Plan Review Details - Permit 18021094
Plan Review Stops For Permit 18021094
Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-02-10 Cont ID  
Sent By tklarge Date 2020-02-10 Time 12:37 Rev Time 0.00
Received By tklarge Date 2020-02-10 Time 12:37 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-02-28 Cont ID  
Sent By thunt Date 2018-02-28 Time 17:23 Rev Time 0.00
Received By thunt Date 2018-02-26 Time 09:23 Sent To I
Notes
2018-02-27 09:24:10PLUMB <5K

Review Stop P PLUMBING
Rev No 2 Status P Date 2020-02-10 Cont ID  
Sent By tklarge Date 2020-02-10 Time 12:37 Rev Time 0.00
Received By tklarge Date 2020-02-10 Time 12:37 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-02-28 Cont ID  
Sent By thunt Date 2018-02-28 Time 17:22 Rev Time 0.00
Received By thunt Date 2018-02-28 Time 17:22 Sent To  
Notes
2018-02-28 17:47:0402/28/2018 1ST PLUMBING REVIEW**DENIED**
  
  
 A STOP WORK ORDER WAS ISSUED ON 01/17/2018 DURING THE
 DEMO OF THE BATH TUB. BOTH OWNER AND PLUMBERS ON-SITE
 HAD BEEN ADVISED TO CEASE ALL WORK UNTIL PERMIT WAS
 ISSUED AND APPROVED INSPECTIONS HELD. THIS WAS IGNORED
 AND THE JOB WAS FOUND TO BE COMPLETED DURING A STATUS
 CHECK OF THE STOP WORK ORDER THAT WAS PERFORMED ON
 02/22/2018 COMFIRMED BY THE OWNER.1 OF THE FOLLOWING 2
 OPTIONS BELOW MUST HAPPEN IN ORDER FOR THIS PERMIT TO
 BE ISSUED BY 03/12/2018 OR THE VIOLATION WILL BE
 FORWARDED TO THE SPECIAL MAGISTRATE FOR A HEARING.
  
 1) THE REMOVAL OF ALL MATERIALS DOWN TO THE BARE WALLS
 SAME AS WHICH THE INSPECTOR ISSUED THE STOP WORK ORDER.
  
 2) A SIGN LETTER FROM YOU ( GEORGE BEYS) ACKNOWLEDGING
 THE WORK HAS BEEN PERFORMED WITH OUT PERMITS AND
 BENEFIT OF CITY OF WEST PALM BEACH INSPECTION AS
 REQUIRED BY THE FLORIDA BUILDING CODE AND TAKING FULL
 RESPONSIBILITY OF THE ENTIRE INSTALL OF ALL COMPONENTS
 OF THIS REMODEL. A SIGED LETTER FROM THE OWNER (MR.
 ROSE) ACKNOWLEDGE HE IS AWARE OF THE CURRENT EVENTS AND
 ACCEPTS THIS COURSE OF ACTION. A MIN OF 2 HOLES CUT
 INTO THE DRYWALL IN LOCATIONS OF THE INSPECTORS CHOICE
 TO ALLOW SOME INSPECTION TO BE PERFORMED. 2- COPIES WET
 SIGNED FROM EACH
  
 MUST COMPLY WITH 1 OF THE 2 BY 03/12/2018 OR THE
 VIOLATION WILL BE FORWARDED TO THE SPECIAL MAGISTRATE
 FOR A HEARING
  
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  