Plan Review Details - Permit 18040430
Plan Review Stops For Permit 18040430
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2018-06-20 Cont ID  
Sent By rmcdouga Date 2018-06-20 Time 09:18 Rev Time 0.00
Received By rmcdouga Date 2018-06-20 Time 09:07 Sent To I
Notes
2018-06-20 09:22:33FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.
  
 THIS POOL PROJECT IS LOCATED IN A SPECIAL FLOOD HAZARD
 AREA. THE POOL EQUIPMENT IS REQUIRED TO BE LOCATED
 ABOVE THE BASE FLOOD ELEVATION.
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2018-05-29 Cont ID  
Sent By rmcdouga Date 2018-05-29 Time 09:55 Rev Time 0.00
Received By rmcdouga Date 2018-05-29 Time 09:20 Sent To  
Notes
2018-05-29 09:55:07PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) COMPLIED.
  
 2) NOT ADDRESSED. THE SWIMMING POOL ALARMS ARE REQUIRED
 TO COMPLY WITH UL 2017. ON SHEET 2 THERE IS A TYPO OF
 UL 2107. PLEASE CORRECT. FBC R4501.17.1.9
  
 3) NOT ADDRESSED. PROVIDE A COPY OF THE SIGNED POOL
 CONTRACT TO VERIFY THE POOL'S VALUATION. FBC 109.3
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-05-02 Cont ID  
Sent By rmcdouga Date 2018-05-02 Time 17:05 Rev Time 0.00
Received By rmcdouga Date 2018-05-02 Time 14:00 Sent To I
Notes
2018-05-02 16:10:27PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SHEET 2 OF THE PLANS HAS MULTIPLE REFERENCES TO THE
 FBC FIFTH EDITION (2014). THE FBC SIXTH EDITION (2017)
 WENT INTO EFFECT ON JANUARY 1, 2018. ALL NEW PERMITS
 APPLIED FOR ON OR AFTER THAT DATE ARE REQUIRED TO
 COMPLY WITH AND REFERENCE THE FBC SIXTH EDITION (2017).
 FS CHAPTER 553
  
 2) THE SWIMMING POOL ALARMS ARE REQUIRED TO COMPLY WITH
 UL 2017. ON SHEET 2 THERE IS A TYPO OF UL 2107. PLEASE
 CORRECT. FBC R4501.17.1.9
  
 3) PROVIDE A COPY OF THE SIGNED POOL CONTRACT TO VERIFY
 THE POOL'S VALUATION. FBC 109.3
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-05-24 Cont ID  
Sent By fgiaquin Date 2018-05-24 Time 06:01 Rev Time 0.00
Received By fgiaquin Date 2018-05-24 Time 05:39 Sent To B
Notes
2018-05-24 06:01:16FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2017 6TH ED.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 FRANK GIAQUINTO
 ELECTRICAL INSPECTOR
 ELECTRICAL PLANS EXAMINER
 CITY OF WPB
 [email protected]
 CELL: 561-657-1653
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-04-23 Cont ID  
Sent By jleahy Date 2018-04-23 Time 17:08 Rev Time 0.00
Received By jleahy Date 2018-04-23 Time 17:08 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-04-19 Cont ID  
Sent By thunt Date 2018-04-19 Time 19:12 Rev Time 0.00
Received By thunt Date 2018-04-19 Time 19:12 Sent To  
Notes
2018-04-19 19:12:50NO GAS SHOWN ON PLAN. NO GAS EQUIPMENT ON PLAN. TLH

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2018-07-10 Cont ID  
Sent By lcrespo Date 2018-07-10 Time 17:36 Rev Time 0.00
Received By lcrespo Date 2018-07-02 Time 13:33 Sent To  
Notes
2018-07-03 13:34:03RESUB ROUTED TO LCRESPO

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-06-20 Cont ID  
Sent By rmcdouga Date 2018-06-20 Time 09:22 Rev Time 0.00
Received By rmcdouga Date 2018-05-31 Time 12:56 Sent To  
Notes
2018-06-01 12:56:35RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-05-29 Cont ID  
Sent By rmcdouga Date 2018-05-29 Time 09:55 Rev Time 0.00
Received By rmcdouga Date 2018-05-15 Time 13:24 Sent To  
Notes
2018-05-16 13:24:57RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-05-02 Cont ID  
Sent By rmcdouga Date 2018-05-02 Time 17:05 Rev Time 0.00
Received By rmcdouga Date 2018-04-10 Time 10:19 Sent To  
Notes
2018-04-11 10:19:53ROUTED TO ZONING INBOX

Review Stop P PLUMBING
Rev No 5 Status P Date 2018-07-10 Cont ID  
Sent By lcrespo Date 2018-07-10 Time 17:36 Rev Time 0.00
Received By lcrespo Date 2018-07-10 Time 17:36 Sent To  
Notes
2018-07-10 17:37:2907/10/18 APPROVED BY PLUMBING AND SENT TO PROCESSING,
 LAC

Review Stop P PLUMBING
Rev No 4 Status F Date 2018-06-25 Cont ID  
Sent By lcrespo Date 2018-06-25 Time 07:17 Rev Time 0.00
Received By lcrespo Date 2018-06-25 Time 07:17 Sent To  
Notes
2018-06-25 07:18:066/25/2018 4TH PLUMBING REVIEW **DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SUBMIT TWO LEGIBLE COPIES OF THE MANUFACTURER'S
 CERTIFIED PUMP CURVE IN ORDER TO VERIFY THE TDH
 CALCULATIONS AND MAXIMUM FLOW RATE BASED ON THOSE
 CALCULATIONS. APSP 7-13 SEC.4.4.9.1, INDICATE ON CURVE
 WHICH KEY CURVE APPLIES TO THIS SPECIFIC PUMP.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop P PLUMBING
Rev No 3 Status F Date 2018-06-04 Cont ID  
Sent By tklarge Date 2018-06-04 Time 06:15 Rev Time 0.00
Received By tklarge Date 2018-06-04 Time 05:08 Sent To  
Notes
2018-06-04 06:14:191) SHT. #7 - THE TDH CALCULATION WORKSHEET THAT HAS
 BEEN SUBMITTED IS BASED ON THE 2006 EDITION OF APSP 7.
 THE 2013 EDITION IS IN EFFECT AS OF DECEMBER 31, 2017.
 THE SIMPLIFIED TDH CALCULATION IS NO LONGER IN THE 2013
 APSP 7. REMOVE THIS SHEET FROM BOTH SETS OF PLANS.
 2) SHT. 5 - THIS SHEET NOTES THAT THE TDH CALCULATION
 IS BASED ON THE SIMPLIFIED TDH CALCULATION METHOD. THIS
 INFORMATION SHEET NEEDS TO BE DELETED FROM THE PLANS AS
 THE TDH SIMPLIFIED METHOD IS NO LONGER AN OPTION FOR
 DETERMINING MAXIMUM SYSTEM FLOW RATE.
 3) THE TDH CALCULATIONS SHALL BE THE TOTAL FROICTION
 LOSS OF THE PIPE, FITTINGS VALVES, FILTER,
 CHLORINATOR,ETC., ALL SYSTEM COMPONENTS EXCEPT THE
 PUMP.
 4) SUBMIT TWO LEGIBLE COPIES OF THE MANUFACTURER'S
 CERTIFIED PUMP CURVE IN ORDER TO VERIFY THE TDH
 CALCULATIONS AND MAXIMUM FLOW RATE BASED ON THOSE
 CALCULATIONS. APSP 7-13 SEC.4.4.9.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
  
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2018-05-19 Cont ID  
Sent By tklarge Date 2018-05-19 Time 03:22 Rev Time 0.00
Received By tklarge Date 2018-05-19 Time 02:49 Sent To  
Notes
2018-05-19 03:18:201) SHT. #7 - SUBMIT A CLEAR AND LEGIBLE TDH CALCULATION
 WORKSHEET. WPB AMEND. TO FBC SEC. 107.2.1.
 2) SHT. 7 - THE TDH CALCULATION WORKSHEET THAT HAS BEEN
 SUBMITTED IS BASED ON THE 2006 EDITION OF APSP 7. THE
 2013 EDITION IS IN EFFECT AS OF DECEMBER 31, 2017. THE
 SIMPLIFIED TDH CALCULATION IS NO LONGER IN THE 2013
 APSP 7. SUBMIT NEW TDH CALCULATIONS BASED ON 2013 APSP-
 7 SEC. 4.4.9.
 3) SHT. 5 - THIS SHEET STILL NOTES THAT THE TDH
 CALCULATION IS BASED ON THE MAXIMUM FLOW FROM THE PUMP
 CURVE. THIS INFORMATION NEEDS TO BE DELETED FROM THE
 PLANS.
 4) THE TDH CALCULATIONS SHALL BE THE TOTAL FROICTION
 LOSS OF THE PIPE, FITTINGS VALVES, FILTER,
 CHLORINATOR,ETC., ALL SYSTEM COMPONENTS EXCEPT THE
 PUMP.
 5) SUBMIT A COPY OF THE SIGNED POOL CONTRACT TO CONFIRM
 VALUE OF THIS PROJECT.WPB AMEND. TO FBC SEC.

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-04-19 Cont ID  
Sent By thunt Date 2018-04-19 Time 18:46 Rev Time 0.00
Received By thunt Date 2018-04-19 Time 18:46 Sent To  
Notes
2018-04-19 19:07:4104/19/2018 1ST PLUMBING REVIEW**DENIED**
  
 1) VALUE OF JOB CLAIM SEEMS TOO LOW. PROVIDE SIGNED
 BONA FIDE CONTRACT OF TOTAL JOB COST .FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL
 BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING
 ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE
 LATEST PUBLISHED DATA OF NATIONAL
 CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL-SWIFT,
 MEANS, ETC.), AS PUBLISHED BY INTERNATIONAL
 CODE CONGRESS. FINAL BUILDING PERMIT VALUATION SHALL BE
 SET BY THE BUILDING OFFICIAL.WPB AMEND TO THE 2017 6TH
 ED OF THE FBC 109.3
  
 2) AS OF 12/31/2017 THE CODE IN AFFECT IS THE 2017 6TH
 ED OF THE FBC. PLEASE REVISE YOUR PLANS TO REFLECT THIS
  
 3) SHOW PIPE SIZING BASE ON (TDH) TOTAL DYNAMIC HEAD AS
 YOU CAN NO LONGER BASE FLOW OFF THE PUMP CURVE. ANSI/
 APSP/ ICC 3 AND 7
  
 4) PLAN SHOWS POOL TO HAVE AN AUTO. PLEASE ADD NOTE
 THAT 2 BACKFLOWS WILL BE REQUIRED. 1 RPZ AT THE CITY
 METER PER THE WPB CROSS CONNECTION MANUAL ORD #2853-95
 AND 1 PVC AT THE POINT OF CONNECTION TO THE HOUSE
 SUPPLY SYSTEM. FBC-P 608.16
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status P Date   Cont ID  
Sent By mcruz Date 2018-05-17 Time   Rev Time 0.00
Received By   Date 2018-05-17 Time   Sent To P
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2018-04-17 Cont ID  
Sent By ajones Date 2018-04-17 Time 16:41 Rev Time 0.00
Received By ajones Date 2018-04-17 Time 16:41 Sent To I
Notes
***NONE***