Plan Review Details - Permit 18010727
Plan Review Stops For Permit 18010727
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2018-02-23 Cont ID  
Sent By mgonzale Date 2018-02-23 Time   Rev Time 1.00
Received By mgonzale Date 2018-02-23 Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2018-01-29 Cont ID  
Sent By squinone Date 2018-01-29 Time   Rev Time 0.00
Received By squinone Date 2018-01-29 Time   Sent To I
Notes
2018-01-29 10:03:141) ADDRESS ZONING'S COMMENTS.
 2) THE APPLICATION AND COST ESTIMATE REFERS TO 724 PALM
 STREET, BUT THE SURVEY PLANS SHOWS 726 PALM STREET.
 PLEASE CONFIRM PROJECT LOCATION.
  
 SOFIA QUINONES-BENEJAM, EI
 PROJECT ENGINEER
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 P: 561.494.1040 EXT: 1108
 C: 561.459.6518
 F: 561.494.1116
 EMAIL: [email protected]
  
  

Review Stop HIST HISTORICAL
Rev No 2 Status P Date 2018-02-08 Cont ID  
Sent By destabro Date 2018-02-08 Time 10:48 Rev Time 0.00
Received By destabro Date 2018-02-07 Time 10:33 Sent To ENG
Notes
2018-02-08 10:48:452/8/2018 - BRICK PAVER MATERIAL MEETS THE DESIGN
 GUIDELINES FOR THE HISTORIC DISTRICT. DLE

Review Stop HIST HISTORICAL
Rev No 1 Status F Date 2018-01-26 Cont ID  
Sent By cpuell Date 2018-01-30 Time 10:00 Rev Time 0.00
Received By destabro Date 2018-01-25 Time 10:47 Sent To Z
Notes
2018-01-26 14:07:571/26/2018 - SUPPLIED SURVEY DOES NOT CORRESPOND TO SITE
 ADDRESS WHERE WORK IS TO BE PERFORMED. DLE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-02-23 Cont ID  
Sent By cpuell Date 2018-02-23 Time 11:44 Rev Time 0.00
Received By cpuell Date 2018-01-30 Time 11:12 Sent To  
Notes
2018-01-31 11:12:32RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-01-30 Cont ID  
Sent By cpuell Date 2018-01-30 Time 10:00 Rev Time 0.00
Received By cpuell Date 2018-01-19 Time 18:38 Sent To HIST
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2018-02-08 Cont ID  
Sent By destabro Date 2018-02-08 Time 10:48 Rev Time 0.00
Received By destabro Date 2018-02-08 Time 10:48 Sent To I
Notes
2018-02-08 10:49:492/8/2018 - WIDTH (9' 6") OF DRIVEWAY REPLACEMENT AND
 BRICK PAVER MATERIAL MEETS SETBACK AND MATERIAL
 REQUIREMENTS OF THE LDR. DLE

Review Stop Z ZONING
Rev No 1 Status F Date 2018-01-26 Cont ID  
Sent By destabro Date 2018-01-26 Time 14:08 Rev Time 0.00
Received By destabro Date 2018-01-26 Time 14:08 Sent To ENG
Notes
2018-01-26 14:08:161/26/2018 - SUPPLIED SURVEY DOES NOT CORRESPOND TO SITE
 ADDRESS WHERE WORK IS TO BE PERFORMED. DLE


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved