Plan Review Details - Permit 18040925
Plan Review Stops For Permit 18040925
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status N Date 2018-05-03 Cont ID  
Sent By jleahy Date 2018-05-03 Time 11:50 Rev Time 0.00
Received By jleahy Date 2018-05-03 Time 11:50 Sent To G
Notes
2018-05-03 11:51:22ELECTRICAL INSPECTOR TO VERIFY THE SLAB AT ELECTRICAL
 FINAL JLEAHY

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-05-03 Cont ID  
Sent By jleahy Date 2018-05-03 Time 11:50 Rev Time 0.00
Received By jleahy Date 2018-05-03 Time 11:50 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2018-06-11 Cont ID  
Sent By thunt Date 2018-06-11 Time 15:41 Rev Time 0.00
Received By thunt Date 2018-06-11 Time 15:41 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2018-06-05 Cont ID  
Sent By tklarge Date 2018-06-05 Time 06:43 Rev Time 0.00
Received By tklarge Date 2018-06-05 Time 06:28 Sent To I
Notes
2018-06-05 06:33:311)THE GAS DRAWING REFERENCES GAS SIZING TABLE 402.4
 (36) WHICH IS FOR A 2 PSI SYSTEM BUT THE GAS DRAWING
 DOES NOT SHOW THE 2 PSI SYSTEM. THE ONLY REFERENCE IS
 TO 10 PSI SYSTEM. CLARIFY.
  
 2) PROVIDE DETAILS FOR THE ANCHORING OF THE LP TANK TO
 PREVENT FLOTATION.PROVIDE THE SIZE OF THE HOLD-DOWN
 CABLES/STRAPS FOR THE TANK AND THE TYPE AND LENGTH OF
 GROUND ANCHORS TO BE INSTALLED TO PREVENT FLOTATION.
 NFPA 58 SEC. 6.6.1.6.
  
 3) SUBMIT MANUFACTURER'S SPECIFICATIONS/INSTALLATION
 INSTRUCTIONS FOR BOTH TYPE OF REGULATORS. 2017 FBC-FUEL
 GAS SEC. 410.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-05-21 Cont ID  
Sent By tklarge Date 2018-05-21 Time 09:22 Rev Time 0.00
Received By tklarge Date 2018-05-21 Time 06:30 Sent To  
Notes
2018-05-21 09:22:351)THE GAS DRAWING REFERENCES GAS SIZING TABLE 402.4
 (36) WHICH IS FOR A 2 PSI SYSTEM BUT THE GAS DRAWING
 DOES NOT SHOW THE 2 PSI SYSTEM. THE ONLY REFERENCE IS
 TO 10 PSI SYSTEM. CLARIFY.
  
 2) PROVIDE THE SIZE OF THE HOLD-DOWN CABLES/STRAPS FOR
 THE TANK AND THE TYPE AND LENGTH OF GROUND ANCHORS TO
 BE INSTALLED TO PREVENT FLOTATION. NFPA 58 SEC.
 6.6.1.6.
  
 3) SUBMIT ALL THE PAGES FOR THE INSTALLATION
 INSTRUCTIONS FOR THE REGULATORS. 2017 FBC-FUEL GAS SEC.
 410.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-06-11 Cont ID  
Sent By thunt Date 2018-06-11 Time 15:41 Rev Time 0.00
Received By thunt Date 2018-06-08 Time 11:43 Sent To I
Notes
2018-06-11 11:43:57RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-06-05 Cont ID  
Sent By tklarge Date 2018-06-05 Time 06:44 Rev Time 0.00
Received By tklarge Date 2018-05-30 Time 15:21 Sent To  
Notes
2018-05-31 15:22:10RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-05-21 Cont ID  
Sent By tklarge Date 2018-05-21 Time 09:22 Rev Time 0.00
Received By tklarge Date 2018-04-19 Time 13:10 Sent To I
Notes
2018-04-20 13:10:40ROUTED TO ZONING INBOX

Review Stop Z ZONING
Rev No 2 Status P Date 2018-06-01 Cont ID  
Sent By mcruz Date 2018-06-01 Time 16:34 Rev Time 0.00
Received By mcruz Date 2018-06-01 Time 16:32 Sent To G
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2018-05-01 Cont ID  
Sent By ajones Date 2018-05-01 Time 12:03 Rev Time 0.00
Received By ajones Date 2018-05-01 Time 12:03 Sent To  
Notes
2018-05-01 12:14:035/1/18- FAILED
 THE REAR SETBACK FOR THE GENERATOR FROM THE PROPERTY
 LINE IS 11 FEET.
  
 ANGELLA VANN
 561-822-1441
 [email protected]