Plan Review Details - Permit 18040945
Plan Review Stops For Permit 18040945
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2018-06-13 Cont ID  
Sent By rmcdouga Date 2018-06-13 Time 08:50 Rev Time 0.00
Received By rmcdouga Date 2018-06-13 Time 07:50 Sent To I
Notes
2018-06-13 07:53:11FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-05-29 Cont ID  
Sent By rmcdouga Date 2018-05-29 Time 08:20 Rev Time 0.00
Received By rmcdouga Date 2018-05-29 Time 07:42 Sent To  
Notes
2018-05-29 08:07:20FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-05-02 Cont ID  
Sent By rmcdouga Date 2018-05-02 Time 19:07 Rev Time 0.00
Received By rmcdouga Date 2018-05-02 Time 18:46 Sent To  
Notes
2018-05-02 19:11:10PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT TWO SETS OF STRUCTURAL DETAILS FOR THE RAISED
 PLANTERS. FBC 107.2.1
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-05-02 Cont ID  
Sent By jleahy Date 2018-05-02 Time 12:49 Rev Time 0.00
Received By jleahy Date 2018-05-02 Time 12:48 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status N Date 2018-05-29 Cont ID  
Sent By tklarge Date 2018-05-26 Time 08:21 Rev Time 0.00
Received By tklarge Date 2018-05-26 Time 08:21 Sent To  
Notes
2018-05-29 14:14:40I HAVE REMOVED THE GAS PERMIT APPLICATION AND GAS PLANS
 FROM THE POOL PERMIT PACKET. THE GAS IS APPROVED UNDER
 #18040949 AND IS BEING ISSUED SEPARATELY.

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-05-13 Cont ID  
Sent By tklarge Date 2018-05-13 Time 11:12 Rev Time 0.00
Received By tklarge Date 2018-05-13 Time 10:50 Sent To  
Notes
2018-05-13 11:12:571) A GAS PERMIT APPLICATION HAS BEEN SUBMITTED IN THE
 POOL PACKAGE BUT THERE ARE NO GAS PLANS. CLARIFY.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-06-13 Cont ID  
Sent By rmcdouga Date 2018-06-13 Time 08:57 Rev Time 0.00
Received By rmcdouga Date 2018-06-06 Time 11:33 Sent To  
Notes
2018-06-07 11:33:15RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-05-29 Cont ID  
Sent By rmcdouga Date 2018-05-29 Time 08:22 Rev Time 0.00
Received By rmcdouga Date 2018-05-23 Time 14:44 Sent To  
Notes
2018-05-23 14:45:02RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-05-13 Cont ID  
Sent By tklarge Date 2018-05-13 Time 11:13 Rev Time 0.00
Received By tklarge Date 2018-04-20 Time 11:38 Sent To  
Notes
2018-04-23 11:38:19ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 3 Status P Date 2018-06-11 Cont ID  
Sent By tklarge Date 2018-06-11 Time 11:09 Rev Time 0.00
Received By tklarge Date 2018-06-11 Time 11:01 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2018-05-26 Cont ID  
Sent By tklarge Date 2018-05-26 Time 08:01 Rev Time 0.00
Received By tklarge Date 2018-05-24 Time 06:45 Sent To  
Notes
2018-05-26 08:01:421) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE IN
 ORDER TO CONFIRM THE MAXIMUM FLOW AT THE CALCULATED
 TDH.. WPB AMEND. TO FBC SEC. 107.2.1. 2ND REQUEST.
 2) IDENTIFY ON A LEGIBLE POOL PUMP CURVE THE SPECIFIC
 PUMP THAT IS BEING INSTALLED. WPB AMEND. TO FBC SEC.
 107.2.1. THE 2.7 HP PUMP LISTED IN THE EQUIPMENT SPECS
 IS NOT LISTED ON THE SUBMITTED PUMP CURVE. 2ND REQUEST.
 3) SHT. 2 OF 4 - THERE ARE TWO BOXES ON THE PLAN, ONE
 FOR THE POOL AND ONE FOR THE FEATURE THAT STILL NOTE
 THAT SYSTEM FLOW RATE HAS BEEN DETERMINED BY THE
 MAXIMUM FLOW RATE FROM THE PUMP CURVE. THIS IS NO
 LONGER PERMITTED PER APSP 7-2013 SEC. 4.4.9.. DELETE
 THIS FROM THE PLANS.AND NOTE THAT THE SYSTEM FLOW RATE
 IS BASED ON THE TDH.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-05-13 Cont ID  
Sent By tklarge Date 2018-05-13 Time 11:13 Rev Time 0.00
Received By tklarge Date 2018-05-13 Time 10:11 Sent To I
Notes
2018-05-13 11:12:351) PER APSP 7 -2013, THE MAXIMUM FLOW RATE FROM THE
 MANUFACTURER'S PUMP CURVE CAN NO LONGER BE USED TO
 DETERMINE MAXIMUM SYSTEM FLOW RATE. THE NEW CODE
 SEPARATES METHODS FOR DETERMINING MAXIMUM SYSTEM FLOW
 RATE INTO TWO CATEGORIES; UNSECURED SYSTEMS (TYPICAL
 RESIDENTIAL SYSTEMS) AND SECURED SYSTEMS (TYPICAL
 COMMERCIAL SYSTEMS). SUBMIT TOTAL TOTAL DYNAMIC HEAD
 CALCULATIONS.
 2) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE.
 WPB AMEND. TO FBC SEC. 107.2.1.
 3) IDENTIFY ON A LEGIBLE POOL PUMP CURVE THE SPECIFIC
 PUMP THAT IS BEING INSTALLED. WPB AMEND. TO FBC SEC.
 107.2.1.
 4) A GAS PERMIT APPLICATION HAS BEEN SUBMITTED IN THE
 POOL PACKAGE BUT THERE ARE NO GAS PLANS. CLARIFY.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2018-05-01 Cont ID  
Sent By ajones Date 2018-05-01 Time 12:36 Rev Time 0.00
Received By ajones Date 2018-05-01 Time 13:08 Sent To  
Notes
***NONE***