Plan Review Details - Permit 18011135
Plan Review Stops For Permit 18011135
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-03-05 Cont ID  
Sent By rmcdouga Date 2018-03-05 Time 18:37 Rev Time 0.00
Received By rmcdouga Date 2018-03-05 Time 17:51 Sent To I
Notes
2018-03-05 18:48:17FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2018-02-05 Cont ID  
Sent By rmcdouga Date 2018-02-05 Time 07:51 Rev Time 0.00
Received By rmcdouga Date 2018-02-05 Time 06:47 Sent To  
Notes
2018-02-05 07:51:21PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE PLANS HAVE SEVERAL REFERENCES TO THE FBC FIFTH
 EDITION (2014). THE FBC SIXTH EDITION (2017) WENT INTO
 EFFECT ON JANUARY 1, 2018. ALL NEW PERMITS APPLIED FOR
 ON OR AFTER THAT DATE ARE REQUIRED TO COMPLY WITH AND
 REFERENCE THE FBC SIXTH EDITION (2017).
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-03-05 Cont ID  
Sent By jleahy Date 2018-03-05 Time 17:26 Rev Time 0.00
Received By jleahy Date 2018-03-05 Time 17:26 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2018-02-12 Cont ID  
Sent By jleahy Date 2018-02-12 Time 07:22 Rev Time 0.00
Received By jleahy Date 2018-02-12 Time 07:22 Sent To I
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2018-02-09 Cont ID  
Sent By tklarge Date 2018-02-09 Time 05:49 Rev Time 0.00
Received By tklarge Date 2018-02-09 Time 05:48 Sent To  
Notes
2018-02-09 05:50:33THERE IS NO GAS HEATER ON THIS POOL.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-03-05 Cont ID  
Sent By rmcdouga Date 2018-03-05 Time 18:37 Rev Time 0.00
Received By rmcdouga Date 2018-02-27 Time 09:25 Sent To  
Notes
2018-02-28 09:26:04RESUB ROUTED TO AWOOTEN VIA ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-02-12 Cont ID  
Sent By jleahy Date 2018-02-12 Time 07:23 Rev Time 0.00
Received By jleahy Date 2018-01-29 Time 14:33 Sent To  
Notes
2018-01-30 14:33:24ROUTED TO ZONING

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-03-02 Cont ID  
Sent By lcrespo Date 2018-03-02 Time 18:57 Rev Time 0.00
Received By lcrespo Date 2018-03-02 Time 18:57 Sent To  
Notes
2018-03-02 18:58:44APPROVED BY PLUMBING AND PUT BACK IN POOLS, LAC

Review Stop P PLUMBING
Rev No 1 Status P Date 2018-02-09 Cont ID  
Sent By tklarge Date 2018-02-09 Time 05:48 Rev Time 0.00
Received By tklarge Date 2018-02-09 Time 05:26 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2018-03-01 Cont ID  
Sent By awooten Date 2018-03-01 Time 16:34 Rev Time 0.00
Received By awooten Date 2018-03-01 Time   Sent To E
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2018-02-02 Cont ID  
Sent By AW Date 2018-02-02 Time 13:01 Rev Time 0.00
Received By awooten Date 2018-01-31 Time 13:59 Sent To  
Notes
2018-02-02 13:01:08*********************************ZONING
 REVIEW************************************
  
 INDICATE THE REAR SETBACKS FOR THE POOL ON THE SURVEY
 (MINIMUM OF 5 FEET) AND THE SETBACKS FOR THE POOL
 EQUIPMENT (NO MORE THAN FOUR FEET INTO A SETBACK).
  
 ALANA WOOTEN
 ASSOCIATE PLANNER
 561-822-1449
 [email protected]