Plan Review Details - Permit 18030258
Plan Review Stops For Permit 18030258 |
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
P |
Date |
2020-12-09 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-12-09 |
Time |
04:41 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-12-09 |
Time |
04:14 |
Sent To |
|
|
Notes |
2020-12-09 04:22:25 | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | 1) FLOOR PLAN PROVIDED MUST INCLUDE MEASURMENT FROM | | INSIDE CORNER AND OUTSIDE CORNER. FBC 107.2.1 | | | | 2) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL | | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE | | CORRUGATED STAINLESS STEEL TUBING | | | | (IF APPLICABLE) FOR EACH PIPE SIZE. WPB AMENDMENTS TO | | FBC SEC.107.2.1 | | | | 3) TYPE OF GAS (LP OR NATURAL). FBC 107.2.1 | | | | 4) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS / | | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY | | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND | | FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 | | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED | | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS | | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF | | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. | | | | 5) ) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES | | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE | | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM | | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE | | DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL | | GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4 | | (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4, | | G2412.8, G2413.1, G2413.2, & G2413.3. | | | | 6) ) THE PLANS INDICATE AN EXISTING GAS METER. THE LINE | | 1" AT THE POOL HEATER IS UNDERSIZED ON WITH THE ADDING | | OF THE TANKLESS HEATER.THE BTU LOAD OF THE EXISTING GAS | | SYSTEM MUST BE ADDED INTO THE TOTAL BTU LOAD ON THE | | SYSTEM TO ENSURE THE EXISTING SYSTEM IS PROPERLY SIZED. | | IF UNDERSIZED, THE EXISTING SYSTEM MUST BE REDONE TO | | ENSURE A SAFE OPERATING SYSTEM. SUBMIT A GAS PIPING | | RISER DIAGRAM THAT SHOWS THE TYPE OF EXISTING | | APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE PIPE | | SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE | | DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT | | OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF | | THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN | | A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO | | 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE | | EXISTING APPLIANCES. FGC SECS. 401.4, 401.8, 402.1, | | 402.2, 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1, | | G2413.2, G2413.3. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | | | | | | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2018-03-12 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2018-03-12 |
Time |
14:03 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2018-03-12 |
Time |
14:03 |
Sent To |
|
|
Notes |
2018-03-12 14:11:38 | 03/12/2018 GAS 1ST REVIEW**DENIED** | | | | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS | | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE | | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | | | 1) VALUE**THE VALVE OF JOB MUST INCLUDE TOTAL COST OF | | ALL MATERIAL INCLUDING TANKLESS.109.3 BUILDING PERMIT | | VALUATIONS. | | IF, IN THE OPINION OF THE BUILDING OFFICIAL, THE | | CLAIMED VALUATION OF | | BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, | | MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE | | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE | | DENIED, UNLESS THE APPLICANT CAN SHOW | | DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED | | CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE | | APPROVAL OF THE BUILDING OFFICIAL. FOR PERMITTING | | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL | | BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, | | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, | | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, | | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING | | ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE | | LATEST PUBLISHED DATA OF NATIONAL CONSTRUCTION | | COST ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), | | AS PUBLISHED BY INTERNATIONAL CODE CONGRESS. | | FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE | | BUILDING OFFICIAL. | | | | 2) FLOOR PLAN PROVIDED MUST INCLUDE MEASURMENT FROM | | INSIDE CORNER AND OUTSIDE CORNER. FBC 107.2.1 | | | | 3) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL | | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE | | CORRUGATED STAINLESS STEEL TUBING | | | | (IF APPLICABLE) FOR EACH PIPE SIZE. WPB AMENDMENTS TO | | FBC SEC.107.2.1 | | | | 4) TYPE OF GAS (LP OR NATURAL). FBC 107.2.1 | | | | 5) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / | | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY | | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND | | FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 | | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED | | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS | | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF | | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. | | | | 6) ) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES | | USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE | | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM | | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE | | DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL | | GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4 | | (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4, | | G2412.8, G2413.1, G2413.2, & G2413.3. | | | | 7) ) THE PLANS INDICATE AN EXISTING GAS METER. THE LINE | | 1" AT THE POOL HEATER IS UNDERSIZED ONWITH THE ADDING | | OF THE TANKLESS HEATER.THE BTU LOAD OF THE EXISTING GAS | | SYSTEM MUST BE ADDED INTO THE TOTAL BTU LOAD ON THE | | SYSTEM TO ENSURE THE EXISTING SYSTEM IS PROPERLY SIZED. | | IF UNDERSIZED, THE EXISTING SYSTEM MUST BE REDONE TO | | ENSURE A SAFE OPERATING SYSTEM. SUBMIT A GAS PIPING | | RISER DIAGRAM THAT SHOWS THE TYPE OF EXISTING | | APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE PIPE | | SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE | | DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT | | OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF | | THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN | | A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO | | 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE | | EXISTING APPLIANCES. FGC SECS. 401.4, 401.8, 402.1, | | 402.2, 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1, | | G2413.2, G2413.3. | | | | | | | | | | TIM HUNT | | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER | | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | 561-805-6695 | | [email protected] | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-12-09 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-12-09 |
Time |
04:42 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-12-09 |
Time |
04:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-03-12 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2018-03-12 |
Time |
14:12 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2018-03-06 |
Time |
10:38 |
Sent To |
I |
|
Notes |
2018-03-07 10:38:42 | PLUMB<5K |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2020-12-09 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2020-12-09 |
Time |
04:41 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2020-12-09 |
Time |
04:14 |
Sent To |
|
|
Notes |
2020-12-09 04:20:08 | 03/12/2018 PLUMBING 1ST REVIEW**DENIED** | | | | | | 1) PROVIDE MANUFACTURES INSTALLATION MANUAL FOR | | TANKLESS. FBC 107.2.1***SEE GAS REVIEW COMMENTS** | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2018-03-12 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2018-03-12 |
Time |
14:00 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2018-03-12 |
Time |
14:00 |
Sent To |
|
|
Notes |
2018-03-12 14:03:23 | 03/12/2018 PLUMBING 1ST REVIEW**DENIED** | | | | | | 1) VALUE* 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE | | OPINION OF THE BUILDING OFFICIAL, THE CLAIMED VALUATION | | OF | | BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, | | MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE | | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE | | DENIED, UNLESS THE APPLICANT CAN SHOW | | DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED | | CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE | | APPROVAL OF THE BUILDING OFFICIAL. FOR PERMITTING | | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL | | BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, | | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, | | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, | | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING | | ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE | | LATEST PUBLISHED DATA OF NATIONAL CONSTRUCTION | | COST ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), | | AS PUBLISHED BY INTERNATIONAL CODE CONGRESS. | | FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE | | BUILDING OFFICIAL. | | | | 2) PROVIDE MANUFACTURES INSTALLATION MANUAL FOR | | TANKLESS. FBC 107.2.1***SEE GAS REVIEW COMMENTS** | | | | TIM HUNT | | PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER | | CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | 561-805-6695 | | [email protected] | | |
|
|
|