Plan Review Details - Permit 18040933
Plan Review Stops For Permit 18040933 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2018-05-11 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-05-11 |
Time |
10:33 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-05-11 |
Time |
10:33 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2018-04-28 |
|
|
Cont ID |
|
Sent By |
aclange |
Date |
2018-04-28 |
Time |
12:02 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-04-28 |
Time |
12:02 |
Sent To |
|
|
Notes |
2018-04-28 12:07:22 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. FBC BUILDING 2010 1609, DELEGATED ENGINEER (STEPHEN | | WARTER, PE) STATES THAT DESIGN PRESSURES WERE OBTAINED | | FROM THE WIND TUNNEL REPORT, WORST CASE OF +117, -223 | | PSF. SEE PAGE3 OF THE REPORT WHICH STATES: | | | | DESIGN PRESSURES FOR THE ROOF AND SOFFIT SIDE . . . DO | | NOT INCLUDE ANY ALLOWANCE FOR INTERNAL PRESSURE. . . . | | DEPENDING ON THE CONSTRUCTION OF THE ROOF SYSTEM, | | INCLUSION OF THE INTERNAL PRESSURE MAY OR MAY NOT BE | | APPROPRIATE. THEREFORE, THE SUPPLIER OF THE ROOFING | | SYSTEM SHOULD CONSIDER IF AN INTERNAL PRESSURE SHOULD | | BE ADDED TO THE PRESSURE VALUES IN FIGURE 5." | | | | ALTHOUGH IT DOES NOT APPEAR THAT INTERNAL PRESSURE | | SHOULD BE ADDED, IT APPEARS THAT THIS DETERMINATION IS | | THE RESPONSIBILITY OF THE DELEGATED ENGINEER. THIS | | COMMENT MAY BE ADDRESSED WITH A STATEMENT IN A | | DIGITALLY SIGNED AND SEALED LETTER SENT VIA EMAIL TO | | [email protected]. PLEASE REFERENCE THIS SUBMITTAL NUMBER | | (18040933) IN THE SUBJECT LINE. | | | | | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2018-05-11 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-05-11 |
Time |
10:34 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-05-10 |
Time |
07:37 |
Sent To |
|
|
Notes |
2018-05-10 07:37:54 | RESUB VIA EMAIL | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-04-28 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2018-04-28 |
Time |
13:37 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2018-04-20 |
Time |
14:20 |
Sent To |
|
|
Notes |
2018-04-23 14:20:55 | SUBMITTAL ROUTED TO ACLANGE |
|
|
|