONING DEPARTMENT | | TEL: 561-822-1442 | | E-MAIL: [email protected] | | |
|
|
|