Plan Review Stops For Permit 18051171 |
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
P |
Date |
2018-06-27 |
|
|
Cont ID |
|
Sent By |
rsklarew |
Date |
2018-06-27 |
Time |
14:49 |
Rev Time |
0.00 |
Received By |
rsklarew |
Date |
2018-06-27 |
Time |
14:49 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2018-06-02 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-06-02 |
Time |
06:46 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-06-02 |
Time |
06:46 |
Sent To |
|
|
Notes |
2018-06-02 06:46:31 | 1) NFPA 58-2014 SEC. 6.3.2.3 - NO PART OF AN | | UNDERGROUND OR MOUNDED ASME CONTAINER SHALL BE LESS | | THAN 10 FT (3 M) FROM A BUILDING OR LINE OF ADJOINING | | PROPERTY THAT CAN BE BUILT UPON. SHOW THE DDISTANCE OF | | THE LP TANK FROM THE STRUCTURE. | | 2) A SHUTOFF VALVE IS REQUIRED UPSTREAM OF THE PRESSURE | | REGULATORS. | | 3) SUBMIT MANUF. SPECS FOR THE FLEX CONNECTORS.THE FLEX | | CONNECTOR SHALL BE APPROVED TO FLOW THE MAXIMUM BTU | | LOAD FOR THE GENERATOR. 2017 FBCR SEC. G2422.1 (8). | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-06-02 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-06-02 |
Time |
06:46 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-06-02 |
Time |
06:46 |
Sent To |
|
|
Notes |
|
|
|