Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-07-10 Cont ID  
Sent By rgathrig Date 2018-07-10 Time 11:17 Rev Time 0.00
Received By rgathrig Date   Time   Sent To  
Notes
2018-07-10 11:17:07PROVISO FOR SOUND TRANSMISSION TEST VERIFICATION WAS
 SUBMITTED/APPROVED UNDER 17110020 (REG)

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2018-04-05 Cont ID  
Sent By aclange Date 2018-04-05 Time 10:07 Rev Time 0.00
Received By aclange Date 2018-04-05 Time 08:39 Sent To  
Notes
2018-04-05 10:07:04ACTION: BUILDING PROVISO
 1) SUFFOLK CONSTRUCTION TO CONDUCT SITE TESTING FOR
 COMPLIANCE WITH THE 2010 FBC-B SECTIONS:
 FBC-B 2010 1207.3 STRUCTURE-BORNE SOUND.
 FBC-B 2010 1207.2 AIR-BORNE SOUND.
 FLAME SPREAD- FBC-B 2014 603.1. EXCEPTION 2.
 THE SOUND TESTS WILL BE CONDUCTED ON A 10 INCH CONCRETE
 SLAB UNDER THE MAIN PERMIT (15111020) AND SUBMITTED AS
 SOON AS RESULTS ARE PRINTED AND REVIEWED BY THE
 DESIGNER OF RECORD.
 NOTE: SITE TESTING FOR FLOOR INSULATION WILL REQUIRE
 THE APPLICANT TO REQUEST (IN WRITING) UNDER THE 2010 W.
 P. B. ADMINISTRATIVE CODE SECTION 104.11 ALTERNATE
 MATERIALS, DESIGN AND METHODS OF CONSTRUCTION FOR THE
 SOUND UNDERLAYMENT. THE LETTER SHOULD BE MADE OUT TO
 THE BUILDING OFFICIAL ROBERT BROWN.
 SHEET: FINISHES. UNIT:
 FLOOR FINISHES. BLDG TYPE: TYPE I/ TYPE II FLOOR
 INSULATION (FBC-B 2010)
 FOR TILE, STONE, MARBLE, VINYL AND WOOD FLOORING ALL
 NEED TO HAVE HAD THE SOUND UNDERLAYMENT TESTED FLOOR
 ASSEMBLIES TO THE FOLLOWING STANDARDS AND MEET THE
 QUALIFICATIONS LISTED UNDER EACH OF THE STANDARDS FOR A
 10 INCH CONCRETE FLOOR ASSEMBLY AS PER PLAN OR PROVIDE
 ONSITE TESTING TO THE LISTED BELOW ASTM STANDARDS:
 PLEASE PROVIDE TEST REPORTS SHOWING COMPLIANCE WITH:
  
 1A) FBC-B 2014 1207.3 STRUCTURE-BORNE SOUND.
 FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR
 BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA
 WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION
 CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD
 TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E 492.
  
 1B) FBC-B 2014 1207.2 AIR-BORNE SOUND.
 WALLS, PARTITIONS AND FLOOR/CEILING ASSEMBLIES
 SEPARATING DWELLING UNITS FROM EACH OTHER OR FROM
 PUBLIC OR SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION
 CLASS (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED)
 FOR AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM
 E 90.
  
 1C) FLAME SPREAD- FBC-B 2014 603.1. EXCEPTION 2.
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200.
  
 FLAME SPREAD INDEX. A COMPARATIVE MEASURE, EXPRESSED AS
 A DIMENSIONLESS NUMBER, DERIVED FROM VISUAL
 MEASUREMENTS OF THE SPREAD OF FLAME VERSUS TIME FOR A
 MATERIAL TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723.
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-04-19 Cont ID  
Sent By jleahy Date 2018-04-19 Time 14:58 Rev Time 0.00
Received By jleahy Date 2018-04-19 Time 14:58 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2018-04-20 Time   Rev Time 0.00
Received By lmarchan Date 2018-04-04 Time 16:47 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2018-04-20 Cont ID  
Sent By ccole Date 2018-04-20 Time 16:30 Rev Time 0.00
Received By ccole Date 2018-04-20 Time 16:29 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2018-04-05 Cont ID  
Sent By aclange Date 2018-04-05 Time 10:07 Rev Time 0.00
Received By aclange Date 2018-04-05 Time 10:07 Sent To  
Notes
2018-04-20 16:30:53MECH SIGS GOOD/CCOLE
2018-04-05 10:07:30SIGNATURES OK