Plan Review Details - Permit 17121018
Plan Review Stops For Permit 17121018
Review Stop AD ADDRESSING
Rev No 2 Status P Date 2020-01-06 Cont ID  
Sent By cpuell Date 2020-01-06 Time 10:32 Rev Time 0.00
Received By cpuell Date 2020-01-06 Time 10:32 Sent To  
Notes
2020-01-06 10:33:20ADDRESS DETERMINED BY MORIO TO BE 411 W RAILROAD AVE ON
 7.13.19 CP

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2019-04-08 Cont ID  
Sent By rmcdouga Date 2019-04-03 Time 18:03 Rev Time 0.00
Received By rmcdouga Date 2019-03-27 Time 08:37 Sent To  
Notes
2019-04-03 18:03:30THE PERMIT CAN NOT BE ISSUED UNTIL AN ADDRESS HAS BEEN
 ASSIGNED TO THE PROPERTY. IN ORDER TO OBTAIN AN
 ADDRESS, PLEASE CONTACT MICHEAL ORIO BY PHONE AT
 561-494-1080 OR BY EMAIL AT [email protected].

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2020-01-16 Cont ID  
Sent By rmcdouga Date 2020-01-16 Time 10:42 Rev Time 0.00
Received By rmcdouga Date 2020-01-10 Time 18:14 Sent To  
Notes
2020-01-10 18:33:57PLAN REVIEW COMMENTS
  
 2ND REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) NOT ADDRESSED. NO RESPONSE TO COMMENT. ART IN PUBLIC
 PLACES
 THE CITY OF WEST PALM BEACH ART IN PUBLIC PLACES
 ORDINANCE REQUIREMENT THAT APPLIES TO ANY REMODEL OR
 NEW CONSTRUCTION PROJECT FOR WHICH THE PERMIT
 APPLICATION WAS SUBMITTED AFTER 6/29/14, AND THE TOTAL
 PROJECT CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN
 $750,000 WILL NEED TO COMPLY WITH THIS ORDINANCE.
 PER CITY OF WEST PALM BEACH ORDINANCE NO. 4504-14, AND
 CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE V,
 ART IN PUBLIC PLACES, SECTION 78-123(A) AND SECTION
 78-126(A), THE ART ASSESSMENT IS 1% OF THE TOTAL
 PROJECT CONSTRUCTION COST.
 PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE
 V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND
 NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO
 THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE
 PROJECTS.
 SEC. 78-129. - PUBLIC ART ASSESSMENT FOR PRIVATE
 DEVELOPMENT.
 (A) APPLICABILITY. THE PROVISIONS OF THIS ARTICLE AND
 THE PUBLIC ART ASSESSMENT SECTION SHALL APPLY TO ALL
 PRIVATE DEVELOPMENT PROJECTS, INCLUDING NEW
 CONSTRUCTION, OR THE RENOVATION OR IMPROVEMENT OF AN
 EXISTING BUILDING, WHERE TOTAL CONSTRUCTION COSTS ARE
 EQUAL TO OR GREATER THAN $750,000.00. ALL BUILDINGS
 WITHIN NEW PLANNED DEVELOPMENTS SHALL BE ASSESSED
 CUMULATIVELY TOWARDS THIS ART IN PUBLIC PLACES
 REQUIREMENT, EVEN IF THE BUILDINGS ARE PERMITTED
 SEPARATELY OR DEVELOPED IN PHASES. THE PROVISIONS OF
 THIS SECTION APPLY TO NEW DEVELOPMENT OR NEW
 CONSTRUCTION WITHIN EXISTING PLANNED DEVELOPMENTS.
 FOR INFORMATION PLEASE CONTACT:
 MS. SYBILLE WELTER, ART IN PUBLIC PLACES COORDINATOR AT
 822-1515 OR E-MAIL: [email protected]
  
 2) NOT ADDRESSED. NO RESPONSE TO COMMENT. THIS BUILDING
 QUALIFIES AS A THRESHOLD BUILDING AND IS REQUIRED TO
 COMPLY WITH THE FOLLOWING:
 THRESHOLD BUILDING / FL S. S. 553.71(7) "THRESHOLD
 BUILDING" MEANING ANY BUILDING WHICH IS GREATER THAN
 (3) STORIES OR 50 FT. IN HEIGHT, OR WHICH HAS AN
 ASSEMBLY OCCUPANCY CLASSIFICATION AS DENIED IN THE
 FLORIDA BUILDING CODE WHICH EXCEEDS 5,000 SQ. FT. IN
 AREA AND AN OCCUPANT CONTENT OF GREATER THAN 500
 PERSONS.
  
 A) FBC (CITY AMENDMENTS)110.8.1 THRESHOLD INSPECTION
 PLAN. THE ENFORCING AGENCY SHALL REQUIRE A SPECIAL
 INSPECTOR TO PERFORM STRUCTURAL INSPECTIONS ON A
 THRESHOLD BUILDING PURSUANT TO A STRUCTURAL INSPECTION
 PLAN PREPARED BY THE ENGINEER OF RECORD. THE STRUCTURAL
 INSPECTION PLAN MUST BE SUBMITTED TO THE ENFORCING
 AGENCY PRIOR TO THE ISSUANCE OF A BUILDING PERMIT FOR
 THE CONSTRUCTION OF A THRESHOLD BUILDING. THE PURPOSE
 OF THE STRUCTURAL INSPECTION PLAN IS TO PROVIDE
 SPECIFIC INSPECTION PROCEDURES AND SCHEDULES SO THAT
 THE BUILDING CAN BE ADEQUATELY INSPECTED FOR COMPLIANCE
 WITH THE PERMITTED DOCUMENTS.
  
 B) THRESHOLD INSPECTOR: WPB AMENDMENT 110.8.1 W.P.B.
 CONSTRUCTION SERVICES DEPARTMENT REQUEST FOR THRESHOLD
 BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY 553.79(5)
 FLORIDA STATUTES TO THE MINIMUM INSPECTIONS REQUIRED BY
 THIS CODE. THE THRESHOLD INSPECTION FORMS ARE REQUIRED
 TO BE FILED OUT BY ALL PARTIES WITH INTEREST, NOTARIZED
 AND RETURNED TO THIS OFFICE, AND REVIEWED AND APPROVED
 BEFORE PERMIT ISSUANCE WILL TAKE PLACE.
  
 C) THRESHOLD BLDG. REQUIRED STATEMENT: W.P.B. AMENDMENT
 110.8.4.4 ALL PLANS FOR THE BUILDING WHICH ARE REQUIRED
 TO BE SIGNED AND SEALED BY THE ARCHITECT OR ENGINEER OF
 RECORD CONTAIN A STATEMENT THAT, TO THE BEST OF THE
 ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND
 SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM
 BUILDING CODES AND THE APPLICABLE FIRE-SAFETY STANDARDS
 AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH
 THIS SECTION AND CHAPTER 633 FLORIDA STATUTES.
  
 D) FOR THE SPECIAL INSPECTOR PLEASE PROVIDE A RESUME OF
 INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE RESUME
 MUST BE ACCOMPANIED BY ALL CERTIFICATES AS SPECIFIED
 HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNATE WILL
 REVIEW THE RESUME. AFTER THE RESUME IS REVIEWED, AN
 INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES
 WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST
 MEETING THE ABOVE CRITERIA.
  
 E) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR HISTORY
 FOR THIS TYPE OF CONSTRUCTION.
  
 F) NOTE: FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE,
 PLEASE E-MAIL THE PERMIT LIBRARIAN OF THE PERMIT BEING
 ISSUED, THE PERMIT LIBRARIAN WILL THEN E-MAIL YOU THE
 APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR
 PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN
 COLOR, (1) FOR THE THRESHOLD INSPECTOR, THE OTHER FOR
 THE MEP INSPECTORS OTHER PLANS YOU WISH TO PRINT MAYBE
 IN BLACK & WHITE.
  
 G) 110.8.4.3 ALL SHORING AND RESHORING PROCEDURES,
 PLANS AND DETAILS SHALL BE SUBMITTED TO THE ENFORCEMENT
 AGENCY FOR RECORDKEEPING. EACH SHORING AND RESHORING
 INSTALLATION SHALL BE SUPERVISED, INSPECTED AND
 CERTIFIED TO BE IN COMPLIANCE WITH THE SHORING
 DOCUMENTS BY THE CONTRACTOR.
  
 H) PLEASE CALL THE CITY OF WEST PALM BEACH'S AUTOMATED
 TELEPHONE INSPECTIONS LINE (561) 805-6700 FOR ALL
 BUILDING INSPECTIONS FOR AUDITING OF JOBSITE
 INSPECTIONS WITHOUT THIS THE PERMIT EXPIRES IN 6
 MONTHS, ABANDONMENT OF JOB, NO INSPECTION ACTIVITY.
  
 I) 110.8 THRESHOLD BUILDINGS, OPERATING GUIDELINES FOR
 THRESHOLD INSPECTORS #25. ASSURE THAT THE DESIGNER HAS
 REQUIRED ON THE PLANS OR SPECIFICATIONS ONE MATERIAL,
 APPROVED FOR FIRE STOPPING PENETRATIONS, FOR WALLS AND
 CEILINGS.
  
 J) PLEASE CONTACT ME WITH AN EMAIL ADDRESS AND I WILL
 BE HAPPY TO SEND YOU A COPY OF THE OCTOBER 2018
 GUIDELINES AND POLICIES FOR PROJECTS CONCERNING
 THRESHOLD/SPECIAL INSPECTORS AND RESIDENT INSPECTORS.
  
 3) NO RESPONSE TO COMMENT. 109.3 BUILDING PERMIT
 VALUATION.
 IF, IN THE OPINION OF THE BUILDING OFFICIAL, THE
 CLAIMED VALUATION OF BUILDING, ALTERATION, STRUCTURE,
 ELECTRICAL, GAS, MECHANICAL, OR PLUMBING SYSTEMS
 APPEARS TO BE UNDER ESTIMATED ON THE APPLICATION, THE
 PERMIT SHALL BE DENIED. FOR PERMITTING PURPOSES,
 VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL
 REPLACEMENT PURPOSES, VALUATION OF BUILDINGS AND
 SYSTEMS SHALL BE THE TOTAL REPLACEMENT VALUE TO INCLUDE
 STRUCTURAL, ELECTRICAL, PLUMBING, MECHANICAL, INTERIOR
 FINISHES, NORMAL SITE WORK (EXCAVATION AND BACKFILL FOR
 BUILDINGS), ARCHITECTURAL AND DESIGN FEES, MARKETING
 COST, OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.) WITH REGIONAL ADJUSTMENTS
 FOR LOCATION AS PUBLISHED BY THE INTERNATIONAL CODE
 CONGRESS.
  
 THIS MAIN BUILDING PERMIT WILL INCLUDE THE FEES FOR THE
 MECHANICAL, ELECTRICAL, PLUMBING & ROOFING PERMITS.
 WHEN THE GENERAL CONTRACTOR COMES IN FOR A BUILDING
 PERMIT WITH THE SIGNED PERMIT APPLICATION FORM BY THE
 QUALIFIER AND OWNER AND BRINGS IN THE LISTED
 SUB-PERMITS M-E-P & ROOFING PERMITS SIGNED BY THE
 QUALIFIER OF EACH COMPANY, THEIR INSURANCES AND
 LICENSURE UP TO DATE, THE M-E-P AND ROOFING PERMITS ARE
 FREE OF CHARGE. IF THE M-E-P & ROOFING PERMITS COME IN
 LATER THERE WILL BE AN $80.00 ADMINISTRATIVE FEE FOR
 EACH PERMIT.
  
 ALL OTHER PERMITS FIRE SPRINKLER, FIRE ALARM, RACK
 STORAGE, EXHAUST HOODS, ANSUL SYSTEMS OR ALTERNATIVE
 AUTOMATIC FIRE-EXTINGUISHING SYSTEMS, WALK IN COOLERS &
 FREEZERS, ALL LOW VOLTAGE PERMITS, GENERATORS & FUEL
 TANKS, GAS PERMIT, POOL, JACUZZI AND ASSOCIATED
 SUB-PERMITS, AWNING, SCREEN ENCLOSURES, CANOPY, FENCE,
 LANDSCAPE, IRRIGATION, AUGER CAST PILE AND OR
 FOUNDATION OR STRUCTURE ONLY PERMIT WILL BE SEPARATE
 REVIEWS AND ASSOCIATED FEES WITH EACH PERMIT.
 PLEASE PROVIDE AN ITEMIZED LIST AND SUBTRACT THESE LINE
 ITEMS AND THEIR VALUE FROM THE OVERALL BUILDING VALUE
 STATED ON THE PERMIT APPLICATION FOR THIS PROJECT. THE
 REMAINING BALANCE WILL EFFECTIVELY BE THE VALUE OF THE
 BUILDING THAT THE PERMIT FEES WILL BE BASED ON FOR THIS
 PERMIT. THE BUILDING DEPARTMENT DOES NOT WANT TO
 COLLECT TWICE FOR THE VALUE OF THESE SUB-PERMITS NOT
 COVERED UNDER THE PRIME OR MASTER PERMIT.
  
 4) NOT ADDRESSED. NO RESPONSE TO COMMENT. PROVIDE A PER
 FLOOR AREA BREAKDOWN FOR EACH OCCUPANCY TYPE ON THAT
 FLOOR. THIS IS REQUIRED IN ORDER TO DO AN ACCURATE
 VALUATION AMOUNT FOR THE BUILDING. FBC 109.3
  
 5) NOT ADDRESSED. NO RESPONSE TO COMMENT. THE
 STRUCTURAL DRAWINGS HAVE NOT BEEN SIGNED AND SEALED BY
 THE DESIGN PROFESSIONAL OF RECORD AS REQUIRED BY FS 471
 OR FS 481 AND ARE MARKED "NOT FOR CONSTRUCTION".
  
 6) NOT ADDRESSED. THE ARCHITECT'S RESPONSE LETTER
 REFERS TO AN OWNER'S RESPONSE LETTER WHICH WAS NOT
 FOUND IN NOT ADDRESSED. THE CONSTRUCTION DOCUMENTS.
 SPECIFY ON THE PLANS THAT THE EXTENDED STAY ROOMS WILL
 NOT BE RENTED OR LEASED TO THE SAME OCCUPANT FOR MORE
 THAN THIRTY DAYS. THE CODE ANALYSIS ON SHEET A-1.00A,
 SPECIFIES THE HOTEL AND EXTENDED STAY ROOMS AS
 OCCUPANCY GROUP AS R-1. THE EXTENDED STAY ROOMS PROVIDE
 COMPLETE INDEPENDENT LIVING FACILITIES INCLUDING
 PERMANENT PROVISIONS FOR COOKING AND MEET THE
 DEFINITION OF A DWELLING UNIT IN CHAPTER 2 OF THE
 BUILDING CODE. WILL THE EXTENDED STAY ROOMS BE RENTED
 OR LEASED TO THE SAME OCCUPANT FOR MORE THAN 30 DAYS?
 IF SO, THEY ARE CLASSIFIED AS HOTEL (NON-TRANSIENT) AND
 GROUP R-2. THIS WILL REQUIRE THESE ROOMS TO TO COMPLY
 WITH FAIR HOUSING GUIDELINES. FBC SECTION 310
  
 7) NOT ADDRESSED. NO RESPONSE TO COMMENT. SUBMIT THE
 APPROPRIATE FORMS TO SHOW COMPLIANCE WITH THE SECTION
 C401.2 OF THE 2014 FBC ENERGY CONSERVATION.
  
 8) NOT ADDRESSED. NO RESPONSE TO COMMENT. SUBMIT A
 GEOTECHNICAL (SOIL INVESTIGATION) REPORT FOR THE
 PROJECT. FBC 1803
  
 9) COMPLIED.
  
 10) COMPLIED.
  
 11) COMPLIED.
  
 12) COMPLIED.
  
 13) COMPLIED.
  
 14) COMPLIED.
  
 15) NOT COMPLETELY ADDRESSED. IT DOES NOT APPEAR THAT
 THE ROOMS ARE ADEQUATELY DISPERSED AS REQUIRED BY FBC
 ACCESSIBILITY SECTION 224.5 WITH REGARD TO LOCATION AND
 VIEWS. THE FBC ACCESSIBILITY TABLE 224.4 REQUIRES 17
 GUEST ROOMS WITH COMMUNICATION FEATURES. SECTION 224.5
 DISPERSION REQUIRES AT LEAST ONE GUEST ROOM REQUIRED TO
 PROVIDE MOBILITY FEATURES COMPLYING WITH 806.2 SHALL
 ALSO PROVIDE COMMUNICATION FEATURES COMPLYING WITH
 806.3. NOT MORE THAN 10 PERCENT OF GUEST ROOMS REQUIRED
 TO PROVIDE MOBILITY FEATURES COMPLYING WITH 806.2 SHALL
 BE USED TO SATISFY THE MINIMUM NUMBER OF GUEST ROOMS
 REQUIRED TO PROVIDE COMMUNICATION FEATURES COMPLYING
 WITH 806.3. TEN PERCENT OF THE 10 REQUIRED GUEST ROOMS
 WITH MOBILITY FEATURES IS ONE (1). THEREFORE, ONLY ONE
 OF THE REQUIRED 17 GUEST ROOMS WITH COMMUNICATION
 FEATURES CAN BE A GUEST ROOM WITH MOBILITY FEATURES.
 PLEASE REVISE PLANS TO COMPLY.
  
 16) COMPLIED.
  
 17) NOT ADDRESSED. NO RESPONSE TO COMMENT. SPECIFY THE
 LIVE LOADS REQUIRED BY FBC TABLE 1607.1 FOR EACH AREA
 OF THE BUILDING ON THE PLANS.
  
 18) NOT CORRECTLY ADDRESSED. THE OPENING CALCULATIONS
 ON SHEET A-1.00A DO NOT USE THE ENTIRE PERIMETER WALL
 AREA OR THE TOTAL PERIMETER LENGTH OF ALL FOUR SIDES OF
 EACH TIER OF THE PARKING GARAGE AS REQUIRED BY FBC
 406.5. THE PLANS SPECIFY THAT THE PARKING GARAGE IN
 THIS BUILDING IS AN OPEN GARAGE. THIS DOES NOT APPEAR
 TO BE AN OPEN GARAGE. THE OPENINGS DO NOT MEET THE
 REQUIREMENT OF FBC 406.5.2 FOR BEING UNIFORMLY
 DISTRIBUTED ON AT LEAST TWO SIDES OF THE STRUCTURE. THE
 CALCULATIONS FOR THE AREA OF OPENINGS IN THE EXTERIOR
 WALLS APPEARS TO BE INCORRECT. FBC 406.5 REQUIRES THE
 AREA OF SUCH OPENINGS IN EXTERIOR WALLS ON A TIER TO BE
 NOT LESS THAN 20 PERCENT OF THE TOTAL PERIMETER WALL
 AREA OF EACH TIER. REVISE PLANS FOR AN ENCLOSED GARAGE.
  
 19) COMPLIED.
  
 20) NOT COMPLETELY ADDRESSED. NOT ALL OF THE REQUESTED
 INFORMATION HAS BEEN PROVIDED.
 THE LIFE SAFETY PLANS NEED TO SHOW THE FOLLOWING FOR
 EACH FLOOR:
 A) THE NUMBER OF OCCUPANTS IN EACH AREA FBC 1004.1
 B) THE CUMULATIVE OCCUPANT LOADS FBC 1004.1.1
 C) THE EXIT SEPARATION DISTANCE FBC 1015.2.1
 D) THE COMMON PATH OF EGRESS TRAVEL DISTANCE FBC 1014.3
 E) THE EXIT ACCESS TRAVEL DISTANCE FBC 1016.3
 F) THE CLEAR WIDTH OF THE EXIT OR EXIT ACCESS DOORS FBC
 1008.1.1
 G) THE CAPACITY OF EGRESS DOORS, OCCUPANT LOAD SERVED
 AND MEANS OF EGRESS FACTOR FBC1005.3.2
 H) THE DISTRIBUTION OF EGRESS CAPACITY FBC1005.5
  
 21) COMPLIED.
  
 22) NOT COMPLETELY ADDRESSED. THE LINEN AND TRASH CHUTE
 DISCHARGE ROOMS HAVE TO BE IDENTIFIED AND SEPARATED ON
 THE PLANS.FBC 713.13 THE LINEN CHUTE SECTION ON SHEET
 A-6.02 HAS THE TERMINATION ROOM AND THE ACCESS ROOMS
 LABELED AS GARBAGE ROOMS. PLEASE CORRECT. FBC 713.13.1
  
 23) COMPLIED.
  
 24) COMPLIED.
  
 25) COMPLIED.
  
 26) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A
 RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE
 CITY RE-SUBMITTAL FORM.
  
 NEW COMMENTS
  
 27) SPECIFY THE EXIT SEPARATION DISTANCE FOR THE
 RESTAURANT AREA LOCATED ON THE GROUND FLOOR.
  
 28) SHOW THAT THE LOCATION OF THE EXERCISE MACHINES AND
 EQUIPMENT IN THE GYM WILL COMPLY WITH THE REQUIREMENTS
 OF 2014 FBC ACCESSIBILITY SECTIONS 236 AND 1004.
  
 29) SHOW THAT THE BAR IN THE RESTAURANT COMPLIES WITH
 2014 FBC ACCESSIBILITY SECTIONS 226 AND 902.
  
 30) SHOW THAT THE CHECK-IN ARE SERVICE COUNTER COMPLIES
 WITH 2014 FBC ACCESSIBILITY SECTION 904.
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2019-04-19 Cont ID  
Sent By rmcdouga Date 2019-04-19 Time 18:21 Rev Time 0.00
Received By rmcdouga Date 2019-04-04 Time 08:17 Sent To  
Notes
2019-04-03 18:50:36PLAN REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) ART IN PUBLIC PLACES
 THE CITY OF WEST PALM BEACH ART IN PUBLIC PLACES
 ORDINANCE REQUIREMENT THAT APPLIES TO ANY REMODEL OR
 NEW CONSTRUCTION PROJECT FOR WHICH THE PERMIT
 APPLICATION WAS SUBMITTED AFTER 6/29/14, AND THE TOTAL
 PROJECT CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN
 $750,000 WILL NEED TO COMPLY WITH THIS ORDINANCE.
 PER CITY OF WEST PALM BEACH ORDINANCE NO. 4504-14, AND
 CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE V,
 ART IN PUBLIC PLACES, SECTION 78-123(A) AND SECTION
 78-126(A), THE ART ASSESSMENT IS 1% OF THE TOTAL
 PROJECT CONSTRUCTION COST.
 PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE
 V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND
 NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO
 THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE
 PROJECTS.
 SEC. 78-129. - PUBLIC ART ASSESSMENT FOR PRIVATE
 DEVELOPMENT.
 (A) APPLICABILITY. THE PROVISIONS OF THIS ARTICLE AND
 THE PUBLIC ART ASSESSMENT SECTION SHALL APPLY TO ALL
 PRIVATE DEVELOPMENT PROJECTS, INCLUDING NEW
 CONSTRUCTION, OR THE RENOVATION OR IMPROVEMENT OF AN
 EXISTING BUILDING, WHERE TOTAL CONSTRUCTION COSTS ARE
 EQUAL TO OR GREATER THAN $750,000.00. ALL BUILDINGS
 WITHIN NEW PLANNED DEVELOPMENTS SHALL BE ASSESSED
 CUMULATIVELY TOWARDS THIS ART IN PUBLIC PLACES
 REQUIREMENT, EVEN IF THE BUILDINGS ARE PERMITTED
 SEPARATELY OR DEVELOPED IN PHASES. THE PROVISIONS OF
 THIS SECTION APPLY TO NEW DEVELOPMENT OR NEW
 CONSTRUCTION WITHIN EXISTING PLANNED DEVELOPMENTS.
 FOR INFORMATION PLEASE CONTACT:
 MS. SYBILLE WELTER, ART IN PUBLIC PLACES COORDINATOR AT
 822-1515 OR E-MAIL: [email protected]
  
 2) THIS BUILDING QUALIFIES AS A THRESHOLD BUILDING AND
 IS REQUIRED TO COMPLY WITH THE FOLLOWING:
 THRESHOLD BUILDING / FL S. S. 553.71(7) "THRESHOLD
 BUILDING" MEANING ANY BUILDING WHICH IS GREATER THAN
 (3) STORIES OR 50 FT. IN HEIGHT, OR WHICH HAS AN
 ASSEMBLY OCCUPANCY CLASSIFICATION AS DENIED IN THE
 FLORIDA BUILDING CODE WHICH EXCEEDS 5,000 SQ. FT. IN
 AREA AND AN OCCUPANT CONTENT OF GREATER THAN 500
 PERSONS.
  
 A) FBC (CITY AMENDMENTS)110.8.1 THRESHOLD INSPECTION
 PLAN. THE ENFORCING AGENCY SHALL REQUIRE A SPECIAL
 INSPECTOR TO PERFORM STRUCTURAL INSPECTIONS ON A
 THRESHOLD BUILDING PURSUANT TO A STRUCTURAL INSPECTION
 PLAN PREPARED BY THE ENGINEER OF RECORD. THE STRUCTURAL
 INSPECTION PLAN MUST BE SUBMITTED TO THE ENFORCING
 AGENCY PRIOR TO THE ISSUANCE OF A BUILDING PERMIT FOR
 THE CONSTRUCTION OF A THRESHOLD BUILDING. THE PURPOSE
 OF THE STRUCTURAL INSPECTION PLAN IS TO PROVIDE
 SPECIFIC INSPECTION PROCEDURES AND SCHEDULES SO THAT
 THE BUILDING CAN BE ADEQUATELY INSPECTED FOR COMPLIANCE
 WITH THE PERMITTED DOCUMENTS.
  
 B) THRESHOLD INSPECTOR: WPB AMENDMENT 110.8.1 W.P.B.
 CONSTRUCTION SERVICES DEPARTMENT REQUEST FOR THRESHOLD
 BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY 553.79(5)
 FLORIDA STATUTES TO THE MINIMUM INSPECTIONS REQUIRED BY
 THIS CODE. THE THRESHOLD INSPECTION FORMS ARE REQUIRED
 TO BE FILED OUT BY ALL PARTIES WITH INTEREST, NOTARIZED
 AND RETURNED TO THIS OFFICE, AND REVIEWED AND APPROVED
 BEFORE PERMIT ISSUANCE WILL TAKE PLACE.
  
 C) THRESHOLD BLDG. REQUIRED STATEMENT: W.P.B. AMENDMENT
 110.8.4.4 ALL PLANS FOR THE BUILDING WHICH ARE REQUIRED
 TO BE SIGNED AND SEALED BY THE ARCHITECT OR ENGINEER OF
 RECORD CONTAIN A STATEMENT THAT, TO THE BEST OF THE
 ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND
 SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM
 BUILDING CODES AND THE APPLICABLE FIRE-SAFETY STANDARDS
 AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH
 THIS SECTION AND CHAPTER 633 FLORIDA STATUTES.
  
 D) FOR THE SPECIAL INSPECTOR PLEASE PROVIDE A RESUME OF
 INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE RESUME
 MUST BE ACCOMPANIED BY ALL CERTIFICATES AS SPECIFIED
 HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE WILL
 REVIEW THE RESUME. AFTER THE RESUME IS REVIEWED, AN
 INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES
 WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST
 MEETING THE ABOVE CRITERIA.
  
 E) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR HISTORY
 FOR THIS TYPE OF CONSTRUCTION.
  
 F) NOTE: FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE,
 PLEASE E-MAIL THE PERMIT LIBRARIAN OF THE PERMIT BEING
 ISSUED, THE PERMIT LIBRARIAN WILL THEN E-MAIL YOU THE
 APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR
 PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN
 COLOR, (1) FOR THE THRESHOLD INSPECTOR, THE OTHER FOR
 THE MEP INSPECTORS OTHER PLANS YOU WISH TO PRINT MAYBE
 IN BLACK & WHITE.
  
 G) 110.8.4.3 ALL SHORING AND RESHORING PROCEDURES,
 PLANS AND DETAILS SHALL BE SUBMITTED TO THE ENFORCEMENT
 AGENCY FOR RECORDKEEPING. EACH SHORING AND RESHORING
 INSTALLATION SHALL BE SUPERVISED, INSPECTED AND
 CERTIFIED TO BE IN COMPLIANCE WITH THE SHORING
 DOCUMENTS BY THE CONTRACTOR.
  
 H) PLEASE CALL THE CITY OF WEST PALM BEACH'S AUTOMATED
 TELEPHONE INSPECTIONS LINE (561) 805-6700 FOR ALL
 BUILDING INSPECTIONS FOR AUDITING OF JOBSITE
 INSPECTIONS WITHOUT THIS THE PERMIT EXPIRES IN 6
 MONTHS, ABANDONMENT OF JOB, NO INSPECTION ACTIVITY.
  
 I) 110.8 THRESHOLD BUILDINGS, OPERATING GUIDELINES FOR
 THRESHOLD INSPECTORS #25. ASSURE THAT THE DESIGNER HAS
 REQUIRED ON THE PLANS OR SPECIFICATIONS ONE MATERIAL,
 APPROVED FOR FIRE STOPPING PENETRATIONS, FOR WALLS AND
 CEILINGS.
  
 J) PLEASE CONTACT ME WITH AN EMAIL ADDRESS AND I WILL
 BE HAPPY TO SEND YOU A COPY OF THE OCTOBER 2018
 GUIDELINES AND POLICIES FOR PROJECTS CONCERNING
 THRESHOLD/SPECIAL INSPECTORS AND RESIDENT INSPECTORS.
  
 3) 109.3 BUILDING PERMIT VALUATION.
 IF, IN THE OPINION OF THE BUILDING OFFICIAL, THE
 CLAIMED VALUATION OF BUILDING, ALTERATION, STRUCTURE,
 ELECTRICAL, GAS, MECHANICAL, OR PLUMBING SYSTEMS
 APPEARS TO BE UNDER ESTIMATED ON THE APPLICATION, THE
 PERMIT SHALL BE DENIED. FOR PERMITTING PURPOSES,
 VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL
 REPLACEMENT PURPOSES, VALUATION OF BUILDINGS AND
 SYSTEMS SHALL BE THE TOTAL REPLACEMENT VALUE TO INCLUDE
 STRUCTURAL, ELECTRICAL, PLUMBING, MECHANICAL, INTERIOR
 FINISHES, NORMAL SITE WORK (EXCAVATION AND BACKFILL FOR
 BUILDINGS), ARCHITECTURAL AND DESIGN FEES, MARKETING
 COST, OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.) WITH REGIONAL ADJUSTMENTS
 FOR LOCATION AS PUBLISHED BY THE INTERNATIONAL CODE
 CONGRESS.
  
 THIS MAIN BUILDING PERMIT WILL INCLUDE THE FEES FOR THE
 MECHANICAL, ELECTRICAL, PLUMBING & ROOFING PERMITS.
 WHEN THE GENERAL CONTRACTOR COMES IN FOR A BUILDING
 PERMIT WITH THE SIGNED PERMIT APPLICATION FORM BY THE
 QUALIFIER AND OWNER AND BRINGS IN THE LISTED
 SUB-PERMITS M-E-P & ROOFING PERMITS SIGNED BY THE
 QUALIFIER OF EACH COMPANY, THEIR INSURANCES AND
 LICENSURE UP TO DATE, THE M-E-P AND ROOFING PERMITS ARE
 FREE OF CHARGE. IF THE M-E-P & ROOFING PERMITS COME IN
 LATER THERE WILL BE AN $80.00 ADMINISTRATIVE FEE FOR
 EACH PERMIT.
  
 ALL OTHER PERMITS FIRE SPRINKLER, FIRE ALARM, RACK
 STORAGE, EXHAUST HOODS, ANSUL SYSTEMS OR ALTERNATIVE
 AUTOMATIC FIRE-EXTINGUISHING SYSTEMS, WALK IN COOLERS &
 FREEZERS, ALL LOW VOLTAGE PERMITS, GENERATORS & FUEL
 TANKS, GAS PERMIT, POOL, JACUZZI AND ASSOCIATED
 SUB-PERMITS, AWNING, SCREEN ENCLOSURES, CANOPY, FENCE,
 LANDSCAPE, IRRIGATION, AUGER CAST PILE AND OR
 FOUNDATION OR STRUCTURE ONLY PERMIT WILL BE SEPARATE
 REVIEWS AND ASSOCIATED FEES WITH EACH PERMIT.
 PLEASE PROVIDE AN ITEMIZED LIST AND SUBTRACT THESE LINE
 ITEMS AND THEIR VALUE FROM THE OVERALL BUILDING VALUE
 STATED ON THE PERMIT APPLICATION FOR THIS PROJECT. THE
 REMAINING BALANCE WILL EFFECTIVELY BE THE VALUE OF THE
 BUILDING THAT THE PERMIT FEES WILL BE BASED ON FOR THIS
 PERMIT. THE BUILDING DEPARTMENT DOES NOT WANT TO
 COLLECT TWICE FOR THE VALUE OF THESE SUB-PERMITS NOT
 COVERED UNDER THE PRIME OR MASTER PERMIT.
  
 4) PROVIDE A PER FLOOR AREA BREAKDOWN FOR EACH
 OCCUPANCY TYPE ON THAT FLOOR. THIS IS REQUIRED IN ORDER
 TO DO AN ACCURATE VALUATION AMOUNT FOR THE BUILDING.
 FBC 109.3
  
 5) THE STRUCTURAL DRAWINGS HAVE NOT BEEN SIGNED AND
 SEALED BY THE DESIGN PROFESSIONAL OF RECORD AS REQUIRED
 BY FS 471 OR FS 481 AND ARE MARKED "NOT FOR
 CONSTRUCTION".
  
 6) THE CODE ANALYSIS ON SHEET A-1.00A, SPECIFIES THE
 HOTEL AND EXTENDED STAY ROOMS AS OCCUPANCY GROUP AS
 R-1. THE EXTENDED STAY ROOMS PROVIDE COMPLETE
 INDEPENDENT LIVING FACILITIES INCLUDING PERMANENT
 PROVISIONS FOR COOKING AND MEET THE DEFINITION OF A
 DWELLING UNIT IN CHAPTER 2 OF THE BUILDING CODE. WILL
 THE EXTENDED STAY ROOMS BE RENTED OR LEASED TO THE SAME
 OCCUPANT FOR MORE THAN 30 DAYS? IF SO, THEY ARE
 CLASSIFIED AS HOTEL (NON-TRANSIENT) AND GROUP R-2. THIS
 WILL REQUIRE THESE ROOMS TO TO COMPLY WITH FAIR HOUSING
 GUIDELINES. FBC SECTION 310
  
 7) SUBMIT THE APPROPRIATE FORMS TO SHOW COMPLIANCE WITH
 THE SECTION C401.2 OF THE 2014 FBC ENERGY CONSERVATION.
  
 8) SUBMIT A GEOTECHNICAL (SOIL INVESTIGATION) REPORT
 FOR THE PROJECT. FBC 1803
  
 9) FBC ACCESSIBILITY SECTION 208.2.4 REQUIRES ONE VAN
 PARKING SPACE FOR EVERY SIX OR FRACTION OF SIX
 ACCESSIBLE PARKING SPACES. SPECIFY THE LOCATION OF THE
 DESIGNATED VAN PARKING SPACES ON THE PLANS.
  
 10) THE OVERALL FLOOR PLANS LEGEND AND NOTES ON SHEET
 A-2.00 SPECIFIES THAT A SHADED AREA WILL BE INDICATED
 WHERE THE 8'-3" CLEAR AREA FOR VAN PARKING AND DRIVEWAY
 WILL BE PROVIDED. I DID NOT SEE THIS ON THE PLANS.
 PLEASE CLARIFY. FBC 107.2.1
  
 11) ON SHEET A-2.00, THE LEGEND FOR THE ONE AND TWO
 HOUR RATED WALLS IS NOT FOLLOWED ON THE PLANS. TWO
 SHORT DASHES BETWEEN THE LONG DASHES IS USED FOR THE 1
 HOUR FIRE RATED WALLS AND A LINE OF DASHES IS USED FOR
 THE 2 HOUR FIRE RATED WALLS. PLEASE REVISE. FBC 107.2.1
  
 12) THE SWIMMING POOL IS REQUIRED TO HAVE A SEPARATE
 PERMIT. ACCESS TO THE POOL AREA FROM THE BUILDING AND
 THE PRIVATE COURTYARDS ARE REQUIRED TO COMPLY WITH THE
 POOL BARRIER REQUIREMENTS OF FBC 454.2.17.
  
 13) ACCESS INTO AND OUT OF THE SWIMMING POOL IS
 REQUIRED TO BE ACCESSIBLE. FBC ACCESSIBILITY 242.2 AT
 LEAST TWO ACCESSIBILE MEANS OF ENTRY SHALL BE PROVIDED
 FOR SWIMMING POOLS. SHOW HOW THE POOL WILL COMPLY.
  
 14) THE FBC ACCESSIBILITY TABLE 224.2 REQUIRES 10 GUEST
 ROOMS WITH MOBILITY FEATURES. THREE OF THE ROOMS ARE
 REQUIRED TO HAVE ROLL-IN SHOWERS. SECTION 224.6.3
 REQUIRES A NUMBER OF ROOMS EQUALING 5% OF THE GUEST
 ROOMS MINUS THE TOTAL ACCESSIBLE ROOMS REQUIRED BY
 TABLE 224.2 TO PROVIDE SPECIAL ACCESSIBILITY FEATURES
 OF 806.4. TAKING 5 PERCENT OF 224 IS 11.2 OR 12.
 SUBTRACTING 10 FROM 12 LEAVES 2. THEREFORE IN ADDITION
 TO THE TEN (10) ADA QUEST ROOMS WITH MOBILITY FEATURES
 AN ADDITIONAL TWO (2) ROOMS WOULD BE REQUIRED TO COMPLY
 WITH 806.4. THE NUMBER OF ADA MOBILITY ROOMS SPECIFIED
 ON SHEET A-1.00A IS 14. THIS WILL MEET OR EXCEED THE
 NUMBER OF ROOMS REQUIRED.
  
 15) THE FBC ACCESSIBILITY TABLE 224.4 REQUIRES 17 GUEST
 ROOMS WITH COMMUNICATION FEATURES. SECTION 224.5
 DISPERSION REQUIRES AT LEAST ONE GUEST ROOM REQUIRED TO
 PROVIDE MOBILITY FEATURES COMPLYING WITH 806.2 SHALL
 ALSO PROVIDE COMMUNICATION FEATURES COMPLYING WITH
 806.3. NOT MORE THAN 10 PERCENT OF GUEST ROOMS REQUIRED
 TO PROVIDE MOBILITY FEATURES COMPLYING WITH 806.2 SHALL
 BE USED TO SATISFY THE MINIMUM NUMBER OF GUEST ROOMS
 REQUIRED TO PROVIDE COMMUNICATION FEATURES COMPLYING
 WITH 806.3. TEN PERCENT OF THE 10 REQUIRED GUEST ROOMS
 WITH MOBILITY FEATURES IS ONE (1). THEREFORE, ONLY ONE
 OF THE REQUIRED 17 GUEST ROOMS WITH COMMUNICATION
 FEATURES CAN BE A GUEST ROOM WITH MOBILITY FEATURES.
 PLEASE REVISE PLANS TO COMPLY.
  
 16) FBC ACCESSIBILITY SECTION 209.4 REQUIRES PARKING
 FACILITIES THAT PROVIDE VALET PARKING SERVICES TO
 PROVIDE AT LEAST ONE PASSENGER LOADING ZONE COMPLYING
 WITH SECTION 503. SHOW THAT THE PASSENGER DROP OF AREA
 ON THE PLANS COMPLIES WITH SECTION 503 OF THE FLORIDA
 ACCESSIBILITY CODE.
  
 17) SPECIFY THE LIVE LOADS REQUIRED BY FBC TABLE 1607.1
 FOR EACH AREA OF THE BUILDING ON THE PLANS.
  
 18) THE PLANS SPECIFY THAT THE PARKING GARAGE IN THIS
 BUILDING IS AN OPEN GARAGE. THIS DOES NOT APPEAR TO BE
 AN OPEN GARAGE. THE OPENINGS DO NOT MEET THE
 REQUIREMENT OF FBC 406.5.2 FOR BEING UNIFORMLY
 DISTRIBUTED ON AT LEAST TWO SIDES OF THE STRUCTURE. THE
 CALCULATIONS FOR THE AREA OF OPENINGS IN THE EXTERIOR
 WALLS APPEARS TO BE INCORRECT. FBC 406.5 REQUIRES THE
 AREA OF SUCH OPENINGS IN EXTERIOR WALLS ON A TIER TO BE
 NOT LESS THAN 20 PERCENT OF THE TOTAL PERIMETER WALL
 AREA OF EACH TIER. REVISE PLANS FOR AN ENCLOSED GARAGE.
  
 19) THERE IS A PROBLEM WITH THE CALCULATIONS FOR THE 25
 PERCENT ALLOWABLE AREA OF EXTERIOR WALL OPENINGS FOR
 THE WEST BUILDING ELEVATION. FBC 705.8.1 STATES THAT
 THE MAXIMUM AREA OF UNPROTECTED AND PROTECTED OPENINGS
 IN AN EXTERIOR WALL IN ANY STORY SHALL NOT EXCEED THE
 PERCENTAGES SPECIFIED IN TABLE 705.8. THE TABLE ALLOWS
 25 PERCENT OPENINGS FOR A FIRE SEPARATION DISTANCE OF 5
 FEET TO LESS THAN 10 FEET. THE OPENING AREA IN THE WALL
 OF THE PARKING GARAGE EXCEEDS THE ALLOWABLE OPENING
 AREA ON THE GROUND STORY AND THE MEZZANINE STORY.THE
 OPENINGS IN THE WALLS OF EACH STORY OF THE TOWERS ON
 EACH SIDE OF THE POOL DECK MEET THE 25 PERCENT
 REQUIREMENT.
  
 20) THE LIFE SAFETY PLANS NEED TO SHOW THE FOLLOWING
 FOR EACH FLOOR:
 A) THE NUMBER OF OCCUPANTS IN EACH AREA FBC 1004.1
 B) THE CUMULATIVE OCCUPANT LOADS FBC 1004.1.1
 C) THE EXIT SEPARATION DISTANCE FBC 1015.2.1
 D) THE COMMON PATH OF EGRESS TRAVEL DISTANCE FBC 1014.3
 E) THE EXIT ACCESS TRAVEL DISTANCE FBC 1016.3
 F) THE CLEAR WIDTH OF THE EXIT OR EXIT ACCESS DOORS FBC
 1008.1.1
 G) THE CAPACITY OF EGRESS DOORS, OCCUPANT LOAD SERVED
 AND MEANS OF EGRESS FACTOR FBC1005.3.2
 H) THE DISTRIBUTION OF EGRESS CAPACITY FBC1005.5
  
 21) THE WINDOW SCHEDULE ON SHEET A-8.01 LISTS TWO
 DIFFERENT WINDOWS FOR MARK "D". CLARIFY. FBC 107.2.1
  
 22) THE LINEN CHUTE SECTION ON SHEET A-6.02 HAS THE
 TERMINATION ROOM AND THE ACCESS ROOMS LABELED AS
 GARBAGE ROOMS. PLEASE CORRECT. FBC 713.13.1
  
 23) ITEM #26 ON SHEET A-6.00 SPECIFIES 1 X 4 P.T. WOOD
 IN 2 HOUR FIRE RATED SHAFTS, WHICH ARE SHOWN IN THE
 SHAFT WALL SECTIONS ON SHEET A-6.02. WOOD IS NOT
 ALLOWED IN FIRE RATED SHAFT WALLS UNLESS IT IS PART OF
 THE LISTED ASSEMBLY. CORRECT. FBC 713.2
  
 24) PROVIDE ROOF DRAINAGE, ROOF DRAIN SIZING AND
 OVER-FLOW SCUPPER CALCULATIONS. FBC 1503.4
  
 25) THE PROJECT IS NOT LOCATED IN A SPECIAL FLOOD
 HAZARD AREA. THE ELEVATIONS ON THE DRAWINGS ARE GIVEN
 IN NGVD 29 DATUM. THE CITY OF WEST PALM BEACH ADOPTED
 NEW FLOOD MAPS ON OCTOBER 5, 2017. THESE NEW MAPS USE
 NAVD 88 AS THE VERTICAL DATUM. IN ORDER TO AVOID ANY
 CONFUSION WITH ELEVATIONS IT WOULD BE GOOD TO REPLACE
 THE ELEVATIONS ON THE PLANS WITH THE CURRENT VERTICLE
 DATUM, NAVD 88 OR TO PROVIDE BOTH THE NAVD AND THE NGVD
 ELEVATIONS ON THE PLANS. FBC 107.2.1
  
 26) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A
 RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE
 CITY RE-SUBMITTAL FORM.
  
  
  
  
2019-03-27 08:10:51BUILDING PLAN REVIEW IN PROGRESS.

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2020-01-03 Cont ID  
Sent By jpearson Date 2020-01-03 Time 09:44 Rev Time 0.00
Received By jpearson Date 2020-01-03 Time 09:44 Sent To  
Notes
2020-01-03 09:44:25CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2014 5TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2014
 5TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2014
 5TH EDITION
 NEC = NFPA 70 2011 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 NO ELECTRICAL RESPONSE PROVIDED. NO NEW ELECTRICAL
 SUBMISSIONS FOR THIS REVIEW. ALL COMMENTS BELOW ARE
 FROM FIRST REVIEW.
  
 1. LABELING OF MAINS IS NOT CONSISTENT THROUGHOUT PLAN.
 THERE APPEARS TO BE A SERVICE TO THE FIRE PUMP, WHICH
 SHOULD BE LABELED AS AN ADDITIONAL SERVICE. THERE
 APPEARS TO BE AN EMERGENCY SERVICE TO THE GENERATOR
 ROOM, BUT THIS IS NOT LABLED AS AN ADDITIONAL SERVICE
 AS REQUIRED. PANEL E IN THE MAIN ELECTRICAL ROOM IS NOT
 ONE OF THE MAINS FOR SERVICE #1, AS THIS PANEL IS FED
 FROM THE EMERGNECY SERVICE LOCATED IN THE GENERATOR
 ROOM. PROVIDE CORRECTIONS AS NEEDED FOR CLARTY. WPB FBC
 107.2.1; NEC 230.2, 230.72(B)
 2. PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FOR EACH
 PANEL INCLUDING INFORMATION FROM THE POWER COMPANY
 STATING WHAT THE AVAILABLE SHORT CIRCUIT CURRENT IS FOR
 THE SERVICE TO CONFIRM THE STATED AIC RATING OF THE
 SERVICE EQUIPMENT AND DOWNSTREAM PANELS IS ADEQUATE.
 NEC 110.9, 110.10
 3. PROVIDE NOTES TO INDICATE THE REQUIRED MARKING OF
 SERVICE EQUIPMENT FOR ARC FLASH HAZARD WARNING AND
 AVAILABLE FAULT CURRENT PER CODE. NEC 110.16, 110.24
 4. PROVIDE RECEPTACLE CONTROL REQUIRED BY ASHREA 90.1:
 8.4.2. PER THIS REQUIREMENT, THE FOLLOWING SHALL BE
 AUTOMATICALLY CONTROLLED: 1) AT LEAST 50% OF ALL
 125-VOLT, 15 AND 20 AMP RECEPTACLES, IN ALL PRIVATE
 OFFICES, CONFERENCE ROOMS, ROOMS USED PRIMARILY FOR
 PRINTING AND/OR COPYING FUNCTIONS, BREAK ROOMS,
 CLASSROOMS, AND INDIVIDUAL WORKSTATIONS. 2) AT LEASE
 25% OF BRANCH CIRCUIT FEEDERS INSTALLED FOR MODULAR
 FURNITURE NOT SHOWN ON THE CONSTRUCTION DOCUMENTS. FBC
 EC 405.7.1
 5. PROVIDE THE ADDITIONAL LIGHTING CONTROLS STIPULATED
 IN THE FBC ENERGY CODE. MANY AREAS DO NOT SHOW THE
 AUTOMATIC CONTROL REQUIRED. FBC EC 405.2
 6. PROVIDE CHART OF INTERIOR LIGHTING POWER ALLOWANCES
 EXPRESSED IN WATTAGE PER THE FBC ENERGY CODE IN
 RELATION TO THE WATTAGE OF THE CONNECTED INTERIOR
 LIGHTING PROPOSED TO COMPLY WITH CODE. FBC EC 405.4.2
 7. PROVIDE VOLTAGE DROP CALCULATIONS AS REQUIRED TO
 MEET CODE. FBC EC C405.6.3
 8. PROVIDE BLOCK NOTE SHOWING COMPLIANCE FOR COMPLETION
 DOCUMENTS. FBC EC C405.6.4
 9. SHEET E-1.12 SHOWS THE ELECTRICAL ROOMS ON FLOORS 2
 THROUGH 6 FOR THE "EXTENDED SUITES" HAVING A MAIN RATED
 AS 1000 AMP, WHILE THE RISER DIAGRAM SHOWS THESE MAINS
 AS 600 AMP. PROVIDE CLARIFICATION AND/OR CORRECTIONS.
 IF THE MAINS ARE 800 AMPS OR ABOVE, PROVIDE THE PROPER
 DOOR SWING AND HARDWARE PER NEC 110.26. ADDITIONALLY,
 IT APPEARS THAT THE DIAGRAM FOR THE 3RD AND 4TH FLOOR
 WAS REPEATED AND THERE IS NO DIAGRAM FOR FLOORS 5 AND
 6. PROVIDE CORRECTIONS. WPB FBC 107.2.1
 10. NOTE ON RISER DIAGRAM SHOWS THE GENERATOR AS A
 SEPARATELY DERIVED SYSTEM. HOWEVER, THE ATS IS SHOWN AS
 A 3 POLE SWITCH, WHICH WOULD NOT BE A SEPARATELY
 DERIVED SYSTEM. PROVIDE CLARIFICATION AND CORRECTIONS
 AS NEEDED. WPB FBC 107.2.1; NEC 250.30
 11. THE ATS IS THE GENERATOR ROOM APPEARS TO BE AN
 ADDITIONAL SERVICE FOR EMERGNECY SYSTEMS, BUT IS NOT
 LABELED AS SUCH. PROVIDE CORRECTIONS TO LABELING AND
 GROUNDING OF THIS SERVICE PER CODE. NEC 230.2, 250.24,
 250.28, 250.30, 250.32, 250.35, 250.50
 12. PLAN SUBMISSION INCLUDES TWO SHEETS MARKED E-1.09
 AND THEY EACH HAVE DIFFERENT INFORMATION ON THEM.
 PROVIDE CORRECTION. WPB FBC 107.2.1
 13. PROVIDE EVIDENCE OF COMPLIANCE WITH NEC 240.87.
 14. THERE ARE SEVERAL PANELS THAT HAVE THE SAME
 IDENTIFICATION THROUGHOUT THE SYSTEM. EACH PANEL SHOULD
 HAVE A DISTINCT IDENTIFICATION FOR CLARITY. PROVIDE
 CORRECTION AND PANEL SCHEDULES TO CORRESPOND. NEC
 210.19, 215.2, 215.5, 408.4
 15. PROVIDE ACCURATE LOAD CALCULATION FOR EACH SERVICE
 AND THE CORRESPONDING MAINS TO MATCH THE INFORMATION
 PROVIDED ON THE RISER DIAGRAM. THERE ARE DISCREPANCIES
 FOR THE LABELING OF MAINS AND THE LOADS THEY FEED. NEC
 220; WPB FBC 107.2.1
 16. LOAD CALCULATION PROVIDED FOR "EXTENDED SUITES"
 STATES THAT IT IS BASED ON NEC 220.32, WHICH DOES NOT
 EXIST. PROVIDE CLARIFICATION AND CORRECTIONS. WPB FBC
 107.2.1
 17. RISER DIAGRAM SHOWS THE GENERATOR FEEDING A GUTTER
 THAT THEN FEEDS TWO DISCONNECTS, ONE FOR FIRE PUMP, AND
 ONE FOR ATS THAT FEEDS PANEL E. THE DESIGN AS SHOWN IN
 NOT CODE COMPLIANT, AS FIRE PUMP WIRING IS REQUIRED TO
 REMAIN INDEPENDENT OF ALL OTHER WIRING. PROVIDE
 CORRECTION. NEC 659.6(A)(2), 445.18
 18. IF AN ADDITIONAL DISCONNECT FOR FIRE PUMP IS TO BE
 INSTALLED AS PERMITTED IN NEC 695.4, THIS DISCONNECT
 MUST BE SUPERVISED PER ONE OF THE METHODS STIPULATED IN
 THE CODE. PROVIDE DETAIL ON PLAN FOR METHOD OF
 SUPERVISION. NEC 695.4(B)(3)(E)
 19. BE ADVISED THAT FIRE ALARM, LOW VOLTAGE SYSTEMS,
 DAS, LIGHTNING PROTECTION, GENERATORS, COMMERCIAL HOOD
 SYSTEMS, SIGNS, SITE LIGHTING, AND SWIMMING POOLS
 (WHERE APPLICABLE) ARE NOT INCLUDED IN THE SCOPE OF
 THIS PLAN REVIEW. PROVIDE A BLOCK NOTE INDICATING THE
 REQUIRED SEPARATE PERMITS AND DATA SPECIFICATION SHEET
 SUBMITTALS FOR ANY OF THESE SYSTEMS PRESENT. WPB FBC
 105.1, 107.2.1
 20. PROVIDE DETAILS OF EQIPMENT ENCLOSURES USED IN POOL
 ROOM FOR ANY ELECTRICAL EQUIPMENT. NEC TABLE 110.28
 21. VENDING MACHINES REQUIRE READILY ACCESSIBLE GFCI
 PROTECTION. PROVIDE CORRECTION. NEC 422.51
 22. SHEETS E.107, E.108, AND E.109, PROVIDE GFCI
 PROTECTION FOR ALL RECEPTACLES LOCATED IN BATHROOMS.
 NEC 210.8
 23. SHEETS CONTAINING DETAILS OF HOTEL ROOMS AND
 EXTENDED SUITES HAVE SEVERAL NOTES IN PARENTHESES THAT
 ARE NOT EXPLAINED OR DETAILED. PROVIDE CORRECTION. WPB
 FBC 107.2.1
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY
 REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED
 SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD
 SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2019-04-02 Cont ID  
Sent By jpearson Date 2019-04-02 Time 10:32 Rev Time 0.00
Received By jpearson Date 2019-03-18 Time 12:31 Sent To  
Notes
2019-03-18 12:30:34CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2014 5TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2014
 5TH ED, CHAPTER 1.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2014
 5TH EDITION
 NEC = NFPA 70 2011 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. LABELING OF MAINS IS NOT CONSISTENT THROUGHOUT PLAN.
 THERE APPEARS TO BE A SERVICE TO THE FIRE PUMP, WHICH
 SHOULD BE LABELED AS AN ADDITIONAL SERVICE. THERE
 APPEARS TO BE AN EMERGENCY SERVICE TO THE GENERATOR
 ROOM, BUT THIS IS NOT LABLED AS AN ADDITIONAL SERVICE
 AS REQUIRED. PANEL E IN THE MAIN ELECTRICAL ROOM IS NOT
 ONE OF THE MAINS FOR SERVICE #1, AS THIS PANEL IS FED
 FROM THE EMERGNECY SERVICE LOCATED IN THE GENERATOR
 ROOM. PROVIDE CORRECTIONS AS NEEDED FOR CLARTY. WPB FBC
 107.2.1; NEC 230.2, 230.72(B)
 2. PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FOR EACH
 PANEL INCLUDING INFORMATION FROM THE POWER COMPANY
 STATING WHAT THE AVAILABLE SHORT CIRCUIT CURRENT IS FOR
 THE SERVICE TO CONFIRM THE STATED AIC RATING OF THE
 SERVICE EQUIPMENT AND DOWNSTREAM PANELS IS ADEQUATE.
 NEC 110.9, 110.10
 3. PROVIDE NOTES TO INDICATE THE REQUIRED MARKING OF
 SERVICE EQUIPMENT FOR ARC FLASH HAZARD WARNING AND
 AVAILABLE FAULT CURRENT PER CODE. NEC 110.16, 110.24
 4. PROVIDE RECEPTACLE CONTROL REQUIRED BY ASHREA 90.1:
 8.4.2. PER THIS REQUIREMENT, THE FOLLOWING SHALL BE
 AUTOMATICALLY CONTROLLED: 1) AT LEAST 50% OF ALL
 125-VOLT, 15 AND 20 AMP RECEPTACLES, IN ALL PRIVATE
 OFFICES, CONFERENCE ROOMS, ROOMS USED PRIMARILY FOR
 PRINTING AND/OR COPYING FUNCTIONS, BREAK ROOMS,
 CLASSROOMS, AND INDIVIDUAL WORKSTATIONS. 2) AT LEASE
 25% OF BRANCH CIRCUIT FEEDERS INSTALLED FOR MODULAR
 FURNITURE NOT SHOWN ON THE CONSTRUCTION DOCUMENTS. FBC
 EC 405.7.1
 5. PROVIDE THE ADDITIONAL LIGHTING CONTROLS STIPULATED
 IN THE FBC ENERGY CODE. MANY AREAS DO NOT SHOW THE
 AUTOMATIC CONTROL REQUIRED. FBC EC 405.2
 6. PROVIDE CHART OF INTERIOR LIGHTING POWER ALLOWANCES
 EXPRESSED IN WATTAGE PER THE FBC ENERGY CODE IN
 RELATION TO THE WATTAGE OF THE CONNECTED INTERIOR
 LIGHTING PROPOSED TO COMPLY WITH CODE. FBC EC 405.4.2
 7. PROVIDE VOLTAGE DROP CALCULATIONS AS REQUIRED TO
 MEET CODE. FBC EC C405.6.3
 8. PROVIDE BLOCK NOTE SHOWING COMPLIANCE FOR COMPLETION
 DOCUMENTS. FBC EC C405.6.4
 9. SHEET E-1.12 SHOWS THE ELECTRICAL ROOMS ON FLOORS 2
 THROUGH 6 FOR THE "EXTENDED SUITES" HAVING A MAIN RATED
 AS 1000 AMP, WHILE THE RISER DIAGRAM SHOWS THESE MAINS
 AS 600 AMP. PROVIDE CLARIFICATION AND/OR CORRECTIONS.
 IF THE MAINS ARE 800 AMPS OR ABOVE, PROVIDE THE PROPER
 DOOR SWING AND HARDWARE PER NEC 110.26. ADDITIONALLY,
 IT APPEARS THAT THE DIAGRAM FOR THE 3RD AND 4TH FLOOR
 WAS REPEATED AND THERE IS NO DIAGRAM FOR FLOORS 5 AND
 6. PROVIDE CORRECTIONS. WPB FBC 107.2.1
 10. NOTE ON RISER DIAGRAM SHOWS THE GENERATOR AS A
 SEPARATELY DERIVED SYSTEM. HOWEVER, THE ATS IS SHOWN AS
 A 3 POLE SWITCH, WHICH WOULD NOT BE A SEPARATELY
 DERIVED SYSTEM. PROVIDE CLARIFICATION AND CORRECTIONS
 AS NEEDED. WPB FBC 107.2.1; NEC 250.30
 11. THE ATS IS THE GENERATOR ROOM APPEARS TO BE AN
 ADDITIONAL SERVICE FOR EMERGNECY SYSTEMS, BUT IS NOT
 LABELED AS SUCH. PROVIDE CORRECTIONS TO LABELING AND
 GROUNDING OF THIS SERVICE PER CODE. NEC 230.2, 250.24,
 250.28, 250.30, 250.32, 250.35, 250.50
 12. PLAN SUBMISSION INCLUDES TWO SHEETS MARKED E-1.09
 AND THEY EACH HAVE DIFFERENT INFORMATION ON THEM.
 PROVIDE CORRECTION. WPB FBC 107.2.1
 13. PROVIDE EVIDENCE OF COMPLIANCE WITH NEC 240.87.
 14. THERE ARE SEVERAL PANELS THAT HAVE THE SAME
 IDENTIFICATION THROUGHOUT THE SYSTEM. EACH PANEL SHOULD
 HAVE A DISTINCT IDENTIFICATION FOR CLARITY. PROVIDE
 CORRECTION AND PANEL SCHEDULES TO CORRESPOND. NEC
 210.19, 215.2, 215.5, 408.4
 15. PROVIDE ACCURATE LOAD CALCULATION FOR EACH SERVICE
 AND THE CORRESPONDING MAINS TO MATCH THE INFORMATION
 PROVIDED ON THE RISER DIAGRAM. THERE ARE DISCREPANCIES
 FOR THE LABELING OF MAINS AND THE LOADS THEY FEED. NEC
 220; WPB FBC 107.2.1
 16. LOAD CALCULATION PROVIDED FOR "EXTENDED SUITES"
 STATES THAT IT IS BASED ON NEC 220.32, WHICH DOES NOT
 EXIST. PROVIDE CLARIFICATION AND CORRECTIONS. WPB FBC
 107.2.1
 17. RISER DIAGRAM SHOWS THE GENERATOR FEEDING A GUTTER
 THAT THEN FEEDS TWO DISCONNECTS, ONE FOR FIRE PUMP, AND
 ONE FOR ATS THAT FEEDS PANEL E. THE DESIGN AS SHOWN IN
 NOT CODE COMPLIANT, AS FIRE PUMP WIRING IS REQUIRED TO
 REMAIN INDEPENDENT OF ALL OTHER WIRING. PROVIDE
 CORRECTION. NEC 659.6(A)(2), 445.18
 18. IF AN ADDITIONAL DISCONNECT FOR FIRE PUMP IS TO BE
 INSTALLED AS PERMITTED IN NEC 695.4, THIS DISCONNECT
 MUST BE SUPERVISED PER ONE OF THE METHODS STIPULATED IN
 THE CODE. PROVIDE DETAIL ON PLAN FOR METHOD OF
 SUPERVISION. NEC 695.4(B)(3)(E)
 19. BE ADVISED THAT FIRE ALARM, LOW VOLTAGE SYSTEMS,
 DAS, LIGHTNING PROTECTION, GENERATORS, COMMERCIAL HOOD
 SYSTEMS, SIGNS, SITE LIGHTING, AND SWIMMING POOLS
 (WHERE APPLICABLE) ARE NOT INCLUDED IN THE SCOPE OF
 THIS PLAN REVIEW. PROVIDE A BLOCK NOTE INDICATING THE
 REQUIRED SEPARATE PERMITS AND DATA SPECIFICATION SHEET
 SUBMITTALS FOR ANY OF THESE SYSTEMS PRESENT. WPB FBC
 105.1, 107.2.1
 20. PROVIDE DETAILS OF EQIPMENT ENCLOSURES USED IN POOL
 ROOM FOR ANY ELECTRICAL EQUIPMENT. NEC TABLE 110.28
 21. VENDING MACHINES REQUIRE READILY ACCESSIBLE GFCI
 PROTECTION. PROVIDE CORRECTION. NEC 422.51
 22. SHEETS E.107, E.108, AND E.109, PROVIDE GFCI
 PROTECTION FOR ALL RECEPTACLES LOCATED IN BATHROOMS.
 NEC 210.8
 23. SHEETS CONTAINING DETAILS OF HOTEL ROOMS AND
 EXTENDED SUITES HAVE SEVERAL NOTES IN PARENTHESES THAT
 ARE NOT EXPLAINED OR DETAILED. PROVIDE CORRECTION. WPB
 FBC 107.2.1
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY
 REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED
 SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD
 SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2020-01-09 Cont ID  
Sent By rrossano Date 2020-01-09 Time   Rev Time 0.00
Received By rrossano Date 2020-01-09 Time   Sent To  
Notes
2020-01-09 10:51:48PLEASE SUBMIT A FORMAL ENGINEERING SUBMITTAL TO
 ENGINEERING SERVICES FOR REVIEW.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2019-03-22 Cont ID  
Sent By shill Date 2019-03-22 Time 15:46 Rev Time 0.00
Received By shill Date 2019-03-22 Time 15:46 Sent To  
Notes
2019-03-22 15:46:47CONTACT ENGINEERING DEPARTMENT DIRECTLY AND SUBMIT
 APPLICATION IF REQUIRED
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
 ENGINEERING APPROVAL REQUIRED PRIOR TO PERMIT ISSUANCE
  
 MAIN PHONE: (561) 822-1200

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status F Date 2020-01-13 Cont ID  
Sent By pleduc Date 2020-01-13 Time   Rev Time 0.00
Received By pleduc Date 2019-12-13 Time 16:39 Sent To  
Notes
2020-01-13 12:54:42THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) SHEET A 2.01, A 5.00 & FP 2.00 - THERE APPEARS TO BE
 AN OPEN RAILING ALONG THE MEZZANINE LEVEL CREATING AN
 ATRIUM WITH NO PROTECTION.
  
 PER NFPA 101, CH 8
  
 8.6.7* ATRIUMS. UNLESS PROHIBITED BY CHAPTERS 11
 THROUGH 43, AN
 ATRIUM SHALL BE PERMITTED, PROVIDED THAT ALL OF THE
 FOLLOWING
 CONDITIONS ARE MET:
  
 (1) THE ATRIUM IS SEPARATED FROM THE ADJACENT SPACES BY
 FIRE
 BARRIERS WITH NOT LESS THAN A 1-HOUR FIRE RESISTANCE
 RATING,
 WITH OPENING PROTECTIVES FOR CORRIDOR WALLS, UNLESS ONE
 OF THE
 FOLLOWING IS MET:
 (A) THE REQUIREMENT OF 8.6.7(1) SHALL NOT APPLY TO
 EXISTING,
 PREVIOUSLY APPROVED ATRIUMS.
 (B) ANY NUMBER OF LEVELS OF THE BUILDING SHALL BE
 PERMITTED
 TO OPEN DIRECTLY TO THE ATRIUM WITHOUT ENCLOSURE, BASED
 ON THE RESULTS OF THE ENGINEERING ANALYSIS REQUIRED IN
 8.6.7(5).
 (C)* GLASS WALLS AND INOPERABLE WINDOWS SHALL BE
 PERMITTED
 IN LIEU OF THE FIRE BARRIERS WHERE ALL THE FOLLOWING
 ARE
 MET:
 I. AUTOMATIC SPRINKLERS ARE SPACED ALONG BOTH SIDES
 OF THE GLASS WALL AND THE INOPERABLE WINDOWS AT
 INTERVALS NOT TO EXCEED 6 FT (1830 MM).
 II. THE AUTOMATIC SPRINKLERS SPECIFIED IN 8.6.7(C)I ARE
 LOCATED AT A DISTANCE FROM THE GLASS WALL NOT TO
 EXCEED 12 IN. (305 MM) AND ARRANGED SO THAT THE
 ENTIRE SURFACE OF THE GLASS IS WET UPON OPERATION OF
 THE SPRINKLERS.
 III. THE GLASS WALL IS OF TEMPERED, WIRED, OR LAMINATED
 GLASS HELD IN PLACE BY A GASKET SYSTEM THAT ALLOWS
 THE GLASS FRAMING SYSTEM TO DEFLECT WITHOUT
 BREAKING (LOADING) THE GLASS BEFORE THE SPRINKLERS
 OPERATE.
 IV. THE AUTOMATIC SPRINKLERS REQUIRED BY 8.6.7(C)I ARE
 NOT REQUIRED ON THE ATRIUM SIDE OF THE GLASS WALL
 AND THE INOPERABLE WINDOW WHERE THERE IS NO
 WALKWAY OR OTHER FLOOR AREA ON THE ATRIUM SIDE ABOVE
 THE MAIN FLOOR LEVEL.
 V. DOORS IN THE GLASS WALLS OF GLASS OR OTHER MATERILA
 THAT RESISTS PASSAGE OF SMOKE.
 VI. DOORS IN THE GLASS WALLS ARE SELF-CLOSING OR
 AUTOMATIC-CLOSING UPON DETECTION OF SMOKE.
 VII. THE GLASS IS CONTINUOUS VERTICALLY, WITHOUT
 HORIZONTAL MULLIONS, WINDOW TREATMENTS, OR OTHER
 OBSTRUCTIONS THAT WOULD INTERFERE WITH THE WETTING
 OF THE ENTIRE GLASS SURFACE.
 (2) ACCESS TO EXITS IS PERMITTED TO BE WITHIN THE
 ATRIUM, AND EXIT
 DISCHARGE IN ACCORDANCE WITH 7.7.2 IS PERMITTED TO BE
 WITHIN
 THE ATRIUM.
 (3) THE OCCUPANCY WITHIN THE ATRIUM MEETS THE
 SPECIFICATIONS FOR
 CLASSIFICATION AS LOW OR ORDINARY HAZARD CONTENTS. (SEE
 6.2.2.)
 (4) THE ENTIRE BUILDING IS PROTECTED THROUGHOUT BY AN
 APPROVED,
 SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE
 WITH
 SECTION 9.7
 (5) *FOR OTHER THAN EXISTING, PREVIOUSLY APPROVED
 ATRIUMS, AN
 ENGINEERING ANALYSIS IS PERFORMED THAT DEMONSTRATES
 THAT THE
 BUILDING IS DESIGNED TO KEEP THE SMOKE LAYER INTERFACE
 ABOVE THE
 HIGHEST UNPROTECTED OPENING TO ADJOINING SPACES, OR 6
 FT (1830
 MM) ABOVE THE HIGHEST FLOOR LEVEL OF EXIT ACCESS OPEN
 TO THE
 ATRIUM, FOR A PERIOD EQUAL TO 1.5 TIMES THE CALCULATED
 EGRESS TIME
 OR 20 MINUTES, WHICHEVER IS GREATER.
 (6) *FOR OTHER THAN EXISTING, PREVIOUSLY APPROVED SMOKE
 CONTROL
 SYSTEMS, WHERE AN ENGINEERED SMOKE CONTROL SYSTEM IS
 INSTALLED TO MEET THE REQUIREMENTS OF 8.6.7, THE SYSTEM
 IS
 INDEPENDENTLY ACTIVATED BY EACH OF THE FOLLOWING:
 (A) UPON ACTUATION OF THE REQUIRED AUTOMATIC SPRINKLER
 SYSTEM
 WITHIN THE ATRIUM OR AREAS OPEN TO THE ATRIUM
 (B) MANUAL CONTROLS THAT ARE READILY ACCESSIBLE TO THE
 FIRE
 DEPARTMENT
  
 PLEASE PROVIDE DETAILS IN COMPLIANCE WITH CODE.
  
  
  
 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2019-03-08 Cont ID  
Sent By pleduc Date 2019-03-08 Time   Rev Time 0.00
Received By pleduc Date 2019-02-21 Time 14:19 Sent To  
Notes
2019-03-04 10:56:57THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
  
 1) SHEET A 2.01 - THERE IS AN INDICATION OF AN EMEGENCY
 GENERATOR. THE GENERATOR INSTALLATION SHALL BE UNDER
 SEPARATE SHOP DRAWINGS AND PERMIT.
  
 THE GENRATOR INSTALL SHALL ALSO COMPLY WITH THE
 REQUIRMENTS OF NFPA 110, TO INCLUDE TYPE
  
 PER NFPA 110
  
 CHAPTER 4 CLASSIFICATION OF EMERGENCY POWER SUPPLY
 SYSTEMS (EPSSS)
 4.1* GENERAL. THE EPSS SHALL PROVIDE A SOURCE OF
 ELECTRICAL
 POWER OF REQUIRED CAPACITY, RELIABILITY, AND QUALITY TO
 LOADS FOR
 A LENGTH OF TIME AS SPECIFIED IN TABLE 4.1(A) AND
 WITHIN A SPECIFIED
 TIME FOLLOWING LOSS OR FAILURE OF THE NORMAL POWER
 SUPPLY
 AS SPECIFIED IN TABLE 4.1(B).
  
 4.2* CLASS. THE CLASS DEFINES THE MINIMUM TIME, IN
 HOURS, FOR
 WHICH THE EPSS IS DESIGNED TO OPERATE AT ITS RATED LOAD
 WITHOUT
 BEING REFUELED OR RECHARGED. [SEE TABLE 4.1(A).]
 4.3 TYPE. THE TYPE DEFINES THE MAXIMUM TIME, IN
 SECONDS,
 THAT THE EPSS WILL PERMIT THE LOAD TERMINALS OF THE
 TRANSFER
 SWITCH TO BE WITHOUT ACCEPTABLE ELECTRICAL POWER. TABLE
 4.1(B)
 PROVIDES THE TYPES DEFINED BY THIS STANDARD.
 4.4* LEVEL. THIS STANDARD RECOGNIZES TWO LEVELS OF
 EQUIPMENT
 INSTALLATION, PERFORMANCE, AND MAINTENANCE.
 4.4.1* LEVEL 1 SYSTEMS SHALL BE INSTALLED WHERE FAILURE
 OF THE
 EQUIPMENT TO PERFORM COULD RESULT IN LOSS OF HUMAN LIFE
 OR
 SERIOUS INJURIES.
 4.4.2* LEVEL 2 SYSTEMS SHALL BE INSTALLED WHERE FAILURE
 OF THE
 EPSS TO PERFORM IS LESS CRITICAL TO HUMAN LIFE AND
 SAFETY.
 4.4.3 ALL EQUIPMENT SHALL BE PERMANENTLY INSTALLED.
 4.4.4* LEVEL 1 AND LEVEL 2 SYSTEMS SHALL ENSURE THAT
 ALL LOADS
 SERVED BY THE EPSS ARE SUPPLIED WITH ALTERNATE POWER
 THAT
 MEETS ALL THE FOLLOWING CRITERIA:
 (1) OF A QUALITY WITHIN THE OPERATING LIMITS OF THE
 LOAD
 (2) FOR A DURATION SPECIFIED FOR THE CLASS AS DEFINED
 IN TABLE
 4.1(A)
 (3) WITHIN THE TIME SPECIFIED FOR THE TYPE AS DEFINED
 IN TABLE
 4.1(B)
  
 PLEASE PROVIDE THE CLASSIFICATION, TYPE AND LEVEL ON
 THIS MASTER PLAN AND AN APPLICABLE NOTE FOR SHOP
 DRAWINGS.
  
  
 1A) SHEET M1.0A - THERE ARE NO FIRE CODE REFERENCES FOR
 REVIEW OR COMPLIANCE. THE INSTALLATION SHALL COMPLY
 WITH NFPA 110, STANDARD FOR
 EMERGENCY AND STANDBY POWER SYSTEMS, 2013 EDITION
  
 PLEASE REVIEW AND ENSURE COMPLIANCE AND PROVIDE AN
 APPLICABLE NOTE ACKNOWLEDGMENT OF THE ABOVE CODE.
  
  
  
  
  
 2) SHEET A 2.01 - THE VENTILATION/EXHAUST SYSTEMS ARE
 INDCATED WITH OPENINGS THAT MAY IN CONFLICT WITH THE
 REQUIREMENTS PER ABOVE.
  
  
 7.7 HEATING, COOLING, AND VENTILATING.
 7.7.1* WITH THE EPS RUNNING AT RATED LOAD, VENTILATION
 AIRFLOW
 SHALL BE PROVIDED TO LIMIT THE MAXIMUM AIR TEMPERATURE
 IN THE
 EPS ROOM OR THE ENCLOSURE HOUSING THE UNIT TO THE
 MAXIMUM
 AMBIENT AIR TEMPERATURE REQUIRED BY THE EPS
 MANUFACTURER.
 7.7.1.1 CONSIDERATION SHALL BE GIVEN TO ALL THE HEAT
 EMITTED TO
 THE EPS EQUIPMENT ROOM BY THE ENERGY CONVERTER,
 UNINSULATED
 OR INSULATED EXHAUST PIPES, AND OTHER HEAT-PRODUCING
 EQUIPMENT.
 7.7.2 AIR SHALL BE SUPPLIED TO THE EPS EQUIPMENT FOR
 COMBUSTION.
 7.7.2.1* FOR EPS SUPPLYING LEVEL 1 EPSS, VENTILATION
 AIR SHALL
 BE SUPPLIED DIRECTLY FROM A SOURCE OUTSIDE THE BUILDING
 BY AN
 EXTERIOR WALL OPENING OR FROM A SOURCE OUTSIDE THE
 BUILDING BY
 A 2-HOUR FIRE-RATED AIR TRANSFER SYSTEM.
 7.7.2.2 FOR EPS SUPPLYING LEVEL 1 EPSS, DISCHARGE AIR
 SHALL BE
 DIRECTED OUTSIDE THE BUILDING BY AN EXTERIOR WALL
 OPENING OR TO
 AN EXTERIOR OPENING BY A 2-HOUR FIRE-RATED AIR TRANSFER
 SYSTEM.
 7.7.2.3 FIRE DAMPERS, SHUTTERS, OR OTHER SELF-CLOSING
 DEVICES SHALL
 NOT BE PERMITTED IN VENTILATION OPENINGS OR DUCTWORK
 FOR SUPPLY
 OR RETURN/DISCHARGE AIR TO EPS EQUIPMENT FOR LEVEL 1
 EPSS.
 7.7.3 VENTILATION AIR SUPPLY SHALL BE FROM OUTDOORS OR
 FROM A
 SOURCE OUTSIDE THE BUILDING BY AN EXTERIOR WALL OPENING
 OR
 FROM A SOURCE OUTSIDE THE BUILDING BY A 2-HOUR
 FIRE-RATED AIR
 TRANSFER SYSTEM.
 7.7.4 VENTILATION AIR SHALL BE PROVIDED TO SUPPLY AND
 DISCHARGE
 COOLING AIR FOR RADIATOR COOLING OF THE EPS WHEN
 RUNNING
 AT RATED LOAD.
 7.7.4.1 VENTILATION AIR SUPPLY AND DISCHARGE FOR
 RADIATORCOOLED
 EPS SHALL HAVE A MAXIMUM STATIC RESTRICTION OF 125 PA
 (0.5 IN. OF WATER COLUMN) IN THE DISCHARGE DUCT AT THE
 RADIATOR
 OUTLET.
 7.7.4.2 RADIATOR AIR DISCHARGE SHALL BE DUCTED OUTDOORS
 OR TO
 AN EXTERIOR OPENING BY A 2-HOUR RATED AIR TRANSFER
 SYSTEM.
 7.7.5 MOTOR-OPERATED DAMPERS, WHEN USED, SHALL BE
 SPRING
 OPERATED TO OPEN AND MOTOR CLOSED. FIRE DAMPERS,
 SHUTTERS, OR
 OTHER SELF-CLOSING DEVICES SHALL NOT BE PERMITTED IN
 VENTILATION
 OPENINGS OR DUCTWORK FOR SUPPLY OR RETURN/DISCHARGE AIR
 TO
 EPS EQUIPMENT FOR LEVEL 1 EPSS.
  
 PLEASE REVIEW AND ENSURE COMPLIANCE AND OR CORRECT AS
 APPLICABLE.
  
  
  
 3) SHEET A 2.01 - THERE IS AN OVERHEAD DOOR INDICATED
 IN A 2 HOUR FIRE WALL AT THE STORAGE GARBAGGE ROOM.
  
 THERE IS NO FIRE RATING INDICATED ON THE DOOR SCHEDULE.
  
 ADDITIONALLY, WILL THIS DOOR BE ON A FUSIBLE LINK?
  
 PLEASE REVIEW AND CORRECT AND PROVIDE DETAILS.
  
  
  
  
 4) SHEET A 2.01 - THE EXITING FROM THE GENERATOR ROOM
 INDICATES PASSAGE ALONG A 2 HOUR WALL; HOWEVER, THERE
 IS A LOUVER INDICATED AT THAT WALL AREA.
  
 THE PATH OF TRAVEL IS REQUIRED TO BE PROTECTED PER NFPA
 101, CHAPTER 8 FEATURES OF FIRE PROTECTION
  
 8.3.1.2* FIRE BARRIERS SHALL COMPLY WITH ONE OF THE
 FOLLOWING:
 (1) THE FIRE BARRIERS ARE CONTINUOUS FROM OUTSIDE WALL
 TO OUTSIDE WALL
 OR FROM ONE FIRE BARRIER TO ANOTHER, OR A COMBINATION
 THEREOF,
 INCLUDING CONTINUITY THROUGH ALL CONCEALED SPACES, SUCH
 AS THOSE
 FOUND ABOVE A CEILING, INCLUDING INTERSTITIAL SPACES.
 (2) THE FIRE BARRIERS ARE CONTINUOUS FROM OUTSIDE WALL
 TO OUTSIDE WALL
 OR FROM ONE FIRE BARRIER TO ANOTHER, AND FROM THE FLOOR
 TO THE
 BOTTOM OF THE INTERSTITIAL SPACE, PROVIDED THAT THE
 CONSTRUCTION
 ASSEMBLY FORMING THE BOTTOM OF THE INTERSTITIAL SPACE
 HAS A FIRE
 RESISTANCE RATING NOT LESS THAN THAT OF THE FIRE
 BARRIER.
 8.3.1.3 WALLS USED AS FIRE BARRIERS SHALL COMPLY WITH
 CHAPTER 7 OF
 NFPA 221, STANDARD FOR HIGH CHALLENGE FIRE WALLS, FIRE
 WALLS, AND
 FIRE BARRIER WALLS. THE NFPA 221 LIMITATION ON
 PERCENTAGE WIDTH OF
 OPENINGS SHALL NOT APPLY.
  
 PLEASE REVIEW AND CORRECT OR JUSTIFY WITH SPECIFIC CODE
 REFERENCES AND NARRATIVE.
  
  
  
 5) SHEET A 2.01 - THERE IS AN INDICATION OF A EXIT FROM
 THE GARAGE AREA PASSING BY A BOILER ROOM.
  
 28.3.2 PROTECTION FROM HAZARDS.
 28.3.2.1 GENERAL. ALL ROOMS CONTAINING HIGH-PRESSURE
 BOILERS,
 REFRIGERATING MACHINERY, TRANSFORMERS, OR OTHER SERVICE
 EQUIPMENT
 SUBJECT TO POSSIBLE EXPLOSION SHALL NOT BE LOCATED
 DIRECTLY UNDER OR
 DIRECTLY ADJACENT TO EXITS AND SHALL BE EFFECTIVELY CUT
 OFF FROM
 OTHER PARTS OF THE BUILDING AS SPECIFIED IN SECTION
 8.7.
  
 PLEASE REVIEW AND CORRECT OR JUSTIFY WITH SPECIFIC CODE
 REFERENCES AND NARRATIVE
  
  
  
 6) SHEET A 9.0 - THERE IS AN INDICATION OF A FP&L VAULT
 BOX DIRECTLY BESIDE AN EXIT FROM STAIRWAY, ST 1.
  
 28.3.2 PROTECTION FROM HAZARDS.
 28.3.2.1 GENERAL. ALL ROOMS CONTAINING HIGH-PRESSURE
 BOILERS,
 REFRIGERATING MACHINERY, TRANSFORMERS, OR OTHER SERVICE
 EQUIPMENT
 SUBJECT TO POSSIBLE EXPLOSION SHALL NOT BE LOCATED
 DIRECTLY UNDER OR
 DIRECTLY ADJACENT TO EXITS AND SHALL BE EFFECTIVELY CUT
 OFF FROM
 OTHER PARTS OF THE BUILDING AS SPECIFIED IN SECTION
 8.7.
  
 PLEASE REVIEW AND CORRECT OR JUSTIFY WITH SPECIFIC CODE
 REFERENCES AND NARRATIVE
  
  
  
  
 7) SHEET A 9.0 - THERE ARE DOORS THAT APPEAR TO OPEN
 AND ENCROACH MORE THAN ONE HALF THE REQUIRED EGRESS
 WIDTH; LUGGAGE ROOM, CONFERENCE SITTING AREA CORRIDOR
 (3), THE EXIT DOOR AT ST 4,
  
 PER NFPA 101, CH 7 MEANS OF EGRESS
  
 7.2.1.4.3* DOOR LEAF ENCROACHMENT.
 7.2.1.4.3.1 DURING ITS SWING, ANY DOOR LEAF IN A MEANS
 OF EGRESS
 SHALL LEAVE NOT LESS THAN ONE-HALF OF THE REQUIRED
 WIDTH OF AN AISLE,
 A CORRIDOR, A PASSAGEWAY, OR A LANDING UNOBSTRUCTED,
 UNLESS BOTH
 OF THE FOLLOWING CONDITIONS ARE MET:
 (1) THE DOOR OPENING PROVIDES ACCESS TO A STAIR IN AN
 EXISTING
 BUILDING.
 (2) THE DOOR OPENING MEETS THE REQUIREMENT OF
 7.2.1.4.3.2.
  
  
  
  
 8) SHEET A 2.01 & A 2.03 - THERE APPEARS TO BE STOVE
 TOPS INDICATED WITH THE KITCHENETTE AND BREAK ROOM.
  
 ANY KITCHEN EQUIPMENT WITHIN THESE ROOMS SHALL BE
 PROTECTED PER NFPA 101 & 96 WITH ALL APPLICABLE HOODS
 AND SUPPRESSION SYSTEMS UNDER SEPARATE SHOP DRAWINGS.
  
 PER NFPA 1 CH 50 & 101 CH 9:
  
 50.1.1 THE DESIGN, INSTALLATION, OPERATION, INSPECTION
 AND MAINTENANCE OF ALL PUBLIC AND PRIVATE COMMERCIAL
 COOKING
 EQUIPMENT SHALL COMPLY WITH THIS CHAPTER AND NFPA 96,
 STANDARD
 FOR VENTILATION CONTROL AND FIRE PROTECTION OF
 COMMERCIAL COOKING OPERATIONS.
  
 50.1.2 THIS CHAPTER SHALL APPLY TO RESIDENTIAL COOKING
 EQUIPMENT
 USED FOR COMMERCIAL COOKING OPERATIONS. [96:1.1.2]
  
 50.2 GENERAL REQUIREMENTS.
 50.2.1 GENERAL.
 50.2.1.1 COOKING EQUIPMENT USED IN PROCESSES PRODUCING
 SMOKE
 OR GREASE-LADEN VAPORS SHALL BE EQUIPPED WITH AN
 EXHAUST SYSTEM
 THAT COMPLIES WITH ALL THE EQUIPMENT AND PERFORMANCE
 REQUIREMENTS OF THIS CHAPTER. [96:4.1.1]
  
 9.2.3 COMMERCIAL COOKING OPERATIONS. WHERE REQUIRED BY
 ANOTHER
 SECTION OF THIS CODE, COMMERCIAL COOKING OPERATIONS
 SHALL BE PROTECTED
 IN ACCORDANCE WITH NFPA 96, STANDARD FOR VENTILATION
 CONTROL AND
 FIRE PROTECTION OF COMMERCIAL COOKING OPERATIONS,
 UNLESS SUCH
 INSTALLATIONS ARE APPROVED EXISTING INSTALLATIONS,
 WHICH SHALL BE
 PERMITTED TO BE CONTINUED IN SERVICE.
  
 PLEASE REVIEW AND CORRECT AND PROVIDE AN APPLICABLE
 NOTE OF ACKNOWLEDGEMENT.
  
  
  
 9) SHEET A 2.01 - THERE ARE ELEVATORS INDICATED.
  
 PER NFPA 101 CH 28 -
  
 28.5.3 ELEVATORS, ESCALATORS, AND CONVEYORS.
 28.5.3.1 ELEVATORS, ESCALATORS, AND CONVEYORS SHALL
 COMPLY WITH
 THE PROVISIONS OF SECTION 9.4.
 28.5.3.2* IN HIGH-RISE BUILDINGS, ONE ELEVATOR SHALL BE
 PROVIDED
 WITH A PROTECTED POWER SUPPLY AND SHALL BE AVAILABLE
 FOR USE BY
 THE FIRE DEPARTMENT IN CASE OF EMERGENCY.
  
  
 WHICH OF THE ELEVATORS MEET THE REQUIREMENTS?
  
  
  
  
 10) SHEET 2.01 - THERE ARE ELEVATORS INDICATED.
  
 PER THE STATE OF FLORIDA CHAPTER 399 FLORIDA STATUTES.
 SECTION 399.15, SECTION 17:
 REGIONAL EMERGENCY ELEVATOR ACCESS ?
 (1) IN ORDER TO PROVIDE EMERGENCY ACCESS TO ELEVATORS:
 (A) FOR EACH BUILDING IN THIS STATE WHICH IS SIX OR
 MORE STORIES IN HEIGHT, INCLUDING, BUT NOT LIMITED TO,
 HOTELS AND CONDOMINIUMS,
 ON WHICH A BUILDING PERMIT IS ISSUED AFTER SEPTEMBER
 30, 2006, ALL OF THE KEYS FOR ELEVATORS THAT ALLOW
 PUBLIC ACCESS, INCLUDING,
 BUT NOT LIMITED TO, SERVICE AND FREIGHT ELEVATORS, MUST
 BE KEYED SO AS TO ALLOW ALL ELEVATORS WITHIN EACH OF
 THE SEVEN STATE
 EMERGENCY RESPONSE REGIONS TO OPERATE IN FIRE EMERGENCY
 SITUATIONS WITH ONE MASTER ELEVATOR KEY.
  
 PLEASE REVIEW AND ENSURE COMPLIANCE AND PROVIDE AN
 APPLICABLE NOTE OF ACKNOWLEDGEMENT
  
  
  
  
  
 11) SHEET FP 1.00 - THERE ARE INDICATIONS OF SIDEWALL
 SPRINKLER HEADS AT THE BOTTOM OF HOISTWAYS.
  
 PER NFPA 13
  
 8.15.5 ELEVATOR HOISTWAYS AND MACHINE ROOMS.
  
 8.15.5.2 THE SPRINKLER REQUIRED AT THE BOTTOM OF THE
 ELEVATOR
 HOISTWAY BY 8.15.5.1 SHALL NOT BE REQUIRED FOR
 ENCLOSED, NONCOMBUSTIBLE
 ELEVATOR SHAFTS THAT DO NOT CONTAIN COMBUSTIBLE
 HYDRAULIC FLUIDS.
  
 PLEASE REVIEW AND CORRECT AND IF APPLICABLE THE
 SPRINKLER HEAD MAY BE REMOVED.
  
  
  
 12) SHEET FP 1.00 - THERE DOES NOT APPEAR TO BE A
 SPRINKLER HEAD IN THE SERVICE SINK ROOM.
  
 PER NFPA 101 TOTAL FIRE SPRINKLER COVERAGE IS REQUIRED.
  
 28.3.5 EXTINGUISHMENT REQUIREMENTS.
 28.3.5.1 ALL BUILDINGS SHALL BE PROTECTED THROUGHOUT BY
 AN
 APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN
 ACCORDANCE
 WITH 28.3.5.3.
  
 PLEASE REVIEW AND CORRECT.
  
  
  
  
 13) SHEET FP 2.00 - THERE DOES NOT APPEAR TO BE A
 SPRINKLER HEAD IN THE SERVICE SINK ROOM.
  
 PER NFPA 101 TOTAL FIRE SPRINKLER COVERAGE IS REQUIRED.
  
 28.3.5 EXTINGUISHMENT REQUIREMENTS.
 28.3.5.1 ALL BUILDINGS SHALL BE PROTECTED THROUGHOUT BY
 AN
 APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN
 ACCORDANCE
 WITH 28.3.5.3.
  
 PLEASE REVIEW AND CORRECT.
  
  
  
  
 14) SHEET FP 3.00 - THERE DOES NOT APPEAR TO BE A
 SPRINKLER HEAD IN THE SERVICE SINK ROOM.
  
 PER NFPA 101 TOTAL FIRE SPRINKLER COVERAGE IS REQUIRED.
  
 28.3.5 EXTINGUISHMENT REQUIREMENTS.
 28.3.5.1 ALL BUILDINGS SHALL BE PROTECTED THROUGHOUT BY
 AN
 APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN
 ACCORDANCE
 WITH 28.3.5.3.
  
 PLEASE REVIEW AND CORRECT.
  
  
  
 15) SHEET FP 4.00 - THERE IS A SPRINKLER HEAD NEAR ST 2
 IN THE CORRIDOR AT THE CORRIDOR DOOR THAT APPEARS TO BE
 WITHIN THE WALL.
  
 ADDITIONALLY, THIS SHEET MAY BE INCORRECTLY LABLED AND
 NEED CORRECTION, SE BELOW.
  
 PLEASE REVIEW AND CORRECT THE LOCATION.
  
  
  
  
 16) SHEET FP 5.00 - THIS SHEET IS INDICATED AS 4TH THRU
 6TH FLOORS; HOWEVER, IT SHOWS THE ROOF.
  
 PLEASE REVIEW AND CORRECT.
  
  
  
  
 17) SHEET FP 4.00 - THERE IS AN INDICATION OF A
 SPRINKLER HEAD AT THE TOP OF THE ELEVATOR HOISTWAYS.
  
 PER NFPA 13
  
 8.15.5.5* UPRIGHT, PENDENT, OR SIDEWALL SPRAY
 SPRINKLERS SHALL
 BE INSTALLED AT THE TOP OF ELEVATOR HOISTWAYS.
 8.15.5.6 THE SPRINKLER REQUIRED AT THE TOP OF THE
 ELEVATOR HOISTWAY
 BY 8.15.5.5 SHALL NOT BE REQUIRED WHERE THE HOISTWAY
 FOR PASSENGER
 ELEVATORS IS NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE AND
 THE CAR ENCLOSURE MATERIALS MEET THE REQUIREMENTS OF
 ASME
 A17.1, SAFETY CODE FOR ELEVATORS AND ESCALATORS.
  
 PLEASE REVIEW AND REMOVE IF APPLICABLE.
  
  
  
 18) SHEET FP 1.00 - THERE IS A INDICATION AT NOTE 1
 THAT A SPRINKLER HEAD AT BENEATH OF STAIRWAY.
  
 PER NFPA 13
  
 8.15.3.2.3.1 SPRINKLERS SHALL BE PERMITTED TO BE
 OMITTED FROM
 THE BOTTOM OF THE STAIRWELL WHEN THE SPACE UNDER THE
 STAIRS AT
 THE BOTTOM IS BLOCKED OFF SO THAT STORAGE CANNOT OCCUR.
  
 PLEASE REVIEW AND CORRECT IF APPLICABLE AND PROVIDE FOR
 BLOCKING AREA.
  
  
  
 19) SHEET FP 9.00 - THERE ARE INDICATIONS OF FIRE LINE
 UNDERGROUND.
  
 ALL FIRE LINE UNDERGROUND SHALL BE INSTALLED, TESTED
 AND INSPECTED UNDER SEPARATE SHOP DRAWINGS AND PERMIT.
  
 FIRE LINE UNDERGROUND SHALL BE INSTALLED, TESTED AND
 INSPECTED PER NFPA 24,
  
 PLEASE REVIEW AND PROVIDE AN APPLICABLE NOTE OF
 ACKNOWLEDGEMENT.
  
  
  
  
 20) THERE DOES NOT APPEAR TO BE ANY CLEAR INFORMATION
 INDICATED FOR SMOKE CONTROL.
  
 PLEASE PROVIDE A DETAILED RATIONAL ANALYSIS INCL;UDING
 SEQUENCE OF OPERATION REGARDING SMOKE CONTROL FOR THIS
 PROJECT.
  
  
  
  
 21) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
  
 22) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2020-01-08 Cont ID  
Sent By shill Date 2020-01-08 Time 17:03 Rev Time 0.00
Received By shill Date 2020-01-08 Time 17:03 Sent To  
Notes
2020-01-08 17:03:31GAS 2ND REVIEW**DENIED*17121018*NO RESPONSE WAS
 PROVIDED IN REGARD TO THE GAS COMMENTS. A GAS PLAN HAS
 NOT BEEN INCLUDED IN THIS SUBMITTAL PACKAGE. A GAS PLAN
 REVIEW HAS NOT BEEN PERFORMED AT THIS TIME. A SEPARATE
 GAS PERMIT IS REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS THAT REFLECT THE
 ENTIRE SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC
 SEC.107.2.1.
  
 1) GAS WATER HEATER IS LISTED AS 700K BTU BUT NOTE ON
 SHT. P11 SAYS NO GAS SYSTEMS FOR THIS PROJECT. PLEASE
 CLARIFY. WPB AMEND TO FBC 107.2.1
 2) IS THE GENERATOR, LINEN DRYER, OR ANY KITCHEN
 EQUIPMENT GAS. FBC 107.3.5
  
  
  
 TIM HUNT
 PLUMBING PLAN REVIEW
 CITY OF WEST PALM BEACH (CGA SOLUTIONS)
 561-248-2703
 [email protected]
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2019-03-25 Cont ID  
Sent By thunt Date 2019-03-25 Time 15:01 Rev Time 0.00
Received By thunt Date 2019-03-25 Time 15:01 Sent To  
Notes
2019-03-25 15:01:05GAS 1ST REVIEW**DENIED**
  
 A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BEIS
 REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK.
 PROVIDE COMPLETE PLANS AND GAS RISER THAT REFLECTS THE
 ENTIRE SCOPE OF GAS WORK TO BE DONE. AT THIS TIME. WPB
 AMEND. TO FBC SEC. 107.2.1.
  
 1) WATER HEATER ARE LISTED AS 700,000 BTU GAS BUT NOTE
 ON SHT. -P11 SAYS NO GAS SYSTEM ON THIS PROJECT. PEASE
 CLEARIFY
  
 2) IS THE GENERATOR, LINEN DRYER, OR ANY KITCHEN
 EQUIPMENT GAS? FBC 107.3.5
  
  
  
 PLEASE EMAIL ME AND REQUEST A COMPLETE GAS CHECK LIST
 OF WHAT IS REQUIRED TO SUBMIT A GAS PLAN.
  
  
 TIM HUNT
 PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR
 CITY OF WEST PALM BEACH
 561-248-2703
 [email protected]
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2020-01-16 Cont ID  
Sent By rmcdouga Date 2020-01-16 Time 11:14 Rev Time 0.00
Received By rmcdouga Date 2019-12-11 Time 16:21 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-04-19 Cont ID  
Sent By rmcdouga Date 2019-04-19 Time 18:21 Rev Time 0.00
Received By rmcdouga Date 2019-02-08 Time 11:43 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2019-04-03 Cont ID  
Sent By rmcdouga Date 2019-04-03 Time 17:59 Rev Time 0.00
Received By rmcdouga Date 2019-03-27 Time 08:38 Sent To  
Notes
2019-04-03 17:59:21PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF UPON
 APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE RECEIPT TO
 YOUR PROJECT OR EMAIL IT TO [email protected] .

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2020-01-07 Cont ID  
Sent By ccole Date 2020-01-07 Time 11:15 Rev Time 0.00
Received By ccole Date 2020-01-07 Time 07:58 Sent To  
Notes
2020-01-07 11:43:432ND REVIEW FBC-2014 MECHANICAL
 PERMIT #17121018
 410 N. ROSEMARY
 1/7/2020
  
 CODES IN EFFECT:
 FBC B- FLORIDA BUILDING CODE FIFTH EDITION 2014
 FBC M- FLORIDA MECHANICAL CODE FIFTH EDITION 2014
 FBC EC- FLORIDA ENERGY CONSERVATION CODE FIFTH EDITION
 2014
 FBC FG- FLORIDA FUEL GAS CODE FIFTH EDITION 2014
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2014
  
 PLAN REVIEW RESULTS: DENIED.
  
 THE 1ST REVIEW COMMENTS PRINTED BELOW WERE NOT
 ADDRESSED BY THE MECHANICAL ENGINEER OF RECORD AND NO
 CORRECTIONS OR REVISONS WERE MADE TO THE MECHANICAL
 PLANS. THE ARCHITECT OF RECORD HAS RESPONDED TO COMMENT
 #17- ITEMS A, B, F BUT NO CHANGES MADE TO THE
 MECHANICAL PLANS.
 PLEASE NOTE THESE NEW COMMENTS 1-3.
  
 1) M.100: EXHAUST VENTILATION IS REQUIRED FOR THE
 LOADING/MANEUVERING ZONES IN ACCORDANCE WITH TABLE
 403.3.1 AND SECTION 404.1 FBC M. THESE AREAS DO NOT
 MEET THE CRITERIA OF OPEN PARKING GARAGES AS OUTLINED
 IN SECTION 406.5 FBC B, AND ARE DESIGNED MORE LIKE
 ENCLOSED GARAGES WITH AN OPENING ON ONE SIDE.
 2) M.800: PROVIDE A DUCT SMOKE DETECTOR SYMBOL (DS) IN
 THE SUPPLY DUCTS OF THE RTU'S- SECTION 606.2.1 FBC M.
 3) M.10.00: VERIFY THE RTU'S ARE IN COMPLIANCE WITH
 SECTION C403.4.6 FBC EC.
 C403.4.6 HOT GAS BYPASS LIMITATION. COOLING SYSTEMS
 SHALL NOT USE HOT GAS BYPASS OR OTHER EVAPORATOR
 PRESSURE CONTROL SYSTEMS UNLESS THE SYSTEM IS DESIGNED
 WITH MULTIPLE STEPS OF UNLOADING OR CONTINUOUS CAPACITY
 MODULATION. THE CAPACITY OF THE HOT GAS BYPASS SHALL BE
 LIMITED AS INDICATED IN TABLE C403.4.6, AS LIMITED BY
 SECTION C403.3.1.
 TABLE C403.4.6
 MAXIMUM HOT GAS BYPASS CAPACITY
 RATED CAPACITY MAXIMUM HOT GAS BYPASS CAPACITY (% OF
 TOTAL CAPACITY)
 ? 240,000 BTU/H 50
 > 240,000 BTU/H 25
  
  
 1ST REVIEW FBC-2014 MECHANICAL
 PERMIT #17121018
 410 N. ROSEMARY
 3/27/2019
  
 CODES IN EFFECT:
 FBC B- FLORIDA BUILDING CODE FIFTH EDITION 2014
 FBC M- FLORIDA MECHANICAL CODE FIFTH EDITION 2014
 FBC EC- FLORIDA ENERGY CONSERVATION CODE FIFTH EDITION
 2014
 FBC FG- FLORIDA FUEL GAS CODE FIFTH EDITION 2014
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2014
  
 PLAN REVIEW RESULTS: DENIED.
  
 THE MECHANICAL PLANS HAVE FAILED FOR THE DEFICIENCIES
 AND OMISSIONS LISTED NUMERICALLY BELOW. PLEASE REVIEW
 ALL COMMENTS, INCLUDING THOSE LISTED FOR ADVISORY
 PURPOSES, AND RESUBMIT CORRECTED PLANS AND REQUIRED
 DOCUMENTS. WHEN RESUBMITTING, PLEASE PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
 PRIOR TO MECHANICAL PERMIT ISSUANCE, THE GENERAL
 CONTRACTOR AND MECHANICAL SUB-CONTRACTOR FOR THE
 PROJECT ARE REQUESTED TO ATTEND A MEETING AT THE WPB
 BUILDING DEPARTMENT WITH THE STAFF- CHIEF MECHANICAL
 INSPECTOR, PLANS EXAMINER, AND OTHERS- TO DISCUSS
 TIMELINES AND GUIDELINES FOR INSPECTIONS AND THE
 DOCUMENT SUBMITTAL PROCESS . FURTHER INFORMATION WILL
 FOLLOW ONCE ALL PLANS ARE APPROVED.
  
 1) SUBMIT AC COOLING AND HEATING CALCULATIONS- SECTION
 C403.2.1 FBC EC: DESIGN LOADS ASSOCIATED WITH HEATING,
 VENTILATING AND AIR CONDITIONING OF THE BUILDING SHALL
 BE DETERMINED IN ACCORDANCE WITH ANSI/ASHRAE/ACCA
 STANDARD 183 OR ACCA MANUAL N OR BY AN APPROVED
 EQUIVALENT COMPUTATIONAL PROCEDURE USING THE DESIGN
 PARAMETERS SPECIFIED IN CHAPTER 3. HEATING AND COOLING
 LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD REDUCTIONS
 THAT ARE ACHIEVED WHERE ENERGY RECOVERY SYSTEMS ARE
 UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE WITH THE
 ASHRAE HVAC SYSTEMS AND EQUIPMENT HAND-BOOK BY AN
 APPROVED EQUIVALENT COMPUTATIONAL PROCEDURE. DESIGN
 LOADS SHALL BE ATTACHED TO THE CODE COMPLIANCE FORM
 SUBMITTED TO THE BUILDING DEPARTMENT WHEN THE BUILDING
 IS PERMITTED OR, IN THE EVENT THE MECHANICAL PERMIT IS
 OBTAINED AT A LATER TIME, THE SIZING CALCULATION SHALL
 BE SUBMITTED WITH THE APPLICATION FOR THE MECHANICAL
 PERMIT.
  
 2) SUBMIT AN ENERGY COMPLIANCE REPORT - SECTION C401.2
 FBC EC. COMMERCIAL BUILDINGS SHALL COMPLY WITH ONE OF
 THE FOLLOWING:
 1. THE REQUIREMENTS OF ANSI/ASHRAE/IESNA 90.1,
 EXCLUDING SECTION 9.4.1.1(G) OF THE STANDARD.
 2. THE REQUIREMENTS OF SECTIONS C402 THROUGH C405. IN
 ADDITION, COMMERCIAL BUILDINGS SHALL COMPLY WITH
 SECTION C406 AND TENANT SPACES SHALL COMPLY WITH
 SECTION C406.1.1.
 3. THE REQUIREMENTS OF SECTIONS C402.5, C403.2, C404,
 C405.2, C405.3, C405.5, C405.6 AND C407. THE BUILDING
 ENERGY COST SHALL BE EQUAL TO OR LESS THAN 85 PERCENT
 OF THE STANDARD REFERENCE DESIGN BUILDING.
 PLEASE REVIEW SECTION C101.5.1 FBC EC: THE FLORIDA
 BUILDING COMMISSION SHALL APPROVE SPECIFIC COMPUTER
 SOFTWARE. THE CODE OFFICIAL SHALL BE PERMITTED TO
 APPROVE WORKSHEETS, COMPLIANCE MANUALS AND OTHER
 SIMILAR MATERIALS THAT MEET THE INTENT OF THIS CODE.
  
 3) COMMISSIONING OF THE MECHANICAL AND SERVICE WATER
 HEATING SYSTEMS IS REQUIRED PER SECTION 508.2 FBC EC.
 PLEASE SUBMIT A COMMISSIONING PLAN PER SECTION
 C408.2.1:
 A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED
 DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL
 ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE
 FOLLOWING ITEMS:
 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL
 BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING,
 INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF
 THE ACTIVITIES.
 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR
 SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO
 BE PERFORMED.
 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED
 TO, CALIBRATIONS AND ECONOMIZER CONTROLS.
 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED.
 TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN
 CONDITIONS AND FULL OUTSIDE AIR CONDITIONS.
 5. MEASURABLE CRITERIA FOR PERFORMANCE'
 REFER TO SECTIONS C408.2.4, C408.2.5, AND C408.2.5.4
 FOR PRELIMINARY AND FINAL REPORT REQUIREMENTS AND
 SUBMITTALS. PLEASE NOTE THAT A FINAL REPORT SHALL BE
 SUBMITTED TO THE BUILDING?S OWNERSHIP AND A COPY OF
 THAT REPORT SHALL BE SUBMITTED TO THE BUILDING OFFICIAL
 FOR FINAL MECHANICAL INSPECTION APPROVAL AND CO OF THE
 BUILDING.
  
 4) DEFERRED SUBMITTALS: FOR THE PURPOSES OF THIS
 SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE
 PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE
 TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO
 THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD.
 DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR
 APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING.
 PLEASE REVIEW THE FOLLOWING LIST AND PROVIDE A LIST ON
 THE PLANS OR UPLOAD THE LIST IN DOCUMENT FORM.
  
 REQUIRED SUBMITTALS LISTED BELOW SHALL HAVE SHOP
 DRAWING STAMPS BY THE EOR AND BE IN THE FIELD AT TIME
 OF INSPECTION.
 A) FIRE DAMPERS AND FIRE/SMOKE DAMPERS.
 B) MOTORIZED AND BAROMETRIC DAMPERS
 C) DUCT SMOKE DETECTORS
 D) EXHAUST FANS
 E) LOUVERS FOR EXHAUST AND OUTSIDE AIR INTAKES
 INCLUDING MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT
 APPROVALS AND/OR MIAMI-DADE NOA'S
 F) AC STAND NOA?S OR FL. PRODUCT APPROVALS
 G) DUCT FIRE WRAPPING
 H) CLOTHES DRYERS INCLUDING THE VENTLESS DRYERS IN THE
 SUITES S.
 I) COOKING APPLIANCES AND EXHAUST HOODS IN THE COMMON
 AREAS AND THE SUITES. (RESTAURANT KITCHEN UNDER
 SEPARATE PERMIT, NOT INCLUDED).JI) BATHROOM AND LAUNDRY
 EXHAUST TERMINATION CAPS
 SUBMITTALS TO BE PROVIDED TO THE BUILDING DEPARTMENT
 FOR REVIEW.
 A) SIGNED AND SEALED STRUCTURAL ENGINEERING FOR
 INSTALLATION OF ALL EXTERIOR MECHANICAL EQUIPMENT AND
 APPLIANCES. ALTERNATELY, SIGNED AND SEALED, OR
 DELEGATED ENGINEERING MAY BE AVAILABLE ONSITE AT THE
 TIME OF INSPECTION. PLEASE NOTE THAT DELEGATED
 ENGINEERING SHALL BEAR THE SHOP DRAWING STAMP OF THE
 STRUCTURAL ENGINEER RECORD.
 B) GENERATORS AND FUEL TANKS AND ALL ASSOCIATED
 EQUIPMENT, VENT FLUES, AND FUEL OIL PIPING.
 C) BOILERS AND WATER HEATERS INCLUDING COMBUSTION AIR
 DUCTS AND VENT FLUES.
 D) COMMISSIONING REPORTS
  
 5) ADVISORY: SEPARATE PERMITS ARE REQUIRED FOR KITCHEN
 EXHAUST HOODS, FIRE SUPPRESSION SYSTEMS, AND WALK-IN
 COOLERS AND FREEZERS.
 REGARDING THE KITCHEN EXHAUST, THE FOLLOWING CODE
 SECTIONS MAY IMPACT THE HVAC DESIGN FOR THE MAIN
 BUILDING.
 A) SECTION 508.1.2 FBC M AIR BALANCE: DESIGN PLANS FOR
 A FACILITY WITH A COMMERCIAL KITCHEN VENTILATION SYSTEM
 SHALL INCLUDE A SCHEDULE OR DIAGRAM INDICATING THE
 DESIGN OUTDOOR AIR BALANCE. THE DESIGN OUTDOOR AIR
 BALANCE SHALL INDICATE ALL EXHAUST AND REPLACEMENT AIR
 FOR THE FACILITY, PLUS THE NET EXFILTRATION IF
 APPLICABLE. THE TOTAL REPLACEMENT AIR AIRFLOW RATE
 SHALL EQUAL THE TOTAL EXHAUST AIRFLOW RATE PLUS THE NET
 EXFILTRATION. B) SECTION 508.1.1 MAKEUP AIR
 TEMPERATURE: THE TEMPERATURE DIFFERENTIAL BETWEEN
 MAKEUP AIR AND THE AIR IN THE CONDITIONED SPACE SHALL
 NOT EXCEED 10 DEGREES F (6 DEGREES C) EXCEPT WHERE THE
 ADDED HEATING AND COOLING LOADS OF THE MAKEUP AIR DO
 NOT EXCEED THE CAPACITY OF THE HVAC SYSTEM.
 C) SECTION 506.3.13: EXHAUST TERMINATION LOCATIONS AND
 CLEARANCE REQUIREMENTS ETC.
  
 6) M1.00 & A1.04: THE O/A INTAKE FOR AHU-1 & 2 SHALL BE
 A MINIMUM 10' FROM THE PROPERTY LINE- SECTION 401.4 (1)
 FBC M. THE LOCATION IS NOT IN COMPLIANCE.
  
 7) M1.00 & A.900: FIRE DAMPERS SHALL BE INSTALLED IN
 THE LOUVERED DOOR OPENINGS AT THE STORAGE, PUMP, FIRE
 PUMP, AND BOILER ROOMS- SECTION 607.5.2 FBC M.
  
 8) M1.00 & A.900: FIRE DAMPERS MISSING FOR DUCTS
 PENETRATING THE FIRE-RATED WALLS AT THE LUGGAGE, FCC,
 AND MAIN MECHANICAL ROOM WALLS- SECTION 607.5.2 FBC M.
  
 9) M1.00 & A.900: FIRE DAMPERS MISSING FOR DUCTS
 PENETRATING THE FIRE-RATED WALLS AT THE CONFERENCE
 ROOM- SECTION 607.5.2 FBC M. A) PLEASE INCLUDE THE FR
 DIFFUSERS IN THE SCHEDULE ON SHEET M10.00.
  
 10) M1.00 & A.900: FIRE DAMPER MISSING FOR THE 20X14
 DUCT PENETRATING THE FIRE-RATED BAR ROOM WALL- SECTION
 607.5.2 FBC M.
  
 11) M1.00: CU-1 AND CU-2 ARE OUTDOOR CONDENSING UNITS
 WHICH MUST BE INSTALLED IN ACCORDANCE WITH THEIR
 LISTING AND LABELING- SECTION 304.1 FBC M.
  
 12) M1.00: DUCT SMOKE DETECTORS ARE REQUIRED IN THE
 RETURN AIR SYSTEMS OF AHU-1 & 2- SEE SECTION 606.2.1
 FBC M.
  
 13) M1.00: PLEASE PROVIDE AN EQUIPMENT SCHEDULE AND
 LAYOUT PLAN FOR THE KITCHENETTE- SEE SECTION 917 FBC M
 COOKING APPLIANCES.
  
 14) M.100: EXHAUST VENTILATION IS REQUIRED FOR THE
 KITCHENETTE AT A RATE OF 25 CFMS CONTINUOUS OR 100 CFMS
 INTERMITTENT. CLARIFY IF AN EXHAUST HOOD WILL BE
 INSTALLED- SEE SECTION 506 FBC M.
  
 15) M1.00, BOILER: A) A FULL REVIEW OF THE BOILER AND
 ROOM CANNOT BE PERFORMED WITHOUT MORE INFORMATION ABOUT
 THE BOILER INCLUDING AN EQUIPMENT SCHEDULE AND TYPE OF
 POWER- GAS OR ELECTRIC. PLEASE NOTE THAT GAS FIRED
 BOILERS REQUIRE GAS PIPING PLANS, AND COMBUSTION AIR
 AND VENTING PLANS AND CALCULATIONS- SECTIONS 304, 402
 AND 503 FBC FG.
  
 16) M1.00: PROVIDE A CONDENSATE DISPOSAL PLAN FOR THE
 AIR HANDLERS- SECTION 307.2.1 FBC M.
  
 17) M1.00 & M1.0A- EMERGENCY GENERATOR:
 A) THE RADIATOR EXHAUST SHALL DISCHARGE DIRECTLY OR BE
 DUCTED TO THE OUTDOORS- SECTION 7.7.4.2 NFPA-110-2016.
 B) THE ENGINE EXHAUST PIPE SHALL DISCHARGE OUTSIDE OF
 THE STRUCTURE PER SECTIONS 8.2.3.1 NFPA 37-2015, AND
 SECTION 501.3 FBC M.
 C) EF-3 SHALL DISCHARGE TO THE OUTDOORS- SECTION 501.3
 FBC M. A) INDICATE HOW THE FAN WAS SIZED- PROVIDE AN
 EXHAUST VENTILATION CALCULATION.
 D) EF-3 SHALL RUN CONTINUOUSLY AND NOT BE CONTROLLED BY
 THE THERMOSTAT- SECTIONS 4.1.2.1.3 & 6.3.6.5.1 NFPA 37,
 AND SECTION 502.4.2 FBC M.
 E) REFER TO SECTION 7.7.1 NFPA 110- 2016 AND VERIFY
 THAT THE VENTILATION AIRFLOW IN THE GENERATOR/TANK
 (EPS) ROOM IS DESIGNED TO LIMIT THE MAXIMUM AIR
 TEMPERATURE IN THE ROOM TO THE MAXIMUM AMBIENT AIR
 TEMPERATURE REQUIRED BY THE GENERATOR MANUFACTURER.
 CONSIDERATION SHALL BE GIVEN TO ALL THE HEAT EMITTED TO
 THE ROOM BY THE ENERGY CONVERTER, EXHAUST PIPES, AND
 ALL OTHER HEAT PRODUCING EQUIPMENT- SECTION 7.7.1.1.
 DESIGN OF THE HEATING, COOLING, AND VENTILATION SYSTEM
 SHALL AMONG OTHER THINGS, INCLUDE PROVISIONS FOR
 FACTORS SUCH AS HEAT, COLD, HUMIDITY, LOUVERS, ETC.-
 SECTION 7.7.7.
 F) THE LOUVERED AIR INTAKE OPENING INTO THE PARKING
 GARAGE IS PROHIBITED PER SECTION 7.7.3 NFPA 110 WHICH
 REQUIRES VENTILATION AIR TO BE TAKEN FROM THE OUTDOORS.
 IN ADDITION PLEASE NOT THAT A FIRE DAMPER WOULD BE
 REQUIRED IN THE LOUVERED OPENING, HOWEVER DAMPERS ARE
 NOT PERMITTED IN VENTILATION OPENINGS INTO THE ROOM-
 SECTION 7.7.2.3 NFPA 110.
 G) VERIFY THAT THE GENERATOR IS CLASSIFIED AS A LEVEL 1
 PER SECTION 4.4 NFPA 110, AND PROVIDE THE UL 2200
 CERTIFICATE OF COMPLIANCE- SECTION 915.1 FBC M.
 H) PLEASE PROVIDE A CLEARER COPY OF THE FUEL TANK
 DIAGRAM AND SPECIFICATIONS- SECTION 107.2.1 WPB.
  
 18) M2.00: THE O/A INTAKES FOR AHU-6 & 7, AND THE
 LAUNDRY ROOM MAKEUP AIR SHALL BE A MINIMUM 10' FROM THE
 PROPERTY LINE- SECTION 401.4 (1) FBC M. THE LOCATIONS
 ARE NOT IN COMPLIANCE.
  
 19) M2.00: THE EXHAUST OUTLET FOR THE POOL EXHAUST
 SYSTEM SHALL BE A MINIMUM 10' FROM THE PROPERTY LINE-
 SECTION 501.3.1 (2) FBC M. THE LOCATION IS NOT IN
 COMPLIANCE.
  
 20) M2.00: VERIFY THE BOTTOM OF SF-1 IS A MINIMUM 8'
 ABOVE THE FINISHED GARAGE FLOOR- SECTION 394.6 FBC M.
  
 21) M2.00: FIRE DAMPER MISSING AT THE 20X20 DUCT
 PENETRATION FROM AHU-6 THROUGH THE FIRE-RATED MECH
 RM/GARAGE WALL.
  
 22) M2.00: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 DRYERS - SECTION 504.6.2
  
 23) M2.00: VERIFY THE DRYER EXHAUST FAN WILL RUN
 CONTINUOUSLY OR BE INTERLOCKED TO OPERATE WHEN ANY OF
 THE TWO UNITS ARE OPERATING. A) VERIFY THE MOTOR FOR
 THE FAN IS LOCATED OUTSIDE OF THE AIRSTREAM.
  
 24) M2.00: PROVIDE EQUIPMENT SCHEDULES AND SUBMIT
 MANUFACTURER'S SPECIFICATIONS FOR THE BREAKROOM COOKING
 APPLIANCE AND RECIRCULATING HOOD- SECTIONS 505, 506,
 AND 917.1 FBC M.
  
 25) M2.00: FIRE DAMPER SHALL BE INSTALLED IN THE
 LOUVERED DOOR OPENINGS AT THE POOL EQUIPMENT ROOM -
 SECTION 607.5.2 FBC M.
  
 26) M2.00: A VESTIBULE WILL BE REQUIRED FOR THE POOL
 EQUIPMENT ROOM IF THE ROOM CONTAINS A FUEL-FIRED POOL
 HEATER- SECTION 305.3.2 FBC FG.
  
 25) M3.00, M4.00, M6.00, M.700, M9.00, AND M10.00:
 INDICATE HOW O/A IS BEING PROVIDED TO THE HOTEL ROOMS
 AND PROVIDE CALCULATIONS- SECTION 401.2 FBC M. NOTE #5
 REFERENCES RTU-1 FOR O/A CALCULATIONS FOR THE ROOMS BUT
 NO CALCS ARE PROVIDED.
  
 26) M9.00: PLEASE INCLUDE THE CORRIDORS IN THE
 VENTILATION CALCULATIONS- TABLE 403.3.1.1. FBC M.
  
 27) M13.00: NOA #13-1017.09 IS OUTDATED. PLEASE PROVIDE
 AN UPDATED COPY. PLEASE NOTE THIS MAY BE A DEFERRED
 SUBMITTAL PER COMMENT #4.
  
 28) M13.00: CLEARANCES UNDER THE CONDENSING UNITS SHALL
 BE IN ACCORDANCE WITH TABLE 1509.6.5 FBC B. PLEASE
 PLACE A NOTE ON THE DETAIL.
  
 29) PROVIDE A COMPLETE CONDENSATE DISPOSAL PLAN FOR ALL
 THE AIR HANDLERS- SECTION 307.2.1 FBC M.
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2019-03-28 Cont ID  
Sent By ccole Date 2019-03-28 Time 08:53 Rev Time 0.00
Received By ccole Date 2019-03-27 Time 08:17 Sent To  
Notes
2019-03-28 08:54:171ST REVIEW FBC-2014 MECHANICAL
 PERMIT #17121018
 410 N. ROSEMARY
 3/27/2019
  
 CODES IN EFFECT:
 FBC B- FLORIDA BUILDING CODE FIFTH EDITION 2014
 FBC M- FLORIDA MECHANICAL CODE FIFTH EDITION 2014
 FBC EC- FLORIDA ENERGY CONSERVATION CODE FIFTH EDITION
 2014
 FBC FG- FLORIDA FUEL GAS CODE FIFTH EDITION 2014
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2014
  
 PLAN REVIEW RESULTS: DENIED.
  
 THE MECHANICAL PLANS HAVE FAILED FOR THE DEFICIENCIES
 AND OMISSIONS LISTED NUMERICALLY BELOW. PLEASE REVIEW
 ALL COMMENTS, INCLUDING THOSE LISTED FOR ADVISORY
 PURPOSES, AND RESUBMIT CORRECTED PLANS AND REQUIRED
 DOCUMENTS. WHEN RESUBMITTING, PLEASE PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
 PRIOR TO MECHANICAL PERMIT ISSUANCE, THE GENERAL
 CONTRACTOR AND MECHANICAL SUB-CONTRACTOR FOR THE
 PROJECT ARE REQUESTED TO ATTEND A MEETING AT THE WPB
 BUILDING DEPARTMENT WITH THE STAFF- CHIEF MECHANICAL
 INSPECTOR, PLANS EXAMINER, AND OTHERS- TO DISCUSS
 TIMELINES AND GUIDELINES FOR INSPECTIONS AND THE
 DOCUMENT SUBMITTAL PROCESS . FURTHER INFORMATION WILL
 FOLLOW ONCE ALL PLANS ARE APPROVED.
  
 1) SUBMIT AC COOLING AND HEATING CALCULATIONS- SECTION
 C403.2.1 FBC EC: DESIGN LOADS ASSOCIATED WITH HEATING,
 VENTILATING AND AIR CONDITIONING OF THE BUILDING SHALL
 BE DETERMINED IN ACCORDANCE WITH ANSI/ASHRAE/ACCA
 STANDARD 183 OR ACCA MANUAL N OR BY AN APPROVED
 EQUIVALENT COMPUTATIONAL PROCEDURE USING THE DESIGN
 PARAMETERS SPECIFIED IN CHAPTER 3. HEATING AND COOLING
 LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD REDUCTIONS
 THAT ARE ACHIEVED WHERE ENERGY RECOVERY SYSTEMS ARE
 UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE WITH THE
 ASHRAE HVAC SYSTEMS AND EQUIPMENT HAND-BOOK BY AN
 APPROVED EQUIVALENT COMPUTATIONAL PROCEDURE. DESIGN
 LOADS SHALL BE ATTACHED TO THE CODE COMPLIANCE FORM
 SUBMITTED TO THE BUILDING DEPARTMENT WHEN THE BUILDING
 IS PERMITTED OR, IN THE EVENT THE MECHANICAL PERMIT IS
 OBTAINED AT A LATER TIME, THE SIZING CALCULATION SHALL
 BE SUBMITTED WITH THE APPLICATION FOR THE MECHANICAL
 PERMIT.
  
 2) SUBMIT AN ENERGY COMPLIANCE REPORT - SECTION C401.2
 FBC EC. COMMERCIAL BUILDINGS SHALL COMPLY WITH ONE OF
 THE FOLLOWING:
 1. THE REQUIREMENTS OF ANSI/ASHRAE/IESNA 90.1,
 EXCLUDING SECTION 9.4.1.1(G) OF THE STANDARD.
 2. THE REQUIREMENTS OF SECTIONS C402 THROUGH C405. IN
 ADDITION, COMMERCIAL BUILDINGS SHALL COMPLY WITH
 SECTION C406 AND TENANT SPACES SHALL COMPLY WITH
 SECTION C406.1.1.
 3. THE REQUIREMENTS OF SECTIONS C402.5, C403.2, C404,
 C405.2, C405.3, C405.5, C405.6 AND C407. THE BUILDING
 ENERGY COST SHALL BE EQUAL TO OR LESS THAN 85 PERCENT
 OF THE STANDARD REFERENCE DESIGN BUILDING.
 PLEASE REVIEW SECTION C101.5.1 FBC EC: THE FLORIDA
 BUILDING COMMISSION SHALL APPROVE SPECIFIC COMPUTER
 SOFTWARE. THE CODE OFFICIAL SHALL BE PERMITTED TO
 APPROVE WORKSHEETS, COMPLIANCE MANUALS AND OTHER
 SIMILAR MATERIALS THAT MEET THE INTENT OF THIS CODE.
  
 3) COMMISSIONING OF THE MECHANICAL AND SERVICE WATER
 HEATING SYSTEMS IS REQUIRED PER SECTION 508.2 FBC EC.
 PLEASE SUBMIT A COMMISSIONING PLAN PER SECTION
 C408.2.1:
 A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED
 DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL
 ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE
 FOLLOWING ITEMS:
 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL
 BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING,
 INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF
 THE ACTIVITIES.
 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR
 SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO
 BE PERFORMED.
 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED
 TO, CALIBRATIONS AND ECONOMIZER CONTROLS.
 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED.
 TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN
 CONDITIONS AND FULL OUTSIDE AIR CONDITIONS.
 5. MEASURABLE CRITERIA FOR PERFORMANCE'
 REFER TO SECTIONS C408.2.4, C408.2.5, AND C408.2.5.4
 FOR PRELIMINARY AND FINAL REPORT REQUIREMENTS AND
 SUBMITTALS. PLEASE NOTE THAT A FINAL REPORT SHALL BE
 SUBMITTED TO THE BUILDING?S OWNERSHIP AND A COPY OF
 THAT REPORT SHALL BE SUBMITTED TO THE BUILDING OFFICIAL
 FOR FINAL MECHANICAL INSPECTION APPROVAL AND CO OF THE
 BUILDING.
  
 4) DEFERRED SUBMITTALS: FOR THE PURPOSES OF THIS
 SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE
 PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE
 TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO
 THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD.
 DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR
 APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING.
 PLEASE REVIEW THE FOLLOWING LIST AND PROVIDE A LIST ON
 THE PLANS OR UPLOAD THE LIST IN DOCUMENT FORM.
  
 REQUIRED SUBMITTALS LISTED BELOW SHALL HAVE SHOP
 DRAWING STAMPS BY THE EOR AND BE IN THE FIELD AT TIME
 OF INSPECTION.
 A) FIRE DAMPERS AND FIRE/SMOKE DAMPERS.
 B) MOTORIZED AND BAROMETRIC DAMPERS
 C) DUCT SMOKE DETECTORS
 D) EXHAUST FANS
 E) LOUVERS FOR EXHAUST AND OUTSIDE AIR INTAKES
 INCLUDING MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT
 APPROVALS AND/OR MIAMI-DADE NOA'S
 F) AC STAND NOA?S OR FL. PRODUCT APPROVALS
 G) DUCT FIRE WRAPPING
 H) CLOTHES DRYERS INCLUDING THE VENTLESS DRYERS IN THE
 SUITES S.
 I) COOKING APPLIANCES AND EXHAUST HOODS IN THE COMMON
 AREAS AND THE SUITES. (RESTAURANT KITCHEN UNDER
 SEPARATE PERMIT, NOT INCLUDED).JI) BATHROOM AND LAUNDRY
 EXHAUST TERMINATION CAPS
 SUBMITTALS TO BE PROVIDED TO THE BUILDING DEPARTMENT
 FOR REVIEW.
 A) SIGNED AND SEALED STRUCTURAL ENGINEERING FOR
 INSTALLATION OF ALL EXTERIOR MECHANICAL EQUIPMENT AND
 APPLIANCES. ALTERNATELY, SIGNED AND SEALED, OR
 DELEGATED ENGINEERING MAY BE AVAILABLE ONSITE AT THE
 TIME OF INSPECTION. PLEASE NOTE THAT DELEGATED
 ENGINEERING SHALL BEAR THE SHOP DRAWING STAMP OF THE
 STRUCTURAL ENGINEER RECORD.
 B) GENERATORS AND FUEL TANKS AND ALL ASSOCIATED
 EQUIPMENT, VENT FLUES, AND FUEL OIL PIPING.
 C) BOILERS AND WATER HEATERS INCLUDING COMBUSTION AIR
 DUCTS AND VENT FLUES.
 D) COMMISSIONING REPORTS
  
 5) ADVISORY: SEPARATE PERMITS ARE REQUIRED FOR KITCHEN
 EXHAUST HOODS, FIRE SUPPRESSION SYSTEMS, AND WALK-IN
 COOLERS AND FREEZERS.
 REGARDING THE KITCHEN EXHAUST, THE FOLLOWING CODE
 SECTIONS MAY IMPACT THE HVAC DESIGN FOR THE MAIN
 BUILDING.
 A) SECTION 508.1.2 FBC M AIR BALANCE: DESIGN PLANS FOR
 A FACILITY WITH A COMMERCIAL KITCHEN VENTILATION SYSTEM
 SHALL INCLUDE A SCHEDULE OR DIAGRAM INDICATING THE
 DESIGN OUTDOOR AIR BALANCE. THE DESIGN OUTDOOR AIR
 BALANCE SHALL INDICATE ALL EXHAUST AND REPLACEMENT AIR
 FOR THE FACILITY, PLUS THE NET EXFILTRATION IF
 APPLICABLE. THE TOTAL REPLACEMENT AIR AIRFLOW RATE
 SHALL EQUAL THE TOTAL EXHAUST AIRFLOW RATE PLUS THE NET
 EXFILTRATION. B) SECTION 508.1.1 MAKEUP AIR
 TEMPERATURE: THE TEMPERATURE DIFFERENTIAL BETWEEN
 MAKEUP AIR AND THE AIR IN THE CONDITIONED SPACE SHALL
 NOT EXCEED 10 DEGREES F (6 DEGREES C) EXCEPT WHERE THE
 ADDED HEATING AND COOLING LOADS OF THE MAKEUP AIR DO
 NOT EXCEED THE CAPACITY OF THE HVAC SYSTEM.
 C) SECTION 506.3.13: EXHAUST TERMINATION LOCATIONS AND
 CLEARANCE REQUIREMENTS ETC.
  
 6) M1.00 & A1.04: THE O/A INTAKE FOR AHU-1 & 2 SHALL BE
 A MINIMUM 10' FROM THE PROPERTY LINE- SECTION 401.4 (1)
 FBC M. THE LOCATION IS NOT IN COMPLIANCE.
  
 7) M1.00 & A.900: FIRE DAMPERS SHALL BE INSTALLED IN
 THE LOUVERED DOOR OPENINGS AT THE STORAGE, PUMP, FIRE
 PUMP, AND BOILER ROOMS- SECTION 607.5.2 FBC M.
  
 8) M1.00 & A.900: FIRE DAMPERS MISSING FOR DUCTS
 PENETRATING THE FIRE-RATED WALLS AT THE LUGGAGE, FCC,
 AND MAIN MECHANICAL ROOM WALLS- SECTION 607.5.2 FBC M.
  
 9) M1.00 & A.900: FIRE DAMPERS MISSING FOR DUCTS
 PENETRATING THE FIRE-RATED WALLS AT THE CONFERENCE
 ROOM- SECTION 607.5.2 FBC M. A) PLEASE INCLUDE THE FR
 DIFFUSERS IN THE SCHEDULE ON SHEET M10.00.
  
 10) M1.00 & A.900: FIRE DAMPER MISSING FOR THE 20X14
 DUCT PENETRATING THE FIRE-RATED BAR ROOM WALL- SECTION
 607.5.2 FBC M.
  
 11) M1.00: CU-1 AND CU-2 ARE OUTDOOR CONDENSING UNITS
 WHICH MUST BE INSTALLED IN ACCORDANCE WITH THEIR
 LISTING AND LABELING- SECTION 304.1 FBC M.
  
 12) M1.00: DUCT SMOKE DETECTORS ARE REQUIRED IN THE
 RETURN AIR SYSTEMS OF AHU-1 & 2- SEE SECTION 606.2.1
 FBC M.
  
 13) M1.00: PLEASE PROVIDE AN EQUIPMENT SCHEDULE AND
 LAYOUT PLAN FOR THE KITCHENETTE- SEE SECTION 917 FBC M
 COOKING APPLIANCES.
  
 14) M.100: EXHAUST VENTILATION IS REQUIRED FOR THE
 KITCHENETTE AT A RATE OF 25 CFMS CONTINUOUS OR 100 CFMS
 INTERMITTENT. CLARIFY IF AN EXHAUST HOOD WILL BE
 INSTALLED- SEE SECTION 506 FBC M.
  
 15) M1.00, BOILER: A) A FULL REVIEW OF THE BOILER AND
 ROOM CANNOT BE PERFORMED WITHOUT MORE INFORMATION ABOUT
 THE BOILER INCLUDING AN EQUIPMENT SCHEDULE AND TYPE OF
 POWER- GAS OR ELECTRIC. PLEASE NOTE THAT GAS FIRED
 BOILERS REQUIRE GAS PIPING PLANS, AND COMBUSTION AIR
 AND VENTING PLANS AND CALCULATIONS- SECTIONS 304, 402
 AND 503 FBC FG.
  
 16) M1.00: PROVIDE A CONDENSATE DISPOSAL PLAN FOR THE
 AIR HANDLERS- SECTION 307.2.1 FBC M.
  
 17) M1.00 & M1.0A- EMERGENCY GENERATOR:
 A) THE RADIATOR EXHAUST SHALL DISCHARGE DIRECTLY OR BE
 DUCTED TO THE OUTDOORS- SECTION 7.7.4.2 NFPA-110-2016.
 B) THE ENGINE EXHAUST PIPE SHALL DISCHARGE OUTSIDE OF
 THE STRUCTURE PER SECTIONS 8.2.3.1 NFPA 37-2015, AND
 SECTION 501.3 FBC M.
 C) EF-3 SHALL DISCHARGE TO THE OUTDOORS- SECTION 501.3
 FBC M. A) INDICATE HOW THE FAN WAS SIZED- PROVIDE AN
 EXHAUST VENTILATION CALCULATION.
 D) EF-3 SHALL RUN CONTINUOUSLY AND NOT BE CONTROLLED BY
 THE THERMOSTAT- SECTIONS 4.1.2.1.3 & 6.3.6.5.1 NFPA 37,
 AND SECTION 502.4.2 FBC M.
 E) REFER TO SECTION 7.7.1 NFPA 110- 2016 AND VERIFY
 THAT THE VENTILATION AIRFLOW IN THE GENERATOR/TANK
 (EPS) ROOM IS DESIGNED TO LIMIT THE MAXIMUM AIR
 TEMPERATURE IN THE ROOM TO THE MAXIMUM AMBIENT AIR
 TEMPERATURE REQUIRED BY THE GENERATOR MANUFACTURER.
 CONSIDERATION SHALL BE GIVEN TO ALL THE HEAT EMITTED TO
 THE ROOM BY THE ENERGY CONVERTER, EXHAUST PIPES, AND
 ALL OTHER HEAT PRODUCING EQUIPMENT- SECTION 7.7.1.1.
 DESIGN OF THE HEATING, COOLING, AND VENTILATION SYSTEM
 SHALL AMONG OTHER THINGS, INCLUDE PROVISIONS FOR
 FACTORS SUCH AS HEAT, COLD, HUMIDITY, LOUVERS, ETC.-
 SECTION 7.7.7.
 F) THE LOUVERED AIR INTAKE OPENING INTO THE PARKING
 GARAGE IS PROHIBITED PER SECTION 7.7.3 NFPA 110 WHICH
 REQUIRES VENTILATION AIR TO BE TAKEN FROM THE OUTDOORS.
 IN ADDITION PLEASE NOT THAT A FIRE DAMPER WOULD BE
 REQUIRED IN THE LOUVERED OPENING, HOWEVER DAMPERS ARE
 NOT PERMITTED IN VENTILATION OPENINGS INTO THE ROOM-
 SECTION 7.7.2.3 NFPA 110.
 G) VERIFY THAT THE GENERATOR IS CLASSIFIED AS A LEVEL 1
 PER SECTION 4.4 NFPA 110, AND PROVIDE THE UL 2200
 CERTIFICATE OF COMPLIANCE- SECTION 915.1 FBC M.
 H) PLEASE PROVIDE A CLEARER COPY OF THE FUEL TANK
 DIAGRAM AND SPECIFICATIONS- SECTION 107.2.1 WPB.
  
 18) M2.00: THE O/A INTAKES FOR AHU-6 & 7, AND THE
 LAUNDRY ROOM MAKEUP AIR SHALL BE A MINIMUM 10' FROM THE
 PROPERTY LINE- SECTION 401.4 (1) FBC M. THE LOCATIONS
 ARE NOT IN COMPLIANCE.
  
 19) M2.00: THE EXHAUST OUTLET FOR THE POOL EXHAUST
 SYSTEM SHALL BE A MINIMUM 10' FROM THE PROPERTY LINE-
 SECTION 501.3.1 (2) FBC M. THE LOCATION IS NOT IN
 COMPLIANCE.
  
 20) M2.00: VERIFY THE BOTTOM OF SF-1 IS A MINIMUM 8'
 ABOVE THE FINISHED GARAGE FLOOR- SECTION 394.6 FBC M.
  
 21) M2.00: FIRE DAMPER MISSING AT THE 20X20 DUCT
 PENETRATION FROM AHU-6 THROUGH THE FIRE-RATED MECH
 RM/GARAGE WALL.
  
 22) M2.00: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 DRYERS - SECTION 504.6.2
  
 23) M2.00: VERIFY THE DRYER EXHAUST FAN WILL RUN
 CONTINUOUSLY OR BE INTERLOCKED TO OPERATE WHEN ANY OF
 THE TWO UNITS ARE OPERATING. A) VERIFY THE MOTOR FOR
 THE FAN IS LOCATED OUTSIDE OF THE AIRSTREAM.
  
 24) M2.00: PROVIDE EQUIPMENT SCHEDULES AND SUBMIT
 MANUFACTURER'S SPECIFICATIONS FOR THE BREAKROOM COOKING
 APPLIANCE AND RECIRCULATING HOOD- SECTIONS 505, 506,
 AND 917.1 FBC M.
  
 25) M2.00: FIRE DAMPER SHALL BE INSTALLED IN THE
 LOUVERED DOOR OPENINGS AT THE POOL EQUIPMENT ROOM -
 SECTION 607.5.2 FBC M.
  
 26) M2.00: A VESTIBULE WILL BE REQUIRED FOR THE POOL
 EQUIPMENT ROOM IF THE ROOM CONTAINS A FUEL-FIRED POOL
 HEATER- SECTION 305.3.2 FBC FG.
  
 25) M3.00, M4.00, M6.00, M.700, M9.00, AND M10.00:
 INDICATE HOW O/A IS BEING PROVIDED TO THE HOTEL ROOMS
 AND PROVIDE CALCULATIONS- SECTION 401.2 FBC M. NOTE #5
 REFERENCES RTU-1 FOR O/A CALCULATIONS FOR THE ROOMS BUT
 NO CALCS ARE PROVIDED.
  
 26) M9.00: PLEASE INCLUDE THE CORRIDORS IN THE
 VENTILATION CALCULATIONS- TABLE 403.3.1.1. FBC M.
  
 27) M13.00: NOA #13-1017.09 IS OUTDATED. PLEASE PROVIDE
 AN UPDATED COPY. PLEASE NOTE THIS MAY BE A DEFERRED
 SUBMITTAL PER COMMENT #4.
  
 28) M13.00: CLEARANCES UNDER THE CONDENSING UNITS SHALL
 BE IN ACCORDANCE WITH TABLE 1509.6.5 FBC B. PLEASE
 PLACE A NOTE ON THE DETAIL.
  
 29) PROVIDE A COMPLETE CONDENSATE DISPOSAL PLAN FOR ALL
 THE AIR HANDLERS- SECTION 307.2.1 FBC M.
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2020-01-08 Cont ID  
Sent By shill Date 2020-01-08 Time 17:02 Rev Time 0.00
Received By shill Date 2020-01-08 Time 17:02 Sent To  
Notes
2020-02-27 07:10:34PLUMBING 2ND REVIEW**DENIED**17121018*8
 ONLY 7 OF THE 16 PLUMBING COMMENTS HAVE BEEN ADDRESSED
 DURING THIS 2ND PLAN SUBMITTAL. IF THESE REMAINING 9
 COMMENTS ARE NOT COMPLETELY ADDRESSED A 4X PLAN REVIEW
 FEE COULD BE ASSESSED PER FL STATE STATUTE
 553.80?ENFORCEMENT.?2(B)?WITH RESPECT TO EVALUATION OF
 DESIGN PROFESSIONALS? DOCUMENTS, IF A LOCAL GOVERNMENT
 FINDS IT NECESSARY, IN ORDER TO ENFORCE COMPLIANCE WITH
 THE FLORIDA BUILDING CODE AND ISSUE A PERMIT, TO REJECT
 DESIGN DOCUMENTS REQUIRED BY THE CODE THREE OR MORE
 TIMES FOR FAILURE TO CORRECT A CODE VIOLATION
 SPECIFICALLY AND CONTINUOUSLY NOTED IN EACH REJECTION,
 INCLUDING, BUT NOT LIMITED TO, EGRESS, FIRE PROTECTION,
 STRUCTURAL STABILITY, ENERGY, ACCESSIBILITY, LIGHTING,
 VENTILATION, ELECTRICAL, MECHANICAL, PLUMBING, AND GAS
 SYSTEMS, OR OTHER REQUIREMENTS IDENTIFIED BY RULE OF
 THE FLORIDA BUILDING COMMISSION ADOPTED PURSUANT TO
 CHAPTER 120, THE LOCAL GOVERNMENT SHALL IMPOSE, EACH
 TIME AFTER THE THIRD SUCH REVIEW THE PLANS ARE REJECTED
 FOR THAT CODE VIOLATION, A FEE OF FOUR TIMES THE AMOUNT
 OF THE PROPORTION OF THE PERMIT FEE ATTRIBUTED TO PLANS
 REVIEW.
  
 COMMENTS STILL OUTSTANDING:
 1) PROVIDE COMPLETE INSTALLATION MANUAL/ SPECS FOR THE
 GREASE INTERCEPTOR, DOMESTIC BOOSTER PUMPS, AND WATER
 HEATERS. FBC 107.2.1
 2) SHT. P1.01 WATER HEATER CALLS OUT BTU RATING AS 700K
 BTU BUT UNDER HEATER DETAIL LIST THEN AS 800K BTU WHILE
 SHT. P11 SAYS NO GAS ON THIS PROJECT. PLEASE CLARIFY
 FBC 107.2.1
 3) PROVIDE ANTI-SIPHONING BACKFLOW DEVICE FOR THE HOT
 WATER STORAGE TANKS SHOWN ON SHT. P1.01. FBC-PLB 608.2
 4) PROVIDE MEANS OF THERMO EXPANSION FOR THE HOT WATER
 SYSTEM. FBC-PLB 607.3
 5) SHT. L1-1 LIST THE BACKFLOW FOR THE IRRIGATION
 SYSTEM A WILKINS 720A PVB. THIS WILKINS DEVICE IS NOT
 LEAD FREE/ NS61 APPROVED OR RPZ. PVB?S ARE NOT
 PERMITTED ON COMMERCIAL PROPERTIES WHILE BEING CONNECT
 TO AN INDEPENDENT WATER METER. WPB CROSS CONNECTION
 MANUAL 2017
 6) PROVIDE A COMPLETE SANITARY, DOMESTIC WATER, STORM
 WATER, AND GREASE WASTE ISOMETRIC DRAWING FROM THE
 GROUND FLOOR TO THE 4TH. FBC 107.3.5
 7) PROVIDE HOW YOU SIZED THE GREASE INTERCEPTOR AND
 WHICH METHOD YOU ARE USING. FBC-PLB 1003
 8) SHT. P1.00 SHOWS THE KITCHEN DISCHARGING INTO THE
 SANITARY SEWER AND NOT THE GREASE. BEING THAT COOKING
 WILL BE DONE HERE IT MUST GO THOUGH THE GREASE
 INTERCEPTOR. FBC-PLB 1003.1
 9) PROVIDE DETAIL ON ELEVATOR SUMP PUMP IS CONNECTING
 INTO THE SANITARY SYSTEM. FBC 107.3.5
  
 NEW COMMENTS BASE ON NEW SHEETS SUBMITTED:
 10) YOU CALL OUT TO SEE OWNERS RESPONSE LETTER BUT ONE
 COULD NOT BE LOCATED IN RESPONSE #1. PLEASE PROVIDE.
 PLEASE REMOVE THE WORDING EXTENDED STAY ROOMS AS THIS
 THE TERM USED FOR STAYS OR 30 DAYS. FBC 107.2.1
 11) IN YOUR RESPONSE LETTER IT JUMPS FROM 5 TO 7 AND 6
 IS MISSING. PLEASE CLARIFY. FBC 107.2.1
 12) SHT. A 7.02 DETAIL #7 THE TOILET PAPER HOLDER PER
 FBC-ACC 604.7 MUST BE 7?-9? FROM THE FRONT LIP OF THE
 TOILET TO THE CENTER OF WHERE IT DISPENSES PAPER FROM.
 13) THE ACCESSIBLE WASHER AND DRYERS AS SHOWN I DO NOT
 FEEL COMPLY. BEING A STACKABLE UNIT IT WOULD NOT MEET
 THE REQUIRED REACH RANGES. THE PARALLEL CLEAR FLOOR
 SPACE ACCESS TO THE UNITS IS BEING BLOCKED BY THE
 CLOSET WALLS.PLEASE CLARIFY AND SHOW DETAIL SHOWING HOW
 THIS DESIGN COMPLIES. FBC-ACC 611.2, 611.4
 14) SHT A 7.02 DETAIL # 11. THE SHOWER PAN DETAIL IS
 MISSING THE REQUIRED 2% PRE-PITCH UNDER THE PAN.
 FBC-PLB 717.5.2
 15) SHT. A 7.02 DETAIL # 7 PLEASE SHOW THE GRAB BAR IS
 MOUNTED 12? FROM THE TOILET CENTERLINE TOWARDS THE WALL
 AS SHOWN IN FBC-ACC 604.5.2
 16) SHT. 7.02 DETAIL 8 THE ACCESSIBLE SHOWERS ARE SHOWN
 WITH A CURB. THE MAX ALLOWED THRESHOLD IS ??FBC-ACC
 608.7
  
 TIM HUNT
 PLUMBING PLAN REVIEW
 CITY OF WEST PALM BEACH (CGA SOLUTIONS)
 561-248-2703
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2019-03-25 Cont ID  
Sent By thunt Date 2019-03-25 Time 14:53 Rev Time 0.00
Received By thunt Date 2019-03-25 Time 09:05 Sent To  
Notes
2019-03-25 14:53:07PLUMBING 1ST REVIEW**DENIED**
  
  
 1)PLEASE PROVIDE WHICH SAFE HARBOR UNDER THE FAIR
 HOUSING ACT YOU INTENT TO USE AND SHOW ON PLANS.
 PROVIDE FLOOR PLAN SHOWING WHAT DESIGN SPEC EACH UNIT
 WILL BE. FBC 107.3.5
  
 2) SHT. A-2.13, 2.12, 3.00, AND 4.00 ARE MISSING THE
 REQUIRED CLEAR FLOOR SPACE FOR THE SHOWERS IN THE
 ACCESSIBILITY COMPLANT ROOMS. FBC 107.3.5
  
 3) SHT. A-2.13 PROVIDE CLEAR FLOOR SPACE AS REQUIRED IN
 FRONT OF THE WASHING MACHINE AND DRYER. ALSO INCLUDE
 REACH RANGES. FBC-ACC 611, 308
  
 4) SHT. A 2.14 PROVIDE MIRROR DETAIL SHOWING MAX 34" IS
 TO THE REFLECTIVE SURFACE. FBC-ACC 603.3
  
 5) SHT. A 2.14 PROVIDE DETAIL SHOWING SIDE GRAB BAR IS
 42" AND OVERALL WILL BE 54". FBC-ACC 604.5.1
  
 6) PROVIDE COMPLETE INSTALLATION MANUAL/ SPECS FOR THE
 GREASE INTERCEPTOR, DOMESTIC BOOSTER PUMPS, WATER
 HEATERS. FBC 107.2.1
  
 7) PROVIDE SHOWER PAN DETAIL. IF USING ANY OTHER
 PRODUCT THEN VINYL PAN LINER PROVIDE INSTALLATION
 MANUAL AND PRODUCT APPROVAL SHEETS. FBC 107.2.1
  
 8) SHT. A 7.02 DETAIL #8 SHOW THE HAND HELD SHOWER
 ABOVE 48". THE HAND HELD SHALL ME MOUNTED SO THAT THE
 GRABBING SURFACE IS MAX 48". FBC-ACC 608.5.3
  
 9) SHT. P1.01 WATER DETAIL LIST BTU'S AS 700,000 BUT
 DETAIL UNDER LIST THEM AS 800,000 BTU. PLEASE CLARIFY
 FBC 107.1
  
 10) PROVIDE ANTI-SIPHONING BACKFLOW DEVICE FOR THE HOT
 WATER STORAGE TANKS ON SHT. P1.01. FBC-PLB 608.2
  
 11) PROVIDE A MEANS OF THEMO EXPANSION FOR THE HOT
 WATER SYSTEM. FBC-PLB 607.3
  
 12) SHT. LI-1 LIST THE BACKFLOW FOR THE IRRAGATION
 SYSTEM AS A PVB WILKINS 720A. THE WILKINS DEVICE IS NOT
 NSF61 COMPLAINT AND PER THE CITY OF W.P.B CROSS
 CONNECTION MANUAL THE CITY WATER SYSTEM SHALL BE
 PROTECTED BY A RPZ LEAD FREE DEVICE.
  
 13) PROVIDE A COMPLETE SANITARY, DOMESTIC WATER, STORM
 WATER, AND GREASE WASTE ISOMETRIC DRAWING FROM THE
 GROUND FLOOR TO THE 4TH. FBC-PLB 107.3.5
  
 14) PROVIDE COMPLETE INSTALLATION MANUAL AND PROVIDE
 CALCULATIONS ON HOW YOU SIZED THE INTERCEPTORS. FBC-PLB
 1003, F.A.C 64E-6
  
 15) SHT. P-1.00 SHOWNS THE KITCHENETTE ON THE SEWER
 LINE. BEING THAT COOKING WILL BE PERFORMED THIS SINK
 SHALL DISCHARGE INTO THE GREASE SYSTEM. FBC-PLB 1003.1
  
 16) PROVIDE DETAIL SHOWING THE ELEVATOR SUMP WILL
 DISCHARGE INTO A INDIRECT WASTE INTO THE SANITARY SEWER
 SYSTEM. FBC 802.1.3
  
 **BEING THAT SEVERAL PAGES ARE MISSING FOR THE
 ISOMETRIC A COMPLETE AND THOROUGH REVIEW COULD NOT BE
 PERFORMED.
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.**
  
 TIM HUNT
 PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR
 CITY OF WEST PALM BEACH
 561-248-2703
 [email protected]

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2020-01-14 Cont ID  
Sent By rmcdouga Date 2020-01-14 Time 07:01 Rev Time 0.00
Received By rmcdouga Date 2020-01-14 Time 07:01 Sent To  
Notes
2020-01-14 07:04:05STRUCTURAL PLANS ARE NOT SIGNED AND SEALED AS REQUIRED.
 THE CONSTRUCTION DOCUMENTS SHALL BE PREPARED BY A
 REGISTERED DESIGN PROFESSIONAL WHERE REQUIRED BY
 CHAPTER 471, FLORIDA STATUTES & 61G15 FLORIDA
 ADMINISTRATIVE CODE OR CHAPTER 481, FLORIDA STATUTES &
 61G1 FLORIDA ADMINISTRATIVE CODE.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2019-04-09 Cont ID  
Sent By rmcdouga Date 2019-04-09 Time 11:42 Rev Time 0.00
Received By thunt Date 2019-04-09 Time 11:41 Sent To  
Notes
2019-04-09 11:43:54ALL STRUCTURAL PAGES ARE LACKING STAMP AND SIGNATURE.
 F.S 471. 481
  
  
  
 TIM HUNT
 PLUMBING PLANS EXAMINER
 BUILDING DIVISION
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 1ST FLOOR
 WEST PALM BEACH, FL 33401
 561-248-2703
 [email protected]
  
2019-03-27 09:51:501ST REVIEW MECH SHEETS GOOD
2019-03-18 12:31:41ELECTRICAL SHEETS PROVIDED OK, WILL NEED TO CHECK ANY
 ADDITIONAL SHEETS SUBMITTED FOR NEXT REVIEW.

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 2 Status F Date 2020-01-14 Cont ID  
Sent By rmcdouga Date 2020-01-14 Time 07:17 Rev Time 0.00
Received By rmcdouga Date 2020-01-14 Time 07:17 Sent To  
Notes
2020-01-14 07:18:53THRESHOLD INSPECTOR: WPB AMENDMENT 110.8.1 W.P.B.
 CONSTRUCTION SERVICES DEPARTMENT REQUEST FOR THRESHOLD
 BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY 553.79(5)
 FLORIDA STATUTES TO THE MINIMUM INSPECTIONS REQUIRED BY
 THIS CODE. THE THRESHOLD INSPECTION FORMS ARE REQUIRED
 TO BE FILED OUT BY ALL PARTIES WITH INTEREST, NOTARIZED
 AND RETURNED TO THIS OFFICE, AND REVIEWED AND APPROVED
 BEFORE PERMIT ISSUANCE WILL TAKE PLACE.
 PLEASE CONTACT ME WITH AN EMAIL ADDRESS AND I WILL BE
 HAPPY TO SEND YOU A COPY OF THE OCTOBER 2018 GUIDELINES
 AND POLICIES FOR PROJECTS CONCERNING THRESHOLD/SPECIAL
 INSPECTORS AND RESIDENT INSPECTORS.
  

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 1 Status F Date 2019-04-18 Cont ID  
Sent By rmcdouga Date 2019-04-18 Time 14:31 Rev Time 0.00
Received By rmcdouga Date 2019-04-18 Time 14:31 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2019-12-13 Cont ID  
Sent By elevesqu Date 2019-12-13 Time 15:14 Rev Time 0.00
Received By elevesqu Date 2019-12-13 Time 15:14 Sent To  
Notes
2019-12-13 15:14:42REPEART COMMENT: SITE PLAN APPROVAL IS NEEDED PRIOR TO
 BUILDING PLAN APPROVAL. PLEASE ADDRESS COMMENTS FROM
 SITE PLAN APPROVAL CASE Z16620016 AND RESUBMIT TO P&Z
  
  
 PREVIOUS COMMENTS FROM 1ST REVIEW STOP. STAFF WILL
 REVIEW FOR SATISFACTION AT TIME OF SITE PLAN REVIEW:
  
 THE FOLLOWING COMMENTS 1-9 LIST THE CONDITIONS FROM THE
 DAC FINAL ORDER AND WHETHER THEY HAVE BEEN SATISFIED:
  
 1. SATISFIED. CROSS WALKS SHALL BE PROVIDED AT STREET
 CORNERS.
 2. SATISFIED. THE WINDOWS ALONG THE NORTH EDGE OF THE
 EAST ELEVATION SHALL BE LOWERED.
 3. SATISFIED - WILL BE REVIEWED THROUGH SEPARATE PERMI.
 TREE GRATES ALONG 3RD STREET AND WEST RAILROAD AVENUE
 SHALL BE REMOVED AND A CONTINUOUS 5? WIDE PLANTING BED
 SHALL BE PROVIDED ALONG THE STREETS.
 4. NOT SATISFIED - WILL BE REVIEWED THROUGH SEPARATE
 PERMIT. THE PROPOSED FLORIDA THATCH PALM ALONG WEST
 RAILROAD AVENUE SHALL BE CHANGED TO OAK TREES.
 5. NOT SATISFIED - WILL BE REVIEWED THROUGH SEPARATE
 PERMI. THE LOCATION OF THE PROPOSED ALEXANDER PALM
 TREES ALONG 4TH STREET SHALL BE ANALYZED FOR THE
 POSSIBILITY OF INCLUDING A SHADE TREE TO MEET THE 30?
 REQUIREMENT FOR SHADE STREET TREES.
 6. SATISFIED. THE PAVERS SHALL BE REMOVED AND THE
 LANDSCAPE BED SHALL BE CONTINUED ALONG THE NORTH FA?ADE
 TO THE BUILDING ENTRANCE.
 7. ONGOING. THE APPLICANT SHALL STUDY THE SITE FOR A
 DIFFERENT LOCATION FOR THE FPL GENERATOR.
 8. NOT SATISFIED. THE BICYCLE RACKS SHALL BE RELOCATED
 TO A MORE SUITABLE LOCATION FOR PUBLIC USE AND MEET THE
 24? SPACE REQUIREMENT FROM BUILDING FA?ADE. BICYCLE
 RACK DETAILS SHALL BE INCLUDED WITH BUILDING PERMIT TO
 MEET THE CITY APPROVED STANDARD.
 PLEASE SHOW LOCATION OF PROPOSED BIKE RACKS WITH
 DIMENSIONS ON SITE PLAN. PLEASE INCLUDE BICYCLE RACK
 DETAIL WITH RESUBMITTAL AS REQUESTED.
 9. NOT SATISFIED. THE PROPOSED BICYCLE RACK ALONG 3RD
 STREET SHALL BE RELOCATED OUTSIDE OF THE FOUNDATION
 LANDSCAPING AREA.
 PLEASE SHOW LOCATION OF BICYCLE RACKS WITH DIMENSIONS
 ON SITE PLAN.
  
 NEW COMMENTS 4/11/2019:
  
 10. THE TOTAL BUILDING FOOTPRINT HAS CHANGED FROM THE
 LAST SITE PLAN SUBMITTAL TO THIS PERMIT SUBMITTAL FROM
 142,279.65 SF TO 142,288.42 FROM LAST DRAWINGS. THE FAR
 BREAKDOWN CHANGED BUT APPEARS THE SAME ON THE
 ILLUSTRATIONS. PLEASE CLARIFY THE DIFFERENCES
 11. CHANGED OUT WINDOWS FOR ALUMINUM VENTILATION
 LOUVRES ON 3RD STREET ELEVATION. PLEASE CLARIFY REASON
 FOR CHANGE AND KEEP WINDOWS IF POSSIBLE. IF BEING
 CHANGED TO LOUVRES, THE TRANSPARENCY CALCULATIONS WILL
 NEED TO RECALCULATED.
 12. WINDOWS WERE REMOVED FOR WOODEN CLAD SYSTEM ALONG
 THE EAST ELEVATION. PLEASE INCLUDE IN NEW CALCULATIONS
 FOR TRANSPARENCY ALONG EAST ELEVATION THAT ALSO
 ADDRESSES THE LARGER WINDOWS THAT WERE ADDED AS PART OF
 DAC APPROVAL,
 13. NEW WINDOWS WERE ADDED ALONG THE WEST ELEVATION.
 PLEASE UPDATE IN THE TRANSPARENCY CALCULATIONS.
 14. PLEASE UPDATE THE NE PERSPECTIVE VIEW ILLUSTRATING
 THE MODIFIED WINDOWS.
 15. THE COLOR ELEVATIONS FOR THE SOUTH ELEVATION (3RD
 STREET) DO NOT SHOW THE ALUMINUM LOUVRES, IT STILL
 SHOWS WINDOWS. PLEASE UPDATE
 16. PLEASE UPDATE THE COLOR ELEVATIONS TO SHOW THE
 MODIFIED WINDOWS ALONG THE EAST ELEVATION (W RAILROAD
 AVE)
 17. PLEASE UPDATE THE COLOR ELEVATIONS TO SHOW THE
 MODIFIED WINDOWS ALONG THE WEST ELEVATION
 18. PLEASE REMOVE THE LANDSCAPE PLAN SHEETS FROM THIS
 SUBMITTAL AND SUBMIT A SEPARATE LANDSCAPE PERMIT.
  

Review Stop Z ZONING
Rev No 1 Status F Date 2019-04-11 Cont ID  
Sent By aaponte Date 2019-04-11 Time 14:16 Rev Time 0.00
Received By elevesqu Date 2019-04-11 Time 14:07 Sent To  
Notes
2019-04-11 14:16:20SITE PLAN APPROVAL IS NEEDED PRIOR TO BUILDING PLAN
 APPROVAL. PLEASE ADDRESS COMMENTS FROM SITE PLAN
 APPROVAL CASE Z16620016 AND RESUBMIT TO P&Z
  
 THE FOLLOWING COMMENTS 1-9 LIST THE CONDITIONS FROM THE
 DAC FINAL ORDER AND WHETHER THEY HAVE BEEN SATISFIED:
  
 1. SATISFIED. CROSS WALKS SHALL BE PROVIDED AT STREET
 CORNERS.
 2. SATISFIED. THE WINDOWS ALONG THE NORTH EDGE OF THE
 EAST ELEVATION SHALL BE LOWERED.
 3. SATISFIED - WILL BE REVIEWED THROUGH SEPARATE PERMI.
 TREE GRATES ALONG 3RD STREET AND WEST RAILROAD AVENUE
 SHALL BE REMOVED AND A CONTINUOUS 5? WIDE PLANTING BED
 SHALL BE PROVIDED ALONG THE STREETS.
 4. NOT SATISFIED - WILL BE REVIEWED THROUGH SEPARATE
 PERMIT. THE PROPOSED FLORIDA THATCH PALM ALONG WEST
 RAILROAD AVENUE SHALL BE CHANGED TO OAK TREES.
 5. NOT SATISFIED - WILL BE REVIEWED THROUGH SEPARATE
 PERMI. THE LOCATION OF THE PROPOSED ALEXANDER PALM
 TREES ALONG 4TH STREET SHALL BE ANALYZED FOR THE
 POSSIBILITY OF INCLUDING A SHADE TREE TO MEET THE 30?
 REQUIREMENT FOR SHADE STREET TREES.
 6. SATISFIED. THE PAVERS SHALL BE REMOVED AND THE
 LANDSCAPE BED SHALL BE CONTINUED ALONG THE NORTH FA?ADE
 TO THE BUILDING ENTRANCE.
 7. ONGOING. THE APPLICANT SHALL STUDY THE SITE FOR A
 DIFFERENT LOCATION FOR THE FPL GENERATOR.
 8. NOT SATISFIED. THE BICYCLE RACKS SHALL BE RELOCATED
 TO A MORE SUITABLE LOCATION FOR PUBLIC USE AND MEET THE
 24? SPACE REQUIREMENT FROM BUILDING FA?ADE. BICYCLE
 RACK DETAILS SHALL BE INCLUDED WITH BUILDING PERMIT TO
 MEET THE CITY APPROVED STANDARD.
 PLEASE SHOW LOCATION OF PROPOSED BIKE RACKS WITH
 DIMENSIONS ON SITE PLAN. PLEASE INCLUDE BICYCLE RACK
 DETAIL WITH RESUBMITTAL AS REQUESTED.
 9. NOT SATISFIED. THE PROPOSED BICYCLE RACK ALONG 3RD
 STREET SHALL BE RELOCATED OUTSIDE OF THE FOUNDATION
 LANDSCAPING AREA.
 PLEASE SHOW LOCATION OF BICYCLE RACKS WITH DIMENSIONS
 ON SITE PLAN.
  
 NEW COMMENTS 4/11/2019:
  
 10. THE TOTAL BUILDING FOOTPRINT HAS CHANGED FROM THE
 LAST SITE PLAN SUBMITTAL TO THIS PERMIT SUBMITTAL FROM
 142,279.65 SF TO 142,288.42 FROM LAST DRAWINGS. THE FAR
 BREAKDOWN CHANGED BUT APPEARS THE SAME ON THE
 ILLUSTRATIONS. PLEASE CLARIFY THE DIFFERENCES
 11. CHANGED OUT WINDOWS FOR ALUMINUM VENTILATION
 LOUVRES ON 3RD STREET ELEVATION. PLEASE CLARIFY REASON
 FOR CHANGE AND KEEP WINDOWS IF POSSIBLE. IF BEING
 CHANGED TO LOUVRES, THE TRANSPARENCY CALCULATIONS WILL
 NEED TO RECALCULATED.
 12. WINDOWS WERE REMOVED FOR WOODEN CLAD SYSTEM ALONG
 THE EAST ELEVATION. PLEASE INCLUDE IN NEW CALCULATIONS
 FOR TRANSPARENCY ALONG EAST ELEVATION THAT ALSO
 ADDRESSES THE LARGER WINDOWS THAT WERE ADDED AS PART OF
 DAC APPROVAL,
 13. NEW WINDOWS WERE ADDED ALONG THE WEST ELEVATION.
 PLEASE UPDATE IN THE TRANSPARENCY CALCULATIONS.
 14. PLEASE UPDATE THE NE PERSPECTIVE VIEW ILLUSTRATING
 THE MODIFIED WINDOWS.
 15. THE COLOR ELEVATIONS FOR THE SOUTH ELEVATION (3RD
 STREET) DO NOT SHOW THE ALUMINUM LOUVRES, IT STILL
 SHOWS WINDOWS. PLEASE UPDATE
 16. PLEASE UPDATE THE COLOR ELEVATIONS TO SHOW THE
 MODIFIED WINDOWS ALONG THE EAST ELEVATION (W RAILROAD
 AVE)
 17. PLEASE UPDATE THE COLOR ELEVATIONS TO SHOW THE
 MODIFIED WINDOWS ALONG THE WEST ELEVATION
 18. PLEASE REMOVE THE LANDSCAPE PLAN SHEETS FROM THIS
 SUBMITTAL AND SUBMIT A SEPARATE LANDSCAPE PERMIT.
  