2018-04-03 15:29:55 | 04/03/2018 1ST GAS REVIEW**DENIED** |
| |
| 1) PER F.A.C RULE-61G1-16.001 COPIES OF SIGNATURE AND |
| SEAL ARE NOT PERMITTED AND MUST BE WET |
| |
| 2) VALUE OF JOB SEEMS LOW. PROVIDE A SIGNED BONA FIDE |
| CONTRACT. 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE |
| OPINION OF THE BUILDING OFFICIAL, THE CLAIMED VALUATION |
| OF |
| BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, |
| MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE |
| UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| DENIED, UNLESS THE APPLICANT CAN SHOW |
| DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED |
| CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE |
| APPROVAL OF THE BUILDING OFFICIAL. FOR PERMITTING |
| PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL |
| BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING |
| ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE |
| LATEST PUBLISHED DATA OF NATIONAL CONSTRUCTION |
| COST ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), |
| AS PUBLISHED BY INTERNATIONAL CODE CONGRESS. |
| FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE |
| BUILDING OFFICIAL. |
| |
| 3) AS YOU ARE CHANGING THE LOCATION OF THE 2ND STAGE |
| REGUALTOR AND THE TANK PROVIDE A ISOMETRIC DRAWING TO |
| INCLUDE THE CUT SECTION OF PIPING FROM THE NEW L.P TANK |
| TO THE BUILDING INLET. FBC 107.3.5 |
| |
| 4) PLEASE PROVIDE 2 COPIES OF ALL PAPERWORK. YOU HAVE |
| INCLUDED ONLY 1 SET OF GAS REGUALTOR MANUFACTURE |
| INSTALLATION MANUAL. FBC 107.3.5 |
| |
| TIM HUNT |
| PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| BUILDING DIVISION |
| 561-805-6695 |
| [email protected] |
| |