2018-03-09 06:21:41 | 03/09/2018 GAS 1ST REVIEW**DENIED** |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| |
| 1) PERMIT VALUE**THE VALUE MUST INCLUDE THE COST OF THE |
| STOVE AND TANKLESS WATER HEATER, LABOR, OVERHEAD, |
| MATERIAL, AND PROFIT. |
| 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE OPINION OF |
| THE BUILDING OFFICIAL, THE CLAIMED VALUATION OF |
| BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, |
| MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE |
| UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| DENIED, UNLESS THE APPLICANT CAN SHOW |
| DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED |
| CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE |
| APPROVAL OF THE BUILDING OFFICIAL. FOR PERMITTING |
| PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL |
| BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING |
| ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE |
| LATEST PUBLISHED DATA OF NATIONAL CONSTRUCTION |
| COST ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), |
| AS PUBLISHED BY INTERNATIONAL CODE CONGRESS. |
| FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE |
| BUILDING OFFICIAL. |
| |
| 2) SUPPLY MANUFACTURE MANUALS MIN 2 COPIES AND CHOSE |
| WHICH MODEL IS BEING INSTALL FOR THE STOVE. FBC 107.2.1 |
| |
| 3) PROVIDE CURRENT RINNAI MANUFACTURE MANUAL. YOUR |
| PROVIDED IS FROM 2015 AND HAS BEEN UPDATED. SUBMIT |
| MANUFACTURER?S SPECIFICATION SHEETS / INSTALLATION |
| MANUAL FOR ALL GAS EQUIPMENT TO VERIFY COMPLIANCE WITH |
| STANDARDS NFPA 54, NFPA 58, AND FBC-2014 FUEL GAS CODE |
| SEC. 402.2, AND 301.3 OR 2014 FBC-RES. SEC. G2404.3. |
| GAS APPLIANCES SHALL BE LISTED AND LABELED. THE |
| INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT |
| SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC |
| SEC.305.1, FBC-RES. SEC.G2408.1. |
| |
| 4) TYPE OF GAS (LP OR NATURAL). FBC 107.2.1 |
| |
| 5) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. |
| SEC. G2413.2. |
| |
| 6) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION |
| AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN |
| RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER |
| HEATER SHALL COMPLY WITH THE MANUFACTURER'S |
| INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND |
| DRAWN. WPB AMEND. TO FBC SEC. 107.2.1. |
| |
| 7) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS |
| APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED BY THE |
| BUILDING?S MECHANICAL VENTILATION SYSTEM, THE SYSTEM |
| SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN |
| ADDITION TO THE REQUIRED VENTILATION AIR. FGC |
| SEC.304.9.3 OR FBCR G2407.9.3. |
| |
| 8) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE |
| PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM |
| THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE |
| DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL |
| GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4 |
| (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4, |
| G2412.8, G2413.1, G2413.2, & G2413.3. |
| |
| TIM HUNT |
| PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| BUILDING DIVISION |
| 561-805-6695 |
| [email protected] |
| |