Plan Review Stops For Permit 18041159 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2018-07-30 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-07-30 |
Time |
08:30 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-07-30 |
Time |
08:13 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2018-05-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-05-03 |
Time |
09:22 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-05-03 |
Time |
09:22 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2018-07-25 |
|
|
Cont ID |
|
Sent By |
jpearson |
Date |
2018-07-25 |
Time |
13:54 |
Rev Time |
0.00 |
Received By |
jpearson |
Date |
2018-07-25 |
Time |
13:54 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2018-05-10 |
|
|
Cont ID |
|
Sent By |
jpearson |
Date |
2018-05-10 |
Time |
13:09 |
Rev Time |
0.00 |
Received By |
jpearson |
Date |
2018-05-10 |
Time |
13:09 |
Sent To |
G |
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
3 |
Status |
P |
Date |
2018-08-20 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2018-08-20 |
Time |
16:38 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2018-08-20 |
Time |
16:38 |
Sent To |
|
|
Notes |
2018-08-20 16:39:35 | 08/20/18 REVIEWED FOR CODE COMPLIANCE (GAS) | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM | | THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND | | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF | | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY | | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO | | AVOID VOIDING OF THE PERMIT. | | | | LUIS A. CRESPO | | PLUMBING PLAN EXAMINER | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
F |
Date |
2018-07-30 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-07-30 |
Time |
06:26 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-07-30 |
Time |
06:09 |
Sent To |
|
|
Notes |
2018-07-30 06:26:30 | 1) SHOW THE TYPE OF PIPE AND THE PIPE SIZE AT THE | | OUTLET OF THE 2 PSI METER. WPB AMEND. TO FBC SEC. | | 107.2.1. THE EXISTING PLANS ON FILE WITH THE CITY SHOW | | AN EXISTING 1 1/2 INCH LINE. WILL THIS REMAIN OR BE | | CHANGED? CLARIFY.2ND REQUEST. | | 2) THE SUBMITTED GAS DRAWING SHOWS THE PIPE SIZE OF THE | | SECTION OF PIPE TO THE REGULATOR SERVING THE EXISTING | | GAS LOAD AS 3/4 INCH.. THE PLANS ON FILE WITH THE CITY | | SHOWS AN 1 1/4 INCH LINE TO THE INTERIOR. WILL THIS | | LINE BE REPLACED WITH A 3/4 INCH LINE? CLARIFY. 2ND | | REQUEST. | | 3) THE GAS PLAN ON FILE AT THE CITY SHOWS A 1 INCH GAS | | LINE TO THE POOL HEATER AND THE SUBMITTED GAS DRAWING | | SHOWS A 3/4 INCH LINE. CLARIFY. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | | | | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2018-05-17 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-05-17 |
Time |
11:26 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-05-17 |
Time |
11:14 |
Sent To |
I |
|
Notes |
2018-05-17 11:26:24 | | | 1) SHOW THE TYPE OF PIPE AND PIPE SIZE AT THE OUTLET OF | | THE 2 PSI METER . WPB AMEND. TO FBC SEC. 107.2.1. | | 2) SHOW THE PIPE SIZE OF THE SECTION OF PIPE TO THE | | REGULATOR SERVING THE EXISTING GAS LOAD.WPB AMEND. TO | | FBC SEC. 107.2.1. | | 3) SHOW THE TYPE OF PIPE AND PIPE SIZE DOWNSTREAM OF | | THE REGULATOR FOR THE EXISTING GAS LOADS AND NOTE THE | | DISTANCE FROM THIS REGULATOR TO THE FURTHEST OUTLET ON | | THAT SYSTEM.WPB AMEND. TO FBC SEC. 107.2.1. | | 4) A LISTED SHUTOFF VALVE IS REQUIRED IMMEDIATELY AHEAD | | OF THE MP REGULATOR FOR THE EXISTING LOADS.. 2017 FBCR | | SEC. G2420.4. | | 5) SPECIFY ON THE GAS DRAWING HOW THE 3/4 INCH | | GALVANIZED PIPE IS GOING TO BE INSTALLED. ABOVE-GROUND | | PIPING OUTDOORS SHALL COMPLY WITH 2017 FBCR | | SEC.G2415.9, G2415.11. | | 6) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FLEX | | CONNECTOR FOR THE GENERATOR. THE FLEX CONNECTOR SHALL | | BE APPROVED TO FLOW THE MAXIMUM BTU LOAD FOR THE | | GENERATOR. 2017 FBCR SEC. G2422.1 (8). | | 7) THE SEDIMENT TRAP AS DRAWN DOES NOT COMPLY WITH 2017 | | FBCR SEC.G2419.4. | | 8) SUBMIT MANUFACTURER'S SPECIFICATIONS AND | | INSTALLATION SHEETS FOR THE REGULATORS. REGULATORS | | INSTALLED ON THE EXTERIOR OF THE BUILDING SHALL BE | | APPROVED FOR OUTDOOR INSTALLATION. 2017 FBCR | | SEC.G2421.1, FBC-FUEL GAS SEC. 410.1. | | 9) LIST THE EXISTING GAS FIXTURES ON THE PLAN AND THE | | CORRESPONDING BTU LOAD FOR EACH APPLIANCE. WPB AMEND. | | TO FBC SEC .107.2.1, 2017 FBC-FUEL GAS SEC.402.1. | | 10) CITY RECORDS SHOW THE BTU LOAD OF THE EXISTING | | SYSTEM AS 585, 000 BTU'S AND THE SUBMITTED PLAN SSHOWS | | 525,000. REVISE THE EXISTING BTU LOAD. | | | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2018-08-20 |
|
|
Cont ID |
|
Sent By |
lcrespo |
Date |
2018-08-20 |
Time |
16:38 |
Rev Time |
0.00 |
Received By |
lcrespo |
Date |
2018-08-16 |
Time |
13:34 |
Sent To |
|
|
Notes |
2018-08-17 13:34:16 | RESUB ROUTED TO TKLARGE |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2018-07-30 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-07-30 |
Time |
08:31 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-07-16 |
Time |
14:04 |
Sent To |
|
|
Notes |
2018-07-17 14:04:20 | RESUB ROUTED TO ZONING INBOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-05-17 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-05-17 |
Time |
11:26 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-04-25 |
Time |
13:27 |
Sent To |
I |
|
Notes |
2018-04-26 13:27:41 | ROUTED TO ZONING INBOX |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2018-07-23 |
|
|
Cont ID |
|
Sent By |
mcruz |
Date |
2018-07-23 |
Time |
08:49 |
Rev Time |
0.00 |
Received By |
mcruz |
Date |
2018-07-23 |
Time |
08:46 |
Sent To |
E |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2018-05-02 |
|
|
Cont ID |
|
Sent By |
ajones |
Date |
2018-05-02 |
Time |
12:16 |
Rev Time |
0.00 |
Received By |
ajones |
Date |
2018-05-02 |
Time |
12:16 |
Sent To |
G |
|
Notes |
|
|