Plan Review Details - Permit 18010036
Plan Review Stops For Permit 18010036
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2018-01-29 Cont ID  
Sent By thunt Date 2018-01-29 Time 05:07 Rev Time 0.00
Received By thunt Date 2018-01-29 Time 05:07 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2018-01-08 Cont ID  
Sent By thunt Date 2018-01-08 Time 05:22 Rev Time 0.00
Received By thunt Date 2018-01-08 Time 05:22 Sent To  
Notes
2018-01-08 05:25:0101/08/2018 GAS / 1ST REVIEW**DENIED**
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1 ) CITY RECORDS INDICATE AN EXISTING GAS METER. THE
 BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO
 THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING
 SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING
 SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING
 SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS
 THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH
 APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH
 APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF
 PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE
 EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE
 SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE
 REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES.
 FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR
 SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3
  
 2) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL
 GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4
 (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4,
 G2412.8, G2413.1, G2413.2, & G2413.3
  
 3) INDICATE ON THE PLAN IF THE TANKLESS WATER HEATER IS
 REPLACING AN EXISTING TANKLESS WATER HEATER OR IS IT
 REPLACING A STORAGE TANK TYPE WATER HEATER OR IS IT
 BEING ADDED TO THE EXISTING HOT WATER SYSTEM? INDICATE
 ON THE APPLICATION IN THE DESCRIPTION OF WORK. FBC
 107.2.1.
  
 4) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE
 LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION
 AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN
 RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER
 HEATER SHALL COMPLY WITH THE MANUFACTURER'S
 INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND
 DRAWN. WPB AMEND. TO FBC SEC. 107.2.1.
  
 5) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1.
  
 6) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1.
  
 7) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS
 SECS.401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4
 (37) OR 2014 FBC-RES. SEC. G2413
 SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL
 PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE
 CORRUGATED STAINLESS STEEL TUBING IF APPLICABLE) FOR
 EACH PIPE SIZE. WPB AMENDMENTS TO FBC SEC.107.2.1.
  
 8) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 FBC-FUEL
 GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC. G2413
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-01-29 Cont ID  
Sent By thunt Date 2018-01-29 Time 05:07 Rev Time 0.00
Received By thunt Date 2018-01-25 Time 09:27 Sent To  
Notes
2018-01-26 09:27:51RESUB ROUTED TO THUNT

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2018-01-08 Cont ID  
Sent By thunt Date 2018-01-08 Time 05:31 Rev Time 0.00
Received By thunt Date 2018-01-03 Time 14:07 Sent To  
Notes
2018-01-04 14:08:04PLUMB <5K

Review Stop P PLUMBING
Rev No 2 Status P Date 2018-01-29 Cont ID  
Sent By thunt Date 2018-01-29 Time 05:07 Rev Time 0.00
Received By thunt Date 2018-01-29 Time 05:07 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2018-01-08 Cont ID  
Sent By thunt Date 2018-01-08 Time 05:25 Rev Time 0.00
Received By thunt Date 2018-01-08 Time 05:25 Sent To  
Notes
2018-01-08 05:30:20 
 01/08/2018 PLUMBING 1ST REVIEW**DENIED**
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1) PLEASE LIST IS THIS A LIKE FOR LIKE REPLACEMENT OR
 NEW TANKLESS IN PLACE OF STORAGE TANK STYLE WATER
 HEATER. FBC 107.2.1
  
 2) PROVIDE FULL MANUFACTURES INSTALLATION MANUAL
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved