Plan Review Details - Permit 18060043
Plan Review Stops For Permit 18060043
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-06-30 Cont ID  
Sent By cthroop Date 2018-06-30 Time 13:12 Rev Time 0.00
Received By cthroop Date 2018-06-30 Time 13:11 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-06-11 Cont ID  
Sent By cthroop Date 2018-06-11 Time 07:22 Rev Time 0.00
Received By cthroop Date 2018-06-09 Time 11:46 Sent To  
Notes
2018-06-11 07:27:31BUILDING PLAN REVIEW
 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
  
 CHRISTOPHER S. THROOP, C.B.O.
 PLANS EXAMINER, PX3169
 CONSTRUCTION SERVICES DIVISION
 TEL: 561-805-6726
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
 1ST REVIEW
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 1. PLANS DO NOT SHOW ENTIRE SCOPE OF WORK. INCLUDE
 KITCHEN ON PLANS. PROVIDE A MORE COMPREHENSIVE
 NARRATIVE OF THE WORK TO BE PERFORMED.
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 CONSTRUCTION DOCUMENTS SHALL BE
 DIMENSIONED AND DRAWN UPON SUITABLE MATERIAL.
 CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT CLARITY
 TO INDICATE THE LOCATION, NATURE AND EXTENT OF THE WORK
 PROPOSED AND SHOW IN DETAIL THAT IT WILL CONFORM TO THE
 PROVISIONS OF THIS CODE AND RELEVANT LAWS, ORDINANCES,
 RULES AND REGULATIONS, AS DETERMINED BY THE BUILDING
 OFFICIAL.
  
 2. VALUE APPEARS LOW FOR THE PROPOSED SOW. INCLUDE WORK
 PERFORMED WITHOUT PERMIT ON PLANS AND INCLUDE THIS WORK
 IN YOUR STATED VALUE.
 THE PERMIT VALUATION AND PERMIT FEE MUST BE
 COMMENSURATE WITH THE VALUATION AND FEE THAT A LICENSED
 CONTRACTOR WOULD PROVIDE.
 YOU MAY PROVIDE A COPY OF THE CONTRACT SIGNED BY THE
 OWNER OR A LIST OF LABOR, MATERIALS AND EQUIPMENT
 RENTAL TO VERIFY VALUE.
  
 CITY OF WPB CHPT. 1 ? VALUE
 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE OPINION OF
 THE BUILDING OFFICIAL, THE CLAIMED VALUATION OF
 BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS,
 MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE
 UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE
 DENIED, UNLESS THE APPLICANT CAN SHOW DETAILED,
 QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED CONTRACTS
 (EXCLUDING LAND VALUE) TO MEET THE APPROVAL OF THE
 BUILDING OFFICIAL. FOR PERMITTING PURPOSES, VALUATION
 OF BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT
 VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING,
 MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK,
 ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS,
 OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION
 COST ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.),
 AS PUBLISHED BY INTERNATIONAL CODE CONGRESS.
 FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE
 BUILDING OFFICIAL.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO SUBMITTAL AND LEAVE THE PREVIOUSLY
 REVIEWED SHEETS DETACHED AND MARK VOID.
  
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-09-17 Cont ID  
Sent By jpearson Date 2018-09-17 Time 15:13 Rev Time 0.00
Received By jpearson Date 2018-09-17 Time 15:13 Sent To  
Notes
2018-09-17 15:13:19PROVISO: SMOKE ALARMS PER FBC R314 AND R315.
 LOAD CACL REQUIRED IF ANY LOAD IS ADDED.
  
 PLAN WAS REVIEWED AFTER PERMIT ISSUED.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-06-30 Cont ID  
Sent By cthroop Date 2018-06-30 Time 13:12 Rev Time 0.00
Received By cthroop Date 2018-06-27 Time 13:07 Sent To I
Notes
2018-06-28 13:07:12RESUB ROUTED TO THUNT

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-06-11 Cont ID  
Sent By cthroop Date 2018-06-11 Time 07:27 Rev Time 0.00
Received By cthroop Date 2018-06-01 Time 16:21 Sent To I
Notes
2018-06-04 16:21:20ROUTED TO PLUMBING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-06-29 Cont ID  
Sent By thunt Date 2018-06-29 Time 14:10 Rev Time 0.00
Received By thunt Date 2018-06-29 Time 14:10 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-06-05 Cont ID  
Sent By thunt Date 2018-06-05 Time 15:51 Rev Time 0.00
Received By thunt Date 2018-06-05 Time 15:51 Sent To B
Notes
2018-06-05 15:52:0506/05/2018 1ST PLUMBING REVIEW**DENIED**
  
 1) VALUE SEEMS LOW. YOU MUST INCLUDE THE ENTIRE KITCHEN
 AND ALL THE NEW MAIN FLOOR TILE IN YOUR VALUATIONS AND
 SUPPLY A SIGNED BONA FIDE CONTRACT.109.3BUILDING PERMIT
 VALUATIONS.THE APPLICANT FOR A PERMIT SHALL PROVIDE AN
 ESTIMATED PERMIT VALUE AT TIME OF APPLICATION. PERMIT
 VALUATIONS SHALL INCLUDE TOTAL VALUE OF WORK, INCLUDING
 MATERIALS AND LABOR, FOR WHICH THE PERMIT IS BEING
 ISSUED, SUCH AS ELECTRICAL, GAS, MECHANICAL, PLUMBING
 EQUIPMENT AND PERMANENT SYSTEMS. IF, IN THE OPINION OF
 THE BUILDING OFFICIAL, THE VALUATION IS UNDERESTIMATED
 ON THE APPLICATION, THE PERMIT SHALL BE DENIED, UNLESS
 THE APPLICANT CAN SHOW DETAILED ESTIMATES TO MEET THE
 APPROVAL OF THE BUILDING OFFICIAL. FINAL BUILDING
 PERMIT VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 2) YOU PLANS SCOPE OF WORK DOES NOT SHOW ANY WORK BEING
 DONE IN THE KITCHEN. AS THE INSPECTOR THAT ISSUED THE
 STOP WORK ORDER AND VERIFIED BY PICTURES TAKEN OF THAT
 DAY THE ENTIRE KITCHEN WAS DEMO INCLUDING WALLS WITH
 ELECTRIAL, PLUMBING, AND GAS PIPING HAVE BEEN OR WILL
 BE MOVED. YOU PLAN MUST LIST AND INCLUDE ALL WORK BEING
 COMPLETED INCLUDING THE NEW TILE FLOORING THOUGH OUT
 THE MAIN HOME. PLEASE LIST WHAT A BATHROOM REMODEL
 ENTAILS. NEW SHOWER PANS MAY ALSO BE REQUIRED. FBC
 107.2.1
  
 3) SUB PERMIT FOR PLUMBING, GAS, AND ELEC WILL BE
 REQUIRED BY CONTRACTORS LICENSED FOR THAT SCOPE OF
 WORK. ALL WALL BOARD WILL NEED TO BE REMOVED FOR
 INSPECTIONS. FBC 105.1
  
  
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved