Plan Review Details - Permit 17121018
Plan Review Stops For Permit 17121018 |
Review Stop |
AD |
ADDRESSING |
Rev No |
2 |
Status |
P |
Date |
2020-01-06 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2020-01-06 |
Time |
10:32 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2020-01-06 |
Time |
10:32 |
Sent To |
|
|
Notes |
2020-01-06 10:33:20 | ADDRESS DETERMINED BY MORIO TO BE 411 W RAILROAD AVE ON | | 7.13.19 CP |
|
|
Review Stop |
AD |
ADDRESSING |
Rev No |
1 |
Status |
F |
Date |
2019-04-08 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2019-04-03 |
Time |
18:03 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2019-03-27 |
Time |
08:37 |
Sent To |
|
|
Notes |
2019-04-03 18:03:30 | THE PERMIT CAN NOT BE ISSUED UNTIL AN ADDRESS HAS BEEN | | ASSIGNED TO THE PROPERTY. IN ORDER TO OBTAIN AN | | ADDRESS, PLEASE CONTACT MICHEAL ORIO BY PHONE AT | | 561-494-1080 OR BY EMAIL AT [email protected]. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2020-01-16 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-01-16 |
Time |
10:42 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-01-10 |
Time |
18:14 |
Sent To |
|
|
Notes |
2020-01-10 18:33:57 | PLAN REVIEW COMMENTS | | | | 2ND REVIEW: FBC FIFTH EDITION (2014) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) NOT ADDRESSED. NO RESPONSE TO COMMENT. ART IN PUBLIC | | PLACES | | THE CITY OF WEST PALM BEACH ART IN PUBLIC PLACES | | ORDINANCE REQUIREMENT THAT APPLIES TO ANY REMODEL OR | | NEW CONSTRUCTION PROJECT FOR WHICH THE PERMIT | | APPLICATION WAS SUBMITTED AFTER 6/29/14, AND THE TOTAL | | PROJECT CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN | | $750,000 WILL NEED TO COMPLY WITH THIS ORDINANCE. | | PER CITY OF WEST PALM BEACH ORDINANCE NO. 4504-14, AND | | CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE V, | | ART IN PUBLIC PLACES, SECTION 78-123(A) AND SECTION | | 78-126(A), THE ART ASSESSMENT IS 1% OF THE TOTAL | | PROJECT CONSTRUCTION COST. | | PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE | | V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND | | NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO | | THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE | | PROJECTS. | | SEC. 78-129. - PUBLIC ART ASSESSMENT FOR PRIVATE | | DEVELOPMENT. | | (A) APPLICABILITY. THE PROVISIONS OF THIS ARTICLE AND | | THE PUBLIC ART ASSESSMENT SECTION SHALL APPLY TO ALL | | PRIVATE DEVELOPMENT PROJECTS, INCLUDING NEW | | CONSTRUCTION, OR THE RENOVATION OR IMPROVEMENT OF AN | | EXISTING BUILDING, WHERE TOTAL CONSTRUCTION COSTS ARE | | EQUAL TO OR GREATER THAN $750,000.00. ALL BUILDINGS | | WITHIN NEW PLANNED DEVELOPMENTS SHALL BE ASSESSED | | CUMULATIVELY TOWARDS THIS ART IN PUBLIC PLACES | | REQUIREMENT, EVEN IF THE BUILDINGS ARE PERMITTED | | SEPARATELY OR DEVELOPED IN PHASES. THE PROVISIONS OF | | THIS SECTION APPLY TO NEW DEVELOPMENT OR NEW | | CONSTRUCTION WITHIN EXISTING PLANNED DEVELOPMENTS. | | FOR INFORMATION PLEASE CONTACT: | | MS. SYBILLE WELTER, ART IN PUBLIC PLACES COORDINATOR AT | | 822-1515 OR E-MAIL: [email protected] | | | | 2) NOT ADDRESSED. NO RESPONSE TO COMMENT. THIS BUILDING | | QUALIFIES AS A THRESHOLD BUILDING AND IS REQUIRED TO | | COMPLY WITH THE FOLLOWING: | | THRESHOLD BUILDING / FL S. S. 553.71(7) "THRESHOLD | | BUILDING" MEANING ANY BUILDING WHICH IS GREATER THAN | | (3) STORIES OR 50 FT. IN HEIGHT, OR WHICH HAS AN | | ASSEMBLY OCCUPANCY CLASSIFICATION AS DENIED IN THE | | FLORIDA BUILDING CODE WHICH EXCEEDS 5,000 SQ. FT. IN | | AREA AND AN OCCUPANT CONTENT OF GREATER THAN 500 | | PERSONS. | | | | A) FBC (CITY AMENDMENTS)110.8.1 THRESHOLD INSPECTION | | PLAN. THE ENFORCING AGENCY SHALL REQUIRE A SPECIAL | | INSPECTOR TO PERFORM STRUCTURAL INSPECTIONS ON A | | THRESHOLD BUILDING PURSUANT TO A STRUCTURAL INSPECTION | | PLAN PREPARED BY THE ENGINEER OF RECORD. THE STRUCTURAL | | INSPECTION PLAN MUST BE SUBMITTED TO THE ENFORCING | | AGENCY PRIOR TO THE ISSUANCE OF A BUILDING PERMIT FOR | | THE CONSTRUCTION OF A THRESHOLD BUILDING. THE PURPOSE | | OF THE STRUCTURAL INSPECTION PLAN IS TO PROVIDE | | SPECIFIC INSPECTION PROCEDURES AND SCHEDULES SO THAT | | THE BUILDING CAN BE ADEQUATELY INSPECTED FOR COMPLIANCE | | WITH THE PERMITTED DOCUMENTS. | | | | B) THRESHOLD INSPECTOR: WPB AMENDMENT 110.8.1 W.P.B. | | CONSTRUCTION SERVICES DEPARTMENT REQUEST FOR THRESHOLD | | BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY 553.79(5) | | FLORIDA STATUTES TO THE MINIMUM INSPECTIONS REQUIRED BY | | THIS CODE. THE THRESHOLD INSPECTION FORMS ARE REQUIRED | | TO BE FILED OUT BY ALL PARTIES WITH INTEREST, NOTARIZED | | AND RETURNED TO THIS OFFICE, AND REVIEWED AND APPROVED | | BEFORE PERMIT ISSUANCE WILL TAKE PLACE. | | | | C) THRESHOLD BLDG. REQUIRED STATEMENT: W.P.B. AMENDMENT | | 110.8.4.4 ALL PLANS FOR THE BUILDING WHICH ARE REQUIRED | | TO BE SIGNED AND SEALED BY THE ARCHITECT OR ENGINEER OF | | RECORD CONTAIN A STATEMENT THAT, TO THE BEST OF THE | | ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND | | SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM | | BUILDING CODES AND THE APPLICABLE FIRE-SAFETY STANDARDS | | AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH | | THIS SECTION AND CHAPTER 633 FLORIDA STATUTES. | | | | D) FOR THE SPECIAL INSPECTOR PLEASE PROVIDE A RESUME OF | | INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE RESUME | | MUST BE ACCOMPANIED BY ALL CERTIFICATES AS SPECIFIED | | HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNATE WILL | | REVIEW THE RESUME. AFTER THE RESUME IS REVIEWED, AN | | INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES | | WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST | | MEETING THE ABOVE CRITERIA. | | | | E) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR HISTORY | | FOR THIS TYPE OF CONSTRUCTION. | | | | F) NOTE: FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE, | | PLEASE E-MAIL THE PERMIT LIBRARIAN OF THE PERMIT BEING | | ISSUED, THE PERMIT LIBRARIAN WILL THEN E-MAIL YOU THE | | APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR | | PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN | | COLOR, (1) FOR THE THRESHOLD INSPECTOR, THE OTHER FOR | | THE MEP INSPECTORS OTHER PLANS YOU WISH TO PRINT MAYBE | | IN BLACK & WHITE. | | | | G) 110.8.4.3 ALL SHORING AND RESHORING PROCEDURES, | | PLANS AND DETAILS SHALL BE SUBMITTED TO THE ENFORCEMENT | | AGENCY FOR RECORDKEEPING. EACH SHORING AND RESHORING | | INSTALLATION SHALL BE SUPERVISED, INSPECTED AND | | CERTIFIED TO BE IN COMPLIANCE WITH THE SHORING | | DOCUMENTS BY THE CONTRACTOR. | | | | H) PLEASE CALL THE CITY OF WEST PALM BEACH'S AUTOMATED | | TELEPHONE INSPECTIONS LINE (561) 805-6700 FOR ALL | | BUILDING INSPECTIONS FOR AUDITING OF JOBSITE | | INSPECTIONS WITHOUT THIS THE PERMIT EXPIRES IN 6 | | MONTHS, ABANDONMENT OF JOB, NO INSPECTION ACTIVITY. | | | | I) 110.8 THRESHOLD BUILDINGS, OPERATING GUIDELINES FOR | | THRESHOLD INSPECTORS #25. ASSURE THAT THE DESIGNER HAS | | REQUIRED ON THE PLANS OR SPECIFICATIONS ONE MATERIAL, | | APPROVED FOR FIRE STOPPING PENETRATIONS, FOR WALLS AND | | CEILINGS. | | | | J) PLEASE CONTACT ME WITH AN EMAIL ADDRESS AND I WILL | | BE HAPPY TO SEND YOU A COPY OF THE OCTOBER 2018 | | GUIDELINES AND POLICIES FOR PROJECTS CONCERNING | | THRESHOLD/SPECIAL INSPECTORS AND RESIDENT INSPECTORS. | | | | 3) NO RESPONSE TO COMMENT. 109.3 BUILDING PERMIT | | VALUATION. | | IF, IN THE OPINION OF THE BUILDING OFFICIAL, THE | | CLAIMED VALUATION OF BUILDING, ALTERATION, STRUCTURE, | | ELECTRICAL, GAS, MECHANICAL, OR PLUMBING SYSTEMS | | APPEARS TO BE UNDER ESTIMATED ON THE APPLICATION, THE | | PERMIT SHALL BE DENIED. FOR PERMITTING PURPOSES, | | VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL | | REPLACEMENT PURPOSES, VALUATION OF BUILDINGS AND | | SYSTEMS SHALL BE THE TOTAL REPLACEMENT VALUE TO INCLUDE | | STRUCTURAL, ELECTRICAL, PLUMBING, MECHANICAL, INTERIOR | | FINISHES, NORMAL SITE WORK (EXCAVATION AND BACKFILL FOR | | BUILDINGS), ARCHITECTURAL AND DESIGN FEES, MARKETING | | COST, OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. | | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED | | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES | | (MARSHALL-SWIFT, MEANS, ETC.) WITH REGIONAL ADJUSTMENTS | | FOR LOCATION AS PUBLISHED BY THE INTERNATIONAL CODE | | CONGRESS. | | | | THIS MAIN BUILDING PERMIT WILL INCLUDE THE FEES FOR THE | | MECHANICAL, ELECTRICAL, PLUMBING & ROOFING PERMITS. | | WHEN THE GENERAL CONTRACTOR COMES IN FOR A BUILDING | | PERMIT WITH THE SIGNED PERMIT APPLICATION FORM BY THE | | QUALIFIER AND OWNER AND BRINGS IN THE LISTED | | SUB-PERMITS M-E-P & ROOFING PERMITS SIGNED BY THE | | QUALIFIER OF EACH COMPANY, THEIR INSURANCES AND | | LICENSURE UP TO DATE, THE M-E-P AND ROOFING PERMITS ARE | | FREE OF CHARGE. IF THE M-E-P & ROOFING PERMITS COME IN | | LATER THERE WILL BE AN $80.00 ADMINISTRATIVE FEE FOR | | EACH PERMIT. | | | | ALL OTHER PERMITS FIRE SPRINKLER, FIRE ALARM, RACK | | STORAGE, EXHAUST HOODS, ANSUL SYSTEMS OR ALTERNATIVE | | AUTOMATIC FIRE-EXTINGUISHING SYSTEMS, WALK IN COOLERS & | | FREEZERS, ALL LOW VOLTAGE PERMITS, GENERATORS & FUEL | | TANKS, GAS PERMIT, POOL, JACUZZI AND ASSOCIATED | | SUB-PERMITS, AWNING, SCREEN ENCLOSURES, CANOPY, FENCE, | | LANDSCAPE, IRRIGATION, AUGER CAST PILE AND OR | | FOUNDATION OR STRUCTURE ONLY PERMIT WILL BE SEPARATE | | REVIEWS AND ASSOCIATED FEES WITH EACH PERMIT. | | PLEASE PROVIDE AN ITEMIZED LIST AND SUBTRACT THESE LINE | | ITEMS AND THEIR VALUE FROM THE OVERALL BUILDING VALUE | | STATED ON THE PERMIT APPLICATION FOR THIS PROJECT. THE | | REMAINING BALANCE WILL EFFECTIVELY BE THE VALUE OF THE | | BUILDING THAT THE PERMIT FEES WILL BE BASED ON FOR THIS | | PERMIT. THE BUILDING DEPARTMENT DOES NOT WANT TO | | COLLECT TWICE FOR THE VALUE OF THESE SUB-PERMITS NOT | | COVERED UNDER THE PRIME OR MASTER PERMIT. | | | | 4) NOT ADDRESSED. NO RESPONSE TO COMMENT. PROVIDE A PER | | FLOOR AREA BREAKDOWN FOR EACH OCCUPANCY TYPE ON THAT | | FLOOR. THIS IS REQUIRED IN ORDER TO DO AN ACCURATE | | VALUATION AMOUNT FOR THE BUILDING. FBC 109.3 | | | | 5) NOT ADDRESSED. NO RESPONSE TO COMMENT. THE | | STRUCTURAL DRAWINGS HAVE NOT BEEN SIGNED AND SEALED BY | | THE DESIGN PROFESSIONAL OF RECORD AS REQUIRED BY FS 471 | | OR FS 481 AND ARE MARKED "NOT FOR CONSTRUCTION". | | | | 6) NOT ADDRESSED. THE ARCHITECT'S RESPONSE LETTER | | REFERS TO AN OWNER'S RESPONSE LETTER WHICH WAS NOT | | FOUND IN NOT ADDRESSED. THE CONSTRUCTION DOCUMENTS. | | SPECIFY ON THE PLANS THAT THE EXTENDED STAY ROOMS WILL | | NOT BE RENTED OR LEASED TO THE SAME OCCUPANT FOR MORE | | THAN THIRTY DAYS. THE CODE ANALYSIS ON SHEET A-1.00A, | | SPECIFIES THE HOTEL AND EXTENDED STAY ROOMS AS | | OCCUPANCY GROUP AS R-1. THE EXTENDED STAY ROOMS PROVIDE | | COMPLETE INDEPENDENT LIVING FACILITIES INCLUDING | | PERMANENT PROVISIONS FOR COOKING AND MEET THE | | DEFINITION OF A DWELLING UNIT IN CHAPTER 2 OF THE | | BUILDING CODE. WILL THE EXTENDED STAY ROOMS BE RENTED | | OR LEASED TO THE SAME OCCUPANT FOR MORE THAN 30 DAYS? | | IF SO, THEY ARE CLASSIFIED AS HOTEL (NON-TRANSIENT) AND | | GROUP R-2. THIS WILL REQUIRE THESE ROOMS TO TO COMPLY | | WITH FAIR HOUSING GUIDELINES. FBC SECTION 310 | | | | 7) NOT ADDRESSED. NO RESPONSE TO COMMENT. SUBMIT THE | | APPROPRIATE FORMS TO SHOW COMPLIANCE WITH THE SECTION | | C401.2 OF THE 2014 FBC ENERGY CONSERVATION. | | | | 8) NOT ADDRESSED. NO RESPONSE TO COMMENT. SUBMIT A | | GEOTECHNICAL (SOIL INVESTIGATION) REPORT FOR THE | | PROJECT. FBC 1803 | | | | 9) COMPLIED. | | | | 10) COMPLIED. | | | | 11) COMPLIED. | | | | 12) COMPLIED. | | | | 13) COMPLIED. | | | | 14) COMPLIED. | | | | 15) NOT COMPLETELY ADDRESSED. IT DOES NOT APPEAR THAT | | THE ROOMS ARE ADEQUATELY DISPERSED AS REQUIRED BY FBC | | ACCESSIBILITY SECTION 224.5 WITH REGARD TO LOCATION AND | | VIEWS. THE FBC ACCESSIBILITY TABLE 224.4 REQUIRES 17 | | GUEST ROOMS WITH COMMUNICATION FEATURES. SECTION 224.5 | | DISPERSION REQUIRES AT LEAST ONE GUEST ROOM REQUIRED TO | | PROVIDE MOBILITY FEATURES COMPLYING WITH 806.2 SHALL | | ALSO PROVIDE COMMUNICATION FEATURES COMPLYING WITH | | 806.3. NOT MORE THAN 10 PERCENT OF GUEST ROOMS REQUIRED | | TO PROVIDE MOBILITY FEATURES COMPLYING WITH 806.2 SHALL | | BE USED TO SATISFY THE MINIMUM NUMBER OF GUEST ROOMS | | REQUIRED TO PROVIDE COMMUNICATION FEATURES COMPLYING | | WITH 806.3. TEN PERCENT OF THE 10 REQUIRED GUEST ROOMS | | WITH MOBILITY FEATURES IS ONE (1). THEREFORE, ONLY ONE | | OF THE REQUIRED 17 GUEST ROOMS WITH COMMUNICATION | | FEATURES CAN BE A GUEST ROOM WITH MOBILITY FEATURES. | | PLEASE REVISE PLANS TO COMPLY. | | | | 16) COMPLIED. | | | | 17) NOT ADDRESSED. NO RESPONSE TO COMMENT. SPECIFY THE | | LIVE LOADS REQUIRED BY FBC TABLE 1607.1 FOR EACH AREA | | OF THE BUILDING ON THE PLANS. | | | | 18) NOT CORRECTLY ADDRESSED. THE OPENING CALCULATIONS | | ON SHEET A-1.00A DO NOT USE THE ENTIRE PERIMETER WALL | | AREA OR THE TOTAL PERIMETER LENGTH OF ALL FOUR SIDES OF | | EACH TIER OF THE PARKING GARAGE AS REQUIRED BY FBC | | 406.5. THE PLANS SPECIFY THAT THE PARKING GARAGE IN | | THIS BUILDING IS AN OPEN GARAGE. THIS DOES NOT APPEAR | | TO BE AN OPEN GARAGE. THE OPENINGS DO NOT MEET THE | | REQUIREMENT OF FBC 406.5.2 FOR BEING UNIFORMLY | | DISTRIBUTED ON AT LEAST TWO SIDES OF THE STRUCTURE. THE | | CALCULATIONS FOR THE AREA OF OPENINGS IN THE EXTERIOR | | WALLS APPEARS TO BE INCORRECT. FBC 406.5 REQUIRES THE | | AREA OF SUCH OPENINGS IN EXTERIOR WALLS ON A TIER TO BE | | NOT LESS THAN 20 PERCENT OF THE TOTAL PERIMETER WALL | | AREA OF EACH TIER. REVISE PLANS FOR AN ENCLOSED GARAGE. | | | | 19) COMPLIED. | | | | 20) NOT COMPLETELY ADDRESSED. NOT ALL OF THE REQUESTED | | INFORMATION HAS BEEN PROVIDED. | | THE LIFE SAFETY PLANS NEED TO SHOW THE FOLLOWING FOR | | EACH FLOOR: | | A) THE NUMBER OF OCCUPANTS IN EACH AREA FBC 1004.1 | | B) THE CUMULATIVE OCCUPANT LOADS FBC 1004.1.1 | | C) THE EXIT SEPARATION DISTANCE FBC 1015.2.1 | | D) THE COMMON PATH OF EGRESS TRAVEL DISTANCE FBC 1014.3 | | E) THE EXIT ACCESS TRAVEL DISTANCE FBC 1016.3 | | F) THE CLEAR WIDTH OF THE EXIT OR EXIT ACCESS DOORS FBC | | 1008.1.1 | | G) THE CAPACITY OF EGRESS DOORS, OCCUPANT LOAD SERVED | | AND MEANS OF EGRESS FACTOR FBC1005.3.2 | | H) THE DISTRIBUTION OF EGRESS CAPACITY FBC1005.5 | | | | 21) COMPLIED. | | | | 22) NOT COMPLETELY ADDRESSED. THE LINEN AND TRASH CHUTE | | DISCHARGE ROOMS HAVE TO BE IDENTIFIED AND SEPARATED ON | | THE PLANS.FBC 713.13 THE LINEN CHUTE SECTION ON SHEET | | A-6.02 HAS THE TERMINATION ROOM AND THE ACCESS ROOMS | | LABELED AS GARBAGE ROOMS. PLEASE CORRECT. FBC 713.13.1 | | | | 23) COMPLIED. | | | | 24) COMPLIED. | | | | 25) COMPLIED. | | | | 26) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A | | RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE | | CITY RE-SUBMITTAL FORM. | | | | NEW COMMENTS | | | | 27) SPECIFY THE EXIT SEPARATION DISTANCE FOR THE | | RESTAURANT AREA LOCATED ON THE GROUND FLOOR. | | | | 28) SHOW THAT THE LOCATION OF THE EXERCISE MACHINES AND | | EQUIPMENT IN THE GYM WILL COMPLY WITH THE REQUIREMENTS | | OF 2014 FBC ACCESSIBILITY SECTIONS 236 AND 1004. | | | | 29) SHOW THAT THE BAR IN THE RESTAURANT COMPLIES WITH | | 2014 FBC ACCESSIBILITY SECTIONS 226 AND 902. | | | | 30) SHOW THAT THE CHECK-IN ARE SERVICE COUNTER COMPLIES | | WITH 2014 FBC ACCESSIBILITY SECTION 904. | | | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2019-04-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2019-04-19 |
Time |
18:21 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2019-04-04 |
Time |
08:17 |
Sent To |
|
|
Notes |
2019-04-03 18:50:36 | PLAN REVIEW COMMENTS | | | | 1ST REVIEW: FBC FIFTH EDITION (2014) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) ART IN PUBLIC PLACES | | THE CITY OF WEST PALM BEACH ART IN PUBLIC PLACES | | ORDINANCE REQUIREMENT THAT APPLIES TO ANY REMODEL OR | | NEW CONSTRUCTION PROJECT FOR WHICH THE PERMIT | | APPLICATION WAS SUBMITTED AFTER 6/29/14, AND THE TOTAL | | PROJECT CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN | | $750,000 WILL NEED TO COMPLY WITH THIS ORDINANCE. | | PER CITY OF WEST PALM BEACH ORDINANCE NO. 4504-14, AND | | CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE V, | | ART IN PUBLIC PLACES, SECTION 78-123(A) AND SECTION | | 78-126(A), THE ART ASSESSMENT IS 1% OF THE TOTAL | | PROJECT CONSTRUCTION COST. | | PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE | | V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND | | NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO | | THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE | | PROJECTS. | | SEC. 78-129. - PUBLIC ART ASSESSMENT FOR PRIVATE | | DEVELOPMENT. | | (A) APPLICABILITY. THE PROVISIONS OF THIS ARTICLE AND | | THE PUBLIC ART ASSESSMENT SECTION SHALL APPLY TO ALL | | PRIVATE DEVELOPMENT PROJECTS, INCLUDING NEW | | CONSTRUCTION, OR THE RENOVATION OR IMPROVEMENT OF AN | | EXISTING BUILDING, WHERE TOTAL CONSTRUCTION COSTS ARE | | EQUAL TO OR GREATER THAN $750,000.00. ALL BUILDINGS | | WITHIN NEW PLANNED DEVELOPMENTS SHALL BE ASSESSED | | CUMULATIVELY TOWARDS THIS ART IN PUBLIC PLACES | | REQUIREMENT, EVEN IF THE BUILDINGS ARE PERMITTED | | SEPARATELY OR DEVELOPED IN PHASES. THE PROVISIONS OF | | THIS SECTION APPLY TO NEW DEVELOPMENT OR NEW | | CONSTRUCTION WITHIN EXISTING PLANNED DEVELOPMENTS. | | FOR INFORMATION PLEASE CONTACT: | | MS. SYBILLE WELTER, ART IN PUBLIC PLACES COORDINATOR AT | | 822-1515 OR E-MAIL: [email protected] | | | | 2) THIS BUILDING QUALIFIES AS A THRESHOLD BUILDING AND | | IS REQUIRED TO COMPLY WITH THE FOLLOWING: | | THRESHOLD BUILDING / FL S. S. 553.71(7) "THRESHOLD | | BUILDING" MEANING ANY BUILDING WHICH IS GREATER THAN | | (3) STORIES OR 50 FT. IN HEIGHT, OR WHICH HAS AN | | ASSEMBLY OCCUPANCY CLASSIFICATION AS DENIED IN THE | | FLORIDA BUILDING CODE WHICH EXCEEDS 5,000 SQ. FT. IN | | AREA AND AN OCCUPANT CONTENT OF GREATER THAN 500 | | PERSONS. | | | | A) FBC (CITY AMENDMENTS)110.8.1 THRESHOLD INSPECTION | | PLAN. THE ENFORCING AGENCY SHALL REQUIRE A SPECIAL | | INSPECTOR TO PERFORM STRUCTURAL INSPECTIONS ON A | | THRESHOLD BUILDING PURSUANT TO A STRUCTURAL INSPECTION | | PLAN PREPARED BY THE ENGINEER OF RECORD. THE STRUCTURAL | | INSPECTION PLAN MUST BE SUBMITTED TO THE ENFORCING | | AGENCY PRIOR TO THE ISSUANCE OF A BUILDING PERMIT FOR | | THE CONSTRUCTION OF A THRESHOLD BUILDING. THE PURPOSE | | OF THE STRUCTURAL INSPECTION PLAN IS TO PROVIDE | | SPECIFIC INSPECTION PROCEDURES AND SCHEDULES SO THAT | | THE BUILDING CAN BE ADEQUATELY INSPECTED FOR COMPLIANCE | | WITH THE PERMITTED DOCUMENTS. | | | | B) THRESHOLD INSPECTOR: WPB AMENDMENT 110.8.1 W.P.B. | | CONSTRUCTION SERVICES DEPARTMENT REQUEST FOR THRESHOLD | | BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY 553.79(5) | | FLORIDA STATUTES TO THE MINIMUM INSPECTIONS REQUIRED BY | | THIS CODE. THE THRESHOLD INSPECTION FORMS ARE REQUIRED | | TO BE FILED OUT BY ALL PARTIES WITH INTEREST, NOTARIZED | | AND RETURNED TO THIS OFFICE, AND REVIEWED AND APPROVED | | BEFORE PERMIT ISSUANCE WILL TAKE PLACE. | | | | C) THRESHOLD BLDG. REQUIRED STATEMENT: W.P.B. AMENDMENT | | 110.8.4.4 ALL PLANS FOR THE BUILDING WHICH ARE REQUIRED | | TO BE SIGNED AND SEALED BY THE ARCHITECT OR ENGINEER OF | | RECORD CONTAIN A STATEMENT THAT, TO THE BEST OF THE | | ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND | | SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM | | BUILDING CODES AND THE APPLICABLE FIRE-SAFETY STANDARDS | | AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH | | THIS SECTION AND CHAPTER 633 FLORIDA STATUTES. | | | | D) FOR THE SPECIAL INSPECTOR PLEASE PROVIDE A RESUME OF | | INSPECTION EXPERIENCE ON PREVIOUS PROJECT. THE RESUME | | MUST BE ACCOMPANIED BY ALL CERTIFICATES AS SPECIFIED | | HEREIN. THE BUILDING OFFICIAL OR HIS DESIGNEE WILL | | REVIEW THE RESUME. AFTER THE RESUME IS REVIEWED, AN | | INTERVIEW WILL BE SCHEDULED. UNDER NO CIRCUMSTANCES | | WILL AN INSPECTOR BE INTERVIEWED FOR WORK WITHOUT FIRST | | MEETING THE ABOVE CRITERIA. | | | | E) THE CONTRACTOR WILL PRODUCE A JOB SUMMARY OR HISTORY | | FOR THIS TYPE OF CONSTRUCTION. | | | | F) NOTE: FOR DIGITAL PLANS, AFTER PERMIT ISSUANCE, | | PLEASE E-MAIL THE PERMIT LIBRARIAN OF THE PERMIT BEING | | ISSUED, THE PERMIT LIBRARIAN WILL THEN E-MAIL YOU THE | | APPROVED AND BATCH STAMPED PLANS SO YOU MAY PRINT YOUR | | PLANS, TWO SETS OF PLANS WILL NEED TO BE PRINTED IN | | COLOR, (1) FOR THE THRESHOLD INSPECTOR, THE OTHER FOR | | THE MEP INSPECTORS OTHER PLANS YOU WISH TO PRINT MAYBE | | IN BLACK & WHITE. | | | | G) 110.8.4.3 ALL SHORING AND RESHORING PROCEDURES, | | PLANS AND DETAILS SHALL BE SUBMITTED TO THE ENFORCEMENT | | AGENCY FOR RECORDKEEPING. EACH SHORING AND RESHORING | | INSTALLATION SHALL BE SUPERVISED, INSPECTED AND | | CERTIFIED TO BE IN COMPLIANCE WITH THE SHORING | | DOCUMENTS BY THE CONTRACTOR. | | | | H) PLEASE CALL THE CITY OF WEST PALM BEACH'S AUTOMATED | | TELEPHONE INSPECTIONS LINE (561) 805-6700 FOR ALL | | BUILDING INSPECTIONS FOR AUDITING OF JOBSITE | | INSPECTIONS WITHOUT THIS THE PERMIT EXPIRES IN 6 | | MONTHS, ABANDONMENT OF JOB, NO INSPECTION ACTIVITY. | | | | I) 110.8 THRESHOLD BUILDINGS, OPERATING GUIDELINES FOR | | THRESHOLD INSPECTORS #25. ASSURE THAT THE DESIGNER HAS | | REQUIRED ON THE PLANS OR SPECIFICATIONS ONE MATERIAL, | | APPROVED FOR FIRE STOPPING PENETRATIONS, FOR WALLS AND | | CEILINGS. | | | | J) PLEASE CONTACT ME WITH AN EMAIL ADDRESS AND I WILL | | BE HAPPY TO SEND YOU A COPY OF THE OCTOBER 2018 | | GUIDELINES AND POLICIES FOR PROJECTS CONCERNING | | THRESHOLD/SPECIAL INSPECTORS AND RESIDENT INSPECTORS. | | | | 3) 109.3 BUILDING PERMIT VALUATION. | | IF, IN THE OPINION OF THE BUILDING OFFICIAL, THE | | CLAIMED VALUATION OF BUILDING, ALTERATION, STRUCTURE, | | ELECTRICAL, GAS, MECHANICAL, OR PLUMBING SYSTEMS | | APPEARS TO BE UNDER ESTIMATED ON THE APPLICATION, THE | | PERMIT SHALL BE DENIED. FOR PERMITTING PURPOSES, | | VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL | | REPLACEMENT PURPOSES, VALUATION OF BUILDINGS AND | | SYSTEMS SHALL BE THE TOTAL REPLACEMENT VALUE TO INCLUDE | | STRUCTURAL, ELECTRICAL, PLUMBING, MECHANICAL, INTERIOR | | FINISHES, NORMAL SITE WORK (EXCAVATION AND BACKFILL FOR | | BUILDINGS), ARCHITECTURAL AND DESIGN FEES, MARKETING | | COST, OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. | | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED | | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES | | (MARSHALL-SWIFT, MEANS, ETC.) WITH REGIONAL ADJUSTMENTS | | FOR LOCATION AS PUBLISHED BY THE INTERNATIONAL CODE | | CONGRESS. | | | | THIS MAIN BUILDING PERMIT WILL INCLUDE THE FEES FOR THE | | MECHANICAL, ELECTRICAL, PLUMBING & ROOFING PERMITS. | | WHEN THE GENERAL CONTRACTOR COMES IN FOR A BUILDING | | PERMIT WITH THE SIGNED PERMIT APPLICATION FORM BY THE | | QUALIFIER AND OWNER AND BRINGS IN THE LISTED | | SUB-PERMITS M-E-P & ROOFING PERMITS SIGNED BY THE | | QUALIFIER OF EACH COMPANY, THEIR INSURANCES AND | | LICENSURE UP TO DATE, THE M-E-P AND ROOFING PERMITS ARE | | FREE OF CHARGE. IF THE M-E-P & ROOFING PERMITS COME IN | | LATER THERE WILL BE AN $80.00 ADMINISTRATIVE FEE FOR | | EACH PERMIT. | | | | ALL OTHER PERMITS FIRE SPRINKLER, FIRE ALARM, RACK | | STORAGE, EXHAUST HOODS, ANSUL SYSTEMS OR ALTERNATIVE | | AUTOMATIC FIRE-EXTINGUISHING SYSTEMS, WALK IN COOLERS & | | FREEZERS, ALL LOW VOLTAGE PERMITS, GENERATORS & FUEL | | TANKS, GAS PERMIT, POOL, JACUZZI AND ASSOCIATED | | SUB-PERMITS, AWNING, SCREEN ENCLOSURES, CANOPY, FENCE, | | LANDSCAPE, IRRIGATION, AUGER CAST PILE AND OR | | FOUNDATION OR STRUCTURE ONLY PERMIT WILL BE SEPARATE | | REVIEWS AND ASSOCIATED FEES WITH EACH PERMIT. | | PLEASE PROVIDE AN ITEMIZED LIST AND SUBTRACT THESE LINE | | ITEMS AND THEIR VALUE FROM THE OVERALL BUILDING VALUE | | STATED ON THE PERMIT APPLICATION FOR THIS PROJECT. THE | | REMAINING BALANCE WILL EFFECTIVELY BE THE VALUE OF THE | | BUILDING THAT THE PERMIT FEES WILL BE BASED ON FOR THIS | | PERMIT. THE BUILDING DEPARTMENT DOES NOT WANT TO | | COLLECT TWICE FOR THE VALUE OF THESE SUB-PERMITS NOT | | COVERED UNDER THE PRIME OR MASTER PERMIT. | | | | 4) PROVIDE A PER FLOOR AREA BREAKDOWN FOR EACH | | OCCUPANCY TYPE ON THAT FLOOR. THIS IS REQUIRED IN ORDER | | TO DO AN ACCURATE VALUATION AMOUNT FOR THE BUILDING. | | FBC 109.3 | | | | 5) THE STRUCTURAL DRAWINGS HAVE NOT BEEN SIGNED AND | | SEALED BY THE DESIGN PROFESSIONAL OF RECORD AS REQUIRED | | BY FS 471 OR FS 481 AND ARE MARKED "NOT FOR | | CONSTRUCTION". | | | | 6) THE CODE ANALYSIS ON SHEET A-1.00A, SPECIFIES THE | | HOTEL AND EXTENDED STAY ROOMS AS OCCUPANCY GROUP AS | | R-1. THE EXTENDED STAY ROOMS PROVIDE COMPLETE | | INDEPENDENT LIVING FACILITIES INCLUDING PERMANENT | | PROVISIONS FOR COOKING AND MEET THE DEFINITION OF A | | DWELLING UNIT IN CHAPTER 2 OF THE BUILDING CODE. WILL | | THE EXTENDED STAY ROOMS BE RENTED OR LEASED TO THE SAME | | OCCUPANT FOR MORE THAN 30 DAYS? IF SO, THEY ARE | | CLASSIFIED AS HOTEL (NON-TRANSIENT) AND GROUP R-2. THIS | | WILL REQUIRE THESE ROOMS TO TO COMPLY WITH FAIR HOUSING | | GUIDELINES. FBC SECTION 310 | | | | 7) SUBMIT THE APPROPRIATE FORMS TO SHOW COMPLIANCE WITH | | THE SECTION C401.2 OF THE 2014 FBC ENERGY CONSERVATION. | | | | 8) SUBMIT A GEOTECHNICAL (SOIL INVESTIGATION) REPORT | | FOR THE PROJECT. FBC 1803 | | | | 9) FBC ACCESSIBILITY SECTION 208.2.4 REQUIRES ONE VAN | | PARKING SPACE FOR EVERY SIX OR FRACTION OF SIX | | ACCESSIBLE PARKING SPACES. SPECIFY THE LOCATION OF THE | | DESIGNATED VAN PARKING SPACES ON THE PLANS. | | | | 10) THE OVERALL FLOOR PLANS LEGEND AND NOTES ON SHEET | | A-2.00 SPECIFIES THAT A SHADED AREA WILL BE INDICATED | | WHERE THE 8'-3" CLEAR AREA FOR VAN PARKING AND DRIVEWAY | | WILL BE PROVIDED. I DID NOT SEE THIS ON THE PLANS. | | PLEASE CLARIFY. FBC 107.2.1 | | | | 11) ON SHEET A-2.00, THE LEGEND FOR THE ONE AND TWO | | HOUR RATED WALLS IS NOT FOLLOWED ON THE PLANS. TWO | | SHORT DASHES BETWEEN THE LONG DASHES IS USED FOR THE 1 | | HOUR FIRE RATED WALLS AND A LINE OF DASHES IS USED FOR | | THE 2 HOUR FIRE RATED WALLS. PLEASE REVISE. FBC 107.2.1 | | | | 12) THE SWIMMING POOL IS REQUIRED TO HAVE A SEPARATE | | PERMIT. ACCESS TO THE POOL AREA FROM THE BUILDING AND | | THE PRIVATE COURTYARDS ARE REQUIRED TO COMPLY WITH THE | | POOL BARRIER REQUIREMENTS OF FBC 454.2.17. | | | | 13) ACCESS INTO AND OUT OF THE SWIMMING POOL IS | | REQUIRED TO BE ACCESSIBLE. FBC ACCESSIBILITY 242.2 AT | | LEAST TWO ACCESSIBILE MEANS OF ENTRY SHALL BE PROVIDED | | FOR SWIMMING POOLS. SHOW HOW THE POOL WILL COMPLY. | | | | 14) THE FBC ACCESSIBILITY TABLE 224.2 REQUIRES 10 GUEST | | ROOMS WITH MOBILITY FEATURES. THREE OF THE ROOMS ARE | | REQUIRED TO HAVE ROLL-IN SHOWERS. SECTION 224.6.3 | | REQUIRES A NUMBER OF ROOMS EQUALING 5% OF THE GUEST | | ROOMS MINUS THE TOTAL ACCESSIBLE ROOMS REQUIRED BY | | TABLE 224.2 TO PROVIDE SPECIAL ACCESSIBILITY FEATURES | | OF 806.4. TAKING 5 PERCENT OF 224 IS 11.2 OR 12. | | SUBTRACTING 10 FROM 12 LEAVES 2. THEREFORE IN ADDITION | | TO THE TEN (10) ADA QUEST ROOMS WITH MOBILITY FEATURES | | AN ADDITIONAL TWO (2) ROOMS WOULD BE REQUIRED TO COMPLY | | WITH 806.4. THE NUMBER OF ADA MOBILITY ROOMS SPECIFIED | | ON SHEET A-1.00A IS 14. THIS WILL MEET OR EXCEED THE | | NUMBER OF ROOMS REQUIRED. | | | | 15) THE FBC ACCESSIBILITY TABLE 224.4 REQUIRES 17 GUEST | | ROOMS WITH COMMUNICATION FEATURES. SECTION 224.5 | | DISPERSION REQUIRES AT LEAST ONE GUEST ROOM REQUIRED TO | | PROVIDE MOBILITY FEATURES COMPLYING WITH 806.2 SHALL | | ALSO PROVIDE COMMUNICATION FEATURES COMPLYING WITH | | 806.3. NOT MORE THAN 10 PERCENT OF GUEST ROOMS REQUIRED | | TO PROVIDE MOBILITY FEATURES COMPLYING WITH 806.2 SHALL | | BE USED TO SATISFY THE MINIMUM NUMBER OF GUEST ROOMS | | REQUIRED TO PROVIDE COMMUNICATION FEATURES COMPLYING | | WITH 806.3. TEN PERCENT OF THE 10 REQUIRED GUEST ROOMS | | WITH MOBILITY FEATURES IS ONE (1). THEREFORE, ONLY ONE | | OF THE REQUIRED 17 GUEST ROOMS WITH COMMUNICATION | | FEATURES CAN BE A GUEST ROOM WITH MOBILITY FEATURES. | | PLEASE REVISE PLANS TO COMPLY. | | | | 16) FBC ACCESSIBILITY SECTION 209.4 REQUIRES PARKING | | FACILITIES THAT PROVIDE VALET PARKING SERVICES TO | | PROVIDE AT LEAST ONE PASSENGER LOADING ZONE COMPLYING | | WITH SECTION 503. SHOW THAT THE PASSENGER DROP OF AREA | | ON THE PLANS COMPLIES WITH SECTION 503 OF THE FLORIDA | | ACCESSIBILITY CODE. | | | | 17) SPECIFY THE LIVE LOADS REQUIRED BY FBC TABLE 1607.1 | | FOR EACH AREA OF THE BUILDING ON THE PLANS. | | | | 18) THE PLANS SPECIFY THAT THE PARKING GARAGE IN THIS | | BUILDING IS AN OPEN GARAGE. THIS DOES NOT APPEAR TO BE | | AN OPEN GARAGE. THE OPENINGS DO NOT MEET THE | | REQUIREMENT OF FBC 406.5.2 FOR BEING UNIFORMLY | | DISTRIBUTED ON AT LEAST TWO SIDES OF THE STRUCTURE. THE | | CALCULATIONS FOR THE AREA OF OPENINGS IN THE EXTERIOR | | WALLS APPEARS TO BE INCORRECT. FBC 406.5 REQUIRES THE | | AREA OF SUCH OPENINGS IN EXTERIOR WALLS ON A TIER TO BE | | NOT LESS THAN 20 PERCENT OF THE TOTAL PERIMETER WALL | | AREA OF EACH TIER. REVISE PLANS FOR AN ENCLOSED GARAGE. | | | | 19) THERE IS A PROBLEM WITH THE CALCULATIONS FOR THE 25 | | PERCENT ALLOWABLE AREA OF EXTERIOR WALL OPENINGS FOR | | THE WEST BUILDING ELEVATION. FBC 705.8.1 STATES THAT | | THE MAXIMUM AREA OF UNPROTECTED AND PROTECTED OPENINGS | | IN AN EXTERIOR WALL IN ANY STORY SHALL NOT EXCEED THE | | PERCENTAGES SPECIFIED IN TABLE 705.8. THE TABLE ALLOWS | | 25 PERCENT OPENINGS FOR A FIRE SEPARATION DISTANCE OF 5 | | FEET TO LESS THAN 10 FEET. THE OPENING AREA IN THE WALL | | OF THE PARKING GARAGE EXCEEDS THE ALLOWABLE OPENING | | AREA ON THE GROUND STORY AND THE MEZZANINE STORY.THE | | OPENINGS IN THE WALLS OF EACH STORY OF THE TOWERS ON | | EACH SIDE OF THE POOL DECK MEET THE 25 PERCENT | | REQUIREMENT. | | | | 20) THE LIFE SAFETY PLANS NEED TO SHOW THE FOLLOWING | | FOR EACH FLOOR: | | A) THE NUMBER OF OCCUPANTS IN EACH AREA FBC 1004.1 | | B) THE CUMULATIVE OCCUPANT LOADS FBC 1004.1.1 | | C) THE EXIT SEPARATION DISTANCE FBC 1015.2.1 | | D) THE COMMON PATH OF EGRESS TRAVEL DISTANCE FBC 1014.3 | | E) THE EXIT ACCESS TRAVEL DISTANCE FBC 1016.3 | | F) THE CLEAR WIDTH OF THE EXIT OR EXIT ACCESS DOORS FBC | | 1008.1.1 | | G) THE CAPACITY OF EGRESS DOORS, OCCUPANT LOAD SERVED | | AND MEANS OF EGRESS FACTOR FBC1005.3.2 | | H) THE DISTRIBUTION OF EGRESS CAPACITY FBC1005.5 | | | | 21) THE WINDOW SCHEDULE ON SHEET A-8.01 LISTS TWO | | DIFFERENT WINDOWS FOR MARK "D". CLARIFY. FBC 107.2.1 | | | | 22) THE LINEN CHUTE SECTION ON SHEET A-6.02 HAS THE | | TERMINATION ROOM AND THE ACCESS ROOMS LABELED AS | | GARBAGE ROOMS. PLEASE CORRECT. FBC 713.13.1 | | | | 23) ITEM #26 ON SHEET A-6.00 SPECIFIES 1 X 4 P.T. WOOD | | IN 2 HOUR FIRE RATED SHAFTS, WHICH ARE SHOWN IN THE | | SHAFT WALL SECTIONS ON SHEET A-6.02. WOOD IS NOT | | ALLOWED IN FIRE RATED SHAFT WALLS UNLESS IT IS PART OF | | THE LISTED ASSEMBLY. CORRECT. FBC 713.2 | | | | 24) PROVIDE ROOF DRAINAGE, ROOF DRAIN SIZING AND | | OVER-FLOW SCUPPER CALCULATIONS. FBC 1503.4 | | | | 25) THE PROJECT IS NOT LOCATED IN A SPECIAL FLOOD | | HAZARD AREA. THE ELEVATIONS ON THE DRAWINGS ARE GIVEN | | IN NGVD 29 DATUM. THE CITY OF WEST PALM BEACH ADOPTED | | NEW FLOOD MAPS ON OCTOBER 5, 2017. THESE NEW MAPS USE | | NAVD 88 AS THE VERTICAL DATUM. IN ORDER TO AVOID ANY | | CONFUSION WITH ELEVATIONS IT WOULD BE GOOD TO REPLACE | | THE ELEVATIONS ON THE PLANS WITH THE CURRENT VERTICLE | | DATUM, NAVD 88 OR TO PROVIDE BOTH THE NAVD AND THE NGVD | | ELEVATIONS ON THE PLANS. FBC 107.2.1 | | | | 26) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A | | RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE | | CITY RE-SUBMITTAL FORM. | | | | | | | | | 2019-03-27 08:10:51 | BUILDING PLAN REVIEW IN PROGRESS. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2020-01-03 |
|
|
Cont ID |
|
Sent By |
jpearson |
Date |
2020-01-03 |
Time |
09:44 |
Rev Time |
0.00 |
Received By |
jpearson |
Date |
2020-01-03 |
Time |
09:44 |
Sent To |
|
|
Notes |
2020-01-03 09:44:25 | CODES IN EFFECT: | | FBC = FLORIDA BUILDING CODE 2014 5TH EDITION | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2014 | | 5TH ED, CHAPTER 1. | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 | | 5TH EDITION | | NEC = NFPA 70 2011 EDITION, NATIONAL ELECTRICAL CODE | | FS = FLORIDA STATUTES | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | NO ELECTRICAL RESPONSE PROVIDED. NO NEW ELECTRICAL | | SUBMISSIONS FOR THIS REVIEW. ALL COMMENTS BELOW ARE | | FROM FIRST REVIEW. | | | | 1. LABELING OF MAINS IS NOT CONSISTENT THROUGHOUT PLAN. | | THERE APPEARS TO BE A SERVICE TO THE FIRE PUMP, WHICH | | SHOULD BE LABELED AS AN ADDITIONAL SERVICE. THERE | | APPEARS TO BE AN EMERGENCY SERVICE TO THE GENERATOR | | ROOM, BUT THIS IS NOT LABLED AS AN ADDITIONAL SERVICE | | AS REQUIRED. PANEL E IN THE MAIN ELECTRICAL ROOM IS NOT | | ONE OF THE MAINS FOR SERVICE #1, AS THIS PANEL IS FED | | FROM THE EMERGNECY SERVICE LOCATED IN THE GENERATOR | | ROOM. PROVIDE CORRECTIONS AS NEEDED FOR CLARTY. WPB FBC | | 107.2.1; NEC 230.2, 230.72(B) | | 2. PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FOR EACH | | PANEL INCLUDING INFORMATION FROM THE POWER COMPANY | | STATING WHAT THE AVAILABLE SHORT CIRCUIT CURRENT IS FOR | | THE SERVICE TO CONFIRM THE STATED AIC RATING OF THE | | SERVICE EQUIPMENT AND DOWNSTREAM PANELS IS ADEQUATE. | | NEC 110.9, 110.10 | | 3. PROVIDE NOTES TO INDICATE THE REQUIRED MARKING OF | | SERVICE EQUIPMENT FOR ARC FLASH HAZARD WARNING AND | | AVAILABLE FAULT CURRENT PER CODE. NEC 110.16, 110.24 | | 4. PROVIDE RECEPTACLE CONTROL REQUIRED BY ASHREA 90.1: | | 8.4.2. PER THIS REQUIREMENT, THE FOLLOWING SHALL BE | | AUTOMATICALLY CONTROLLED: 1) AT LEAST 50% OF ALL | | 125-VOLT, 15 AND 20 AMP RECEPTACLES, IN ALL PRIVATE | | OFFICES, CONFERENCE ROOMS, ROOMS USED PRIMARILY FOR | | PRINTING AND/OR COPYING FUNCTIONS, BREAK ROOMS, | | CLASSROOMS, AND INDIVIDUAL WORKSTATIONS. 2) AT LEASE | | 25% OF BRANCH CIRCUIT FEEDERS INSTALLED FOR MODULAR | | FURNITURE NOT SHOWN ON THE CONSTRUCTION DOCUMENTS. FBC | | EC 405.7.1 | | 5. PROVIDE THE ADDITIONAL LIGHTING CONTROLS STIPULATED | | IN THE FBC ENERGY CODE. MANY AREAS DO NOT SHOW THE | | AUTOMATIC CONTROL REQUIRED. FBC EC 405.2 | | 6. PROVIDE CHART OF INTERIOR LIGHTING POWER ALLOWANCES | | EXPRESSED IN WATTAGE PER THE FBC ENERGY CODE IN | | RELATION TO THE WATTAGE OF THE CONNECTED INTERIOR | | LIGHTING PROPOSED TO COMPLY WITH CODE. FBC EC 405.4.2 | | 7. PROVIDE VOLTAGE DROP CALCULATIONS AS REQUIRED TO | | MEET CODE. FBC EC C405.6.3 | | 8. PROVIDE BLOCK NOTE SHOWING COMPLIANCE FOR COMPLETION | | DOCUMENTS. FBC EC C405.6.4 | | 9. SHEET E-1.12 SHOWS THE ELECTRICAL ROOMS ON FLOORS 2 | | THROUGH 6 FOR THE "EXTENDED SUITES" HAVING A MAIN RATED | | AS 1000 AMP, WHILE THE RISER DIAGRAM SHOWS THESE MAINS | | AS 600 AMP. PROVIDE CLARIFICATION AND/OR CORRECTIONS. | | IF THE MAINS ARE 800 AMPS OR ABOVE, PROVIDE THE PROPER | | DOOR SWING AND HARDWARE PER NEC 110.26. ADDITIONALLY, | | IT APPEARS THAT THE DIAGRAM FOR THE 3RD AND 4TH FLOOR | | WAS REPEATED AND THERE IS NO DIAGRAM FOR FLOORS 5 AND | | 6. PROVIDE CORRECTIONS. WPB FBC 107.2.1 | | 10. NOTE ON RISER DIAGRAM SHOWS THE GENERATOR AS A | | SEPARATELY DERIVED SYSTEM. HOWEVER, THE ATS IS SHOWN AS | | A 3 POLE SWITCH, WHICH WOULD NOT BE A SEPARATELY | | DERIVED SYSTEM. PROVIDE CLARIFICATION AND CORRECTIONS | | AS NEEDED. WPB FBC 107.2.1; NEC 250.30 | | 11. THE ATS IS THE GENERATOR ROOM APPEARS TO BE AN | | ADDITIONAL SERVICE FOR EMERGNECY SYSTEMS, BUT IS NOT | | LABELED AS SUCH. PROVIDE CORRECTIONS TO LABELING AND | | GROUNDING OF THIS SERVICE PER CODE. NEC 230.2, 250.24, | | 250.28, 250.30, 250.32, 250.35, 250.50 | | 12. PLAN SUBMISSION INCLUDES TWO SHEETS MARKED E-1.09 | | AND THEY EACH HAVE DIFFERENT INFORMATION ON THEM. | | PROVIDE CORRECTION. WPB FBC 107.2.1 | | 13. PROVIDE EVIDENCE OF COMPLIANCE WITH NEC 240.87. | | 14. THERE ARE SEVERAL PANELS THAT HAVE THE SAME | | IDENTIFICATION THROUGHOUT THE SYSTEM. EACH PANEL SHOULD | | HAVE A DISTINCT IDENTIFICATION FOR CLARITY. PROVIDE | | CORRECTION AND PANEL SCHEDULES TO CORRESPOND. NEC | | 210.19, 215.2, 215.5, 408.4 | | 15. PROVIDE ACCURATE LOAD CALCULATION FOR EACH SERVICE | | AND THE CORRESPONDING MAINS TO MATCH THE INFORMATION | | PROVIDED ON THE RISER DIAGRAM. THERE ARE DISCREPANCIES | | FOR THE LABELING OF MAINS AND THE LOADS THEY FEED. NEC | | 220; WPB FBC 107.2.1 | | 16. LOAD CALCULATION PROVIDED FOR "EXTENDED SUITES" | | STATES THAT IT IS BASED ON NEC 220.32, WHICH DOES NOT | | EXIST. PROVIDE CLARIFICATION AND CORRECTIONS. WPB FBC | | 107.2.1 | | 17. RISER DIAGRAM SHOWS THE GENERATOR FEEDING A GUTTER | | THAT THEN FEEDS TWO DISCONNECTS, ONE FOR FIRE PUMP, AND | | ONE FOR ATS THAT FEEDS PANEL E. THE DESIGN AS SHOWN IN | | NOT CODE COMPLIANT, AS FIRE PUMP WIRING IS REQUIRED TO | | REMAIN INDEPENDENT OF ALL OTHER WIRING. PROVIDE | | CORRECTION. NEC 659.6(A)(2), 445.18 | | 18. IF AN ADDITIONAL DISCONNECT FOR FIRE PUMP IS TO BE | | INSTALLED AS PERMITTED IN NEC 695.4, THIS DISCONNECT | | MUST BE SUPERVISED PER ONE OF THE METHODS STIPULATED IN | | THE CODE. PROVIDE DETAIL ON PLAN FOR METHOD OF | | SUPERVISION. NEC 695.4(B)(3)(E) | | 19. BE ADVISED THAT FIRE ALARM, LOW VOLTAGE SYSTEMS, | | DAS, LIGHTNING PROTECTION, GENERATORS, COMMERCIAL HOOD | | SYSTEMS, SIGNS, SITE LIGHTING, AND SWIMMING POOLS | | (WHERE APPLICABLE) ARE NOT INCLUDED IN THE SCOPE OF | | THIS PLAN REVIEW. PROVIDE A BLOCK NOTE INDICATING THE | | REQUIRED SEPARATE PERMITS AND DATA SPECIFICATION SHEET | | SUBMITTALS FOR ANY OF THESE SYSTEMS PRESENT. WPB FBC | | 105.1, 107.2.1 | | 20. PROVIDE DETAILS OF EQIPMENT ENCLOSURES USED IN POOL | | ROOM FOR ANY ELECTRICAL EQUIPMENT. NEC TABLE 110.28 | | 21. VENDING MACHINES REQUIRE READILY ACCESSIBLE GFCI | | PROTECTION. PROVIDE CORRECTION. NEC 422.51 | | 22. SHEETS E.107, E.108, AND E.109, PROVIDE GFCI | | PROTECTION FOR ALL RECEPTACLES LOCATED IN BATHROOMS. | | NEC 210.8 | | 23. SHEETS CONTAINING DETAILS OF HOTEL ROOMS AND | | EXTENDED SUITES HAVE SEVERAL NOTES IN PARENTHESES THAT | | ARE NOT EXPLAINED OR DETAILED. PROVIDE CORRECTION. WPB | | FBC 107.2.1 | | | | END OF COMMENTS. | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY | | REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED | | SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD | | SHEETS. | | | | SINCERELY, | | | | JOHN PEARSON | | ELECTRICAL PLANS EXAMINER | | 561-805-6746 | | [email protected] | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2019-04-02 |
|
|
Cont ID |
|
Sent By |
jpearson |
Date |
2019-04-02 |
Time |
10:32 |
Rev Time |
0.00 |
Received By |
jpearson |
Date |
2019-03-18 |
Time |
12:31 |
Sent To |
|
|
Notes |
2019-03-18 12:30:34 | CODES IN EFFECT: | | FBC = FLORIDA BUILDING CODE 2014 5TH EDITION | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2014 | | 5TH ED, CHAPTER 1. | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 | | 5TH EDITION | | NEC = NFPA 70 2011 EDITION, NATIONAL ELECTRICAL CODE | | FS = FLORIDA STATUTES | | | | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | 1. LABELING OF MAINS IS NOT CONSISTENT THROUGHOUT PLAN. | | THERE APPEARS TO BE A SERVICE TO THE FIRE PUMP, WHICH | | SHOULD BE LABELED AS AN ADDITIONAL SERVICE. THERE | | APPEARS TO BE AN EMERGENCY SERVICE TO THE GENERATOR | | ROOM, BUT THIS IS NOT LABLED AS AN ADDITIONAL SERVICE | | AS REQUIRED. PANEL E IN THE MAIN ELECTRICAL ROOM IS NOT | | ONE OF THE MAINS FOR SERVICE #1, AS THIS PANEL IS FED | | FROM THE EMERGNECY SERVICE LOCATED IN THE GENERATOR | | ROOM. PROVIDE CORRECTIONS AS NEEDED FOR CLARTY. WPB FBC | | 107.2.1; NEC 230.2, 230.72(B) | | 2. PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FOR EACH | | PANEL INCLUDING INFORMATION FROM THE POWER COMPANY | | STATING WHAT THE AVAILABLE SHORT CIRCUIT CURRENT IS FOR | | THE SERVICE TO CONFIRM THE STATED AIC RATING OF THE | | SERVICE EQUIPMENT AND DOWNSTREAM PANELS IS ADEQUATE. | | NEC 110.9, 110.10 | | 3. PROVIDE NOTES TO INDICATE THE REQUIRED MARKING OF | | SERVICE EQUIPMENT FOR ARC FLASH HAZARD WARNING AND | | AVAILABLE FAULT CURRENT PER CODE. NEC 110.16, 110.24 | | 4. PROVIDE RECEPTACLE CONTROL REQUIRED BY ASHREA 90.1: | | 8.4.2. PER THIS REQUIREMENT, THE FOLLOWING SHALL BE | | AUTOMATICALLY CONTROLLED: 1) AT LEAST 50% OF ALL | | 125-VOLT, 15 AND 20 AMP RECEPTACLES, IN ALL PRIVATE | | OFFICES, CONFERENCE ROOMS, ROOMS USED PRIMARILY FOR | | PRINTING AND/OR COPYING FUNCTIONS, BREAK ROOMS, | | CLASSROOMS, AND INDIVIDUAL WORKSTATIONS. 2) AT LEASE | | 25% OF BRANCH CIRCUIT FEEDERS INSTALLED FOR MODULAR | | FURNITURE NOT SHOWN ON THE CONSTRUCTION DOCUMENTS. FBC | | EC 405.7.1 | | 5. PROVIDE THE ADDITIONAL LIGHTING CONTROLS STIPULATED | | IN THE FBC ENERGY CODE. MANY AREAS DO NOT SHOW THE | | AUTOMATIC CONTROL REQUIRED. FBC EC 405.2 | | 6. PROVIDE CHART OF INTERIOR LIGHTING POWER ALLOWANCES | | EXPRESSED IN WATTAGE PER THE FBC ENERGY CODE IN | | RELATION TO THE WATTAGE OF THE CONNECTED INTERIOR | | LIGHTING PROPOSED TO COMPLY WITH CODE. FBC EC 405.4.2 | | 7. PROVIDE VOLTAGE DROP CALCULATIONS AS REQUIRED TO | | MEET CODE. FBC EC C405.6.3 | | 8. PROVIDE BLOCK NOTE SHOWING COMPLIANCE FOR COMPLETION | | DOCUMENTS. FBC EC C405.6.4 | | 9. SHEET E-1.12 SHOWS THE ELECTRICAL ROOMS ON FLOORS 2 | | THROUGH 6 FOR THE "EXTENDED SUITES" HAVING A MAIN RATED | | AS 1000 AMP, WHILE THE RISER DIAGRAM SHOWS THESE MAINS | | AS 600 AMP. PROVIDE CLARIFICATION AND/OR CORRECTIONS. | | IF THE MAINS ARE 800 AMPS OR ABOVE, PROVIDE THE PROPER | | DOOR SWING AND HARDWARE PER NEC 110.26. ADDITIONALLY, | | IT APPEARS THAT THE DIAGRAM FOR THE 3RD AND 4TH FLOOR | | WAS REPEATED AND THERE IS NO DIAGRAM FOR FLOORS 5 AND | | 6. PROVIDE CORRECTIONS. WPB FBC 107.2.1 | | 10. NOTE ON RISER DIAGRAM SHOWS THE GENERATOR AS A | | SEPARATELY DERIVED SYSTEM. HOWEVER, THE ATS IS SHOWN AS | | A 3 POLE SWITCH, WHICH WOULD NOT BE A SEPARATELY | | DERIVED SYSTEM. PROVIDE CLARIFICATION AND CORRECTIONS | | AS NEEDED. WPB FBC 107.2.1; NEC 250.30 | | 11. THE ATS IS THE GENERATOR ROOM APPEARS TO BE AN | | ADDITIONAL SERVICE FOR EMERGNECY SYSTEMS, BUT IS NOT | | LABELED AS SUCH. PROVIDE CORRECTIONS TO LABELING AND | | GROUNDING OF THIS SERVICE PER CODE. NEC 230.2, 250.24, | | 250.28, 250.30, 250.32, 250.35, 250.50 | | 12. PLAN SUBMISSION INCLUDES TWO SHEETS MARKED E-1.09 | | AND THEY EACH HAVE DIFFERENT INFORMATION ON THEM. | | PROVIDE CORRECTION. WPB FBC 107.2.1 | | 13. PROVIDE EVIDENCE OF COMPLIANCE WITH NEC 240.87. | | 14. THERE ARE SEVERAL PANELS THAT HAVE THE SAME | | IDENTIFICATION THROUGHOUT THE SYSTEM. EACH PANEL SHOULD | | HAVE A DISTINCT IDENTIFICATION FOR CLARITY. PROVIDE | | CORRECTION AND PANEL SCHEDULES TO CORRESPOND. NEC | | 210.19, 215.2, 215.5, 408.4 | | 15. PROVIDE ACCURATE LOAD CALCULATION FOR EACH SERVICE | | AND THE CORRESPONDING MAINS TO MATCH THE INFORMATION | | PROVIDED ON THE RISER DIAGRAM. THERE ARE DISCREPANCIES | | FOR THE LABELING OF MAINS AND THE LOADS THEY FEED. NEC | | 220; WPB FBC 107.2.1 | | 16. LOAD CALCULATION PROVIDED FOR "EXTENDED SUITES" | | STATES THAT IT IS BASED ON NEC 220.32, WHICH DOES NOT | | EXIST. PROVIDE CLARIFICATION AND CORRECTIONS. WPB FBC | | 107.2.1 | | 17. RISER DIAGRAM SHOWS THE GENERATOR FEEDING A GUTTER | | THAT THEN FEEDS TWO DISCONNECTS, ONE FOR FIRE PUMP, AND | | ONE FOR ATS THAT FEEDS PANEL E. THE DESIGN AS SHOWN IN | | NOT CODE COMPLIANT, AS FIRE PUMP WIRING IS REQUIRED TO | | REMAIN INDEPENDENT OF ALL OTHER WIRING. PROVIDE | | CORRECTION. NEC 659.6(A)(2), 445.18 | | 18. IF AN ADDITIONAL DISCONNECT FOR FIRE PUMP IS TO BE | | INSTALLED AS PERMITTED IN NEC 695.4, THIS DISCONNECT | | MUST BE SUPERVISED PER ONE OF THE METHODS STIPULATED IN | | THE CODE. PROVIDE DETAIL ON PLAN FOR METHOD OF | | SUPERVISION. NEC 695.4(B)(3)(E) | | 19. BE ADVISED THAT FIRE ALARM, LOW VOLTAGE SYSTEMS, | | DAS, LIGHTNING PROTECTION, GENERATORS, COMMERCIAL HOOD | | SYSTEMS, SIGNS, SITE LIGHTING, AND SWIMMING POOLS | | (WHERE APPLICABLE) ARE NOT INCLUDED IN THE SCOPE OF | | THIS PLAN REVIEW. PROVIDE A BLOCK NOTE INDICATING THE | | REQUIRED SEPARATE PERMITS AND DATA SPECIFICATION SHEET | | SUBMITTALS FOR ANY OF THESE SYSTEMS PRESENT. WPB FBC | | 105.1, 107.2.1 | | 20. PROVIDE DETAILS OF EQIPMENT ENCLOSURES USED IN POOL | | ROOM FOR ANY ELECTRICAL EQUIPMENT. NEC TABLE 110.28 | | 21. VENDING MACHINES REQUIRE READILY ACCESSIBLE GFCI | | PROTECTION. PROVIDE CORRECTION. NEC 422.51 | | 22. SHEETS E.107, E.108, AND E.109, PROVIDE GFCI | | PROTECTION FOR ALL RECEPTACLES LOCATED IN BATHROOMS. | | NEC 210.8 | | 23. SHEETS CONTAINING DETAILS OF HOTEL ROOMS AND | | EXTENDED SUITES HAVE SEVERAL NOTES IN PARENTHESES THAT | | ARE NOT EXPLAINED OR DETAILED. PROVIDE CORRECTION. WPB | | FBC 107.2.1 | | | | END OF COMMENTS. | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY | | REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED | | SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD | | SHEETS. | | | | SINCERELY, | | | | JOHN PEARSON | | ELECTRICAL PLANS EXAMINER | | 561-805-6746 | | [email protected] | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
F |
Date |
2020-01-09 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2020-01-09 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2020-01-09 |
Time |
|
Sent To |
|
|
Notes |
2020-01-09 10:51:48 | PLEASE SUBMIT A FORMAL ENGINEERING SUBMITTAL TO | | ENGINEERING SERVICES FOR REVIEW. |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2019-03-22 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2019-03-22 |
Time |
15:46 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2019-03-22 |
Time |
15:46 |
Sent To |
|
|
Notes |
2019-03-22 15:46:47 | CONTACT ENGINEERING DEPARTMENT DIRECTLY AND SUBMIT | | APPLICATION IF REQUIRED | | HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS | | /FORMS,-PERMITS-APPLICATIONS | | | | ENGINEERING APPROVAL REQUIRED PRIOR TO PERMIT ISSUANCE | | | | MAIN PHONE: (561) 822-1200 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
F |
Date |
2020-01-13 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2020-01-13 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2019-12-13 |
Time |
16:39 |
Sent To |
|
|
Notes |
2020-01-13 12:54:42 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | 1) SHEET A 2.01, A 5.00 & FP 2.00 - THERE APPEARS TO BE | | AN OPEN RAILING ALONG THE MEZZANINE LEVEL CREATING AN | | ATRIUM WITH NO PROTECTION. | | | | PER NFPA 101, CH 8 | | | | 8.6.7* ATRIUMS. UNLESS PROHIBITED BY CHAPTERS 11 | | THROUGH 43, AN | | ATRIUM SHALL BE PERMITTED, PROVIDED THAT ALL OF THE | | FOLLOWING | | CONDITIONS ARE MET: | | | | (1) THE ATRIUM IS SEPARATED FROM THE ADJACENT SPACES BY | | FIRE | | BARRIERS WITH NOT LESS THAN A 1-HOUR FIRE RESISTANCE | | RATING, | | WITH OPENING PROTECTIVES FOR CORRIDOR WALLS, UNLESS ONE | | OF THE | | FOLLOWING IS MET: | | (A) THE REQUIREMENT OF 8.6.7(1) SHALL NOT APPLY TO | | EXISTING, | | PREVIOUSLY APPROVED ATRIUMS. | | (B) ANY NUMBER OF LEVELS OF THE BUILDING SHALL BE | | PERMITTED | | TO OPEN DIRECTLY TO THE ATRIUM WITHOUT ENCLOSURE, BASED | | ON THE RESULTS OF THE ENGINEERING ANALYSIS REQUIRED IN | | 8.6.7(5). | | (C)* GLASS WALLS AND INOPERABLE WINDOWS SHALL BE | | PERMITTED | | IN LIEU OF THE FIRE BARRIERS WHERE ALL THE FOLLOWING | | ARE | | MET: | | I. AUTOMATIC SPRINKLERS ARE SPACED ALONG BOTH SIDES | | OF THE GLASS WALL AND THE INOPERABLE WINDOWS AT | | INTERVALS NOT TO EXCEED 6 FT (1830 MM). | | II. THE AUTOMATIC SPRINKLERS SPECIFIED IN 8.6.7(C)I ARE | | LOCATED AT A DISTANCE FROM THE GLASS WALL NOT TO | | EXCEED 12 IN. (305 MM) AND ARRANGED SO THAT THE | | ENTIRE SURFACE OF THE GLASS IS WET UPON OPERATION OF | | THE SPRINKLERS. | | III. THE GLASS WALL IS OF TEMPERED, WIRED, OR LAMINATED | | GLASS HELD IN PLACE BY A GASKET SYSTEM THAT ALLOWS | | THE GLASS FRAMING SYSTEM TO DEFLECT WITHOUT | | BREAKING (LOADING) THE GLASS BEFORE THE SPRINKLERS | | OPERATE. | | IV. THE AUTOMATIC SPRINKLERS REQUIRED BY 8.6.7(C)I ARE | | NOT REQUIRED ON THE ATRIUM SIDE OF THE GLASS WALL | | AND THE INOPERABLE WINDOW WHERE THERE IS NO | | WALKWAY OR OTHER FLOOR AREA ON THE ATRIUM SIDE ABOVE | | THE MAIN FLOOR LEVEL. | | V. DOORS IN THE GLASS WALLS OF GLASS OR OTHER MATERILA | | THAT RESISTS PASSAGE OF SMOKE. | | VI. DOORS IN THE GLASS WALLS ARE SELF-CLOSING OR | | AUTOMATIC-CLOSING UPON DETECTION OF SMOKE. | | VII. THE GLASS IS CONTINUOUS VERTICALLY, WITHOUT | | HORIZONTAL MULLIONS, WINDOW TREATMENTS, OR OTHER | | OBSTRUCTIONS THAT WOULD INTERFERE WITH THE WETTING | | OF THE ENTIRE GLASS SURFACE. | | (2) ACCESS TO EXITS IS PERMITTED TO BE WITHIN THE | | ATRIUM, AND EXIT | | DISCHARGE IN ACCORDANCE WITH 7.7.2 IS PERMITTED TO BE | | WITHIN | | THE ATRIUM. | | (3) THE OCCUPANCY WITHIN THE ATRIUM MEETS THE | | SPECIFICATIONS FOR | | CLASSIFICATION AS LOW OR ORDINARY HAZARD CONTENTS. (SEE | | 6.2.2.) | | (4) THE ENTIRE BUILDING IS PROTECTED THROUGHOUT BY AN | | APPROVED, | | SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE | | WITH | | SECTION 9.7 | | (5) *FOR OTHER THAN EXISTING, PREVIOUSLY APPROVED | | ATRIUMS, AN | | ENGINEERING ANALYSIS IS PERFORMED THAT DEMONSTRATES | | THAT THE | | BUILDING IS DESIGNED TO KEEP THE SMOKE LAYER INTERFACE | | ABOVE THE | | HIGHEST UNPROTECTED OPENING TO ADJOINING SPACES, OR 6 | | FT (1830 | | MM) ABOVE THE HIGHEST FLOOR LEVEL OF EXIT ACCESS OPEN | | TO THE | | ATRIUM, FOR A PERIOD EQUAL TO 1.5 TIMES THE CALCULATED | | EGRESS TIME | | OR 20 MINUTES, WHICHEVER IS GREATER. | | (6) *FOR OTHER THAN EXISTING, PREVIOUSLY APPROVED SMOKE | | CONTROL | | SYSTEMS, WHERE AN ENGINEERED SMOKE CONTROL SYSTEM IS | | INSTALLED TO MEET THE REQUIREMENTS OF 8.6.7, THE SYSTEM | | IS | | INDEPENDENTLY ACTIVATED BY EACH OF THE FOLLOWING: | | (A) UPON ACTUATION OF THE REQUIRED AUTOMATIC SPRINKLER | | SYSTEM | | WITHIN THE ATRIUM OR AREAS OPEN TO THE ATRIUM | | (B) MANUAL CONTROLS THAT ARE READILY ACCESSIBLE TO THE | | FIRE | | DEPARTMENT | | | | PLEASE PROVIDE DETAILS IN COMPLIANCE WITH CODE. | | | | | | | | 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | ABOVE. | | | | | | | | 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2019-03-08 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2019-03-08 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2019-02-21 |
Time |
14:19 |
Sent To |
|
|
Notes |
2019-03-04 10:56:57 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | | | 1) SHEET A 2.01 - THERE IS AN INDICATION OF AN EMEGENCY | | GENERATOR. THE GENERATOR INSTALLATION SHALL BE UNDER | | SEPARATE SHOP DRAWINGS AND PERMIT. | | | | THE GENRATOR INSTALL SHALL ALSO COMPLY WITH THE | | REQUIRMENTS OF NFPA 110, TO INCLUDE TYPE | | | | PER NFPA 110 | | | | CHAPTER 4 CLASSIFICATION OF EMERGENCY POWER SUPPLY | | SYSTEMS (EPSSS) | | 4.1* GENERAL. THE EPSS SHALL PROVIDE A SOURCE OF | | ELECTRICAL | | POWER OF REQUIRED CAPACITY, RELIABILITY, AND QUALITY TO | | LOADS FOR | | A LENGTH OF TIME AS SPECIFIED IN TABLE 4.1(A) AND | | WITHIN A SPECIFIED | | TIME FOLLOWING LOSS OR FAILURE OF THE NORMAL POWER | | SUPPLY | | AS SPECIFIED IN TABLE 4.1(B). | | | | 4.2* CLASS. THE CLASS DEFINES THE MINIMUM TIME, IN | | HOURS, FOR | | WHICH THE EPSS IS DESIGNED TO OPERATE AT ITS RATED LOAD | | WITHOUT | | BEING REFUELED OR RECHARGED. [SEE TABLE 4.1(A).] | | 4.3 TYPE. THE TYPE DEFINES THE MAXIMUM TIME, IN | | SECONDS, | | THAT THE EPSS WILL PERMIT THE LOAD TERMINALS OF THE | | TRANSFER | | SWITCH TO BE WITHOUT ACCEPTABLE ELECTRICAL POWER. TABLE | | 4.1(B) | | PROVIDES THE TYPES DEFINED BY THIS STANDARD. | | 4.4* LEVEL. THIS STANDARD RECOGNIZES TWO LEVELS OF | | EQUIPMENT | | INSTALLATION, PERFORMANCE, AND MAINTENANCE. | | 4.4.1* LEVEL 1 SYSTEMS SHALL BE INSTALLED WHERE FAILURE | | OF THE | | EQUIPMENT TO PERFORM COULD RESULT IN LOSS OF HUMAN LIFE | | OR | | SERIOUS INJURIES. | | 4.4.2* LEVEL 2 SYSTEMS SHALL BE INSTALLED WHERE FAILURE | | OF THE | | EPSS TO PERFORM IS LESS CRITICAL TO HUMAN LIFE AND | | SAFETY. | | 4.4.3 ALL EQUIPMENT SHALL BE PERMANENTLY INSTALLED. | | 4.4.4* LEVEL 1 AND LEVEL 2 SYSTEMS SHALL ENSURE THAT | | ALL LOADS | | SERVED BY THE EPSS ARE SUPPLIED WITH ALTERNATE POWER | | THAT | | MEETS ALL THE FOLLOWING CRITERIA: | | (1) OF A QUALITY WITHIN THE OPERATING LIMITS OF THE | | LOAD | | (2) FOR A DURATION SPECIFIED FOR THE CLASS AS DEFINED | | IN TABLE | | 4.1(A) | | (3) WITHIN THE TIME SPECIFIED FOR THE TYPE AS DEFINED | | IN TABLE | | 4.1(B) | | | | PLEASE PROVIDE THE CLASSIFICATION, TYPE AND LEVEL ON | | THIS MASTER PLAN AND AN APPLICABLE NOTE FOR SHOP | | DRAWINGS. | | | | | | 1A) SHEET M1.0A - THERE ARE NO FIRE CODE REFERENCES FOR | | REVIEW OR COMPLIANCE. THE INSTALLATION SHALL COMPLY | | WITH NFPA 110, STANDARD FOR | | EMERGENCY AND STANDBY POWER SYSTEMS, 2013 EDITION | | | | PLEASE REVIEW AND ENSURE COMPLIANCE AND PROVIDE AN | | APPLICABLE NOTE ACKNOWLEDGMENT OF THE ABOVE CODE. | | | | | | | | | | | | 2) SHEET A 2.01 - THE VENTILATION/EXHAUST SYSTEMS ARE | | INDCATED WITH OPENINGS THAT MAY IN CONFLICT WITH THE | | REQUIREMENTS PER ABOVE. | | | | | | 7.7 HEATING, COOLING, AND VENTILATING. | | 7.7.1* WITH THE EPS RUNNING AT RATED LOAD, VENTILATION | | AIRFLOW | | SHALL BE PROVIDED TO LIMIT THE MAXIMUM AIR TEMPERATURE | | IN THE | | EPS ROOM OR THE ENCLOSURE HOUSING THE UNIT TO THE | | MAXIMUM | | AMBIENT AIR TEMPERATURE REQUIRED BY THE EPS | | MANUFACTURER. | | 7.7.1.1 CONSIDERATION SHALL BE GIVEN TO ALL THE HEAT | | EMITTED TO | | THE EPS EQUIPMENT ROOM BY THE ENERGY CONVERTER, | | UNINSULATED | | OR INSULATED EXHAUST PIPES, AND OTHER HEAT-PRODUCING | | EQUIPMENT. | | 7.7.2 AIR SHALL BE SUPPLIED TO THE EPS EQUIPMENT FOR | | COMBUSTION. | | 7.7.2.1* FOR EPS SUPPLYING LEVEL 1 EPSS, VENTILATION | | AIR SHALL | | BE SUPPLIED DIRECTLY FROM A SOURCE OUTSIDE THE BUILDING | | BY AN | | EXTERIOR WALL OPENING OR FROM A SOURCE OUTSIDE THE | | BUILDING BY | | A 2-HOUR FIRE-RATED AIR TRANSFER SYSTEM. | | 7.7.2.2 FOR EPS SUPPLYING LEVEL 1 EPSS, DISCHARGE AIR | | SHALL BE | | DIRECTED OUTSIDE THE BUILDING BY AN EXTERIOR WALL | | OPENING OR TO | | AN EXTERIOR OPENING BY A 2-HOUR FIRE-RATED AIR TRANSFER | | SYSTEM. | | 7.7.2.3 FIRE DAMPERS, SHUTTERS, OR OTHER SELF-CLOSING | | DEVICES SHALL | | NOT BE PERMITTED IN VENTILATION OPENINGS OR DUCTWORK | | FOR SUPPLY | | OR RETURN/DISCHARGE AIR TO EPS EQUIPMENT FOR LEVEL 1 | | EPSS. | | 7.7.3 VENTILATION AIR SUPPLY SHALL BE FROM OUTDOORS OR | | FROM A | | SOURCE OUTSIDE THE BUILDING BY AN EXTERIOR WALL OPENING | | OR | | FROM A SOURCE OUTSIDE THE BUILDING BY A 2-HOUR | | FIRE-RATED AIR | | TRANSFER SYSTEM. | | 7.7.4 VENTILATION AIR SHALL BE PROVIDED TO SUPPLY AND | | DISCHARGE | | COOLING AIR FOR RADIATOR COOLING OF THE EPS WHEN | | RUNNING | | AT RATED LOAD. | | 7.7.4.1 VENTILATION AIR SUPPLY AND DISCHARGE FOR | | RADIATORCOOLED | | EPS SHALL HAVE A MAXIMUM STATIC RESTRICTION OF 125 PA | | (0.5 IN. OF WATER COLUMN) IN THE DISCHARGE DUCT AT THE | | RADIATOR | | OUTLET. | | 7.7.4.2 RADIATOR AIR DISCHARGE SHALL BE DUCTED OUTDOORS | | OR TO | | AN EXTERIOR OPENING BY A 2-HOUR RATED AIR TRANSFER | | SYSTEM. | | 7.7.5 MOTOR-OPERATED DAMPERS, WHEN USED, SHALL BE | | SPRING | | OPERATED TO OPEN AND MOTOR CLOSED. FIRE DAMPERS, | | SHUTTERS, OR | | OTHER SELF-CLOSING DEVICES SHALL NOT BE PERMITTED IN | | VENTILATION | | OPENINGS OR DUCTWORK FOR SUPPLY OR RETURN/DISCHARGE AIR | | TO | | EPS EQUIPMENT FOR LEVEL 1 EPSS. | | | | PLEASE REVIEW AND ENSURE COMPLIANCE AND OR CORRECT AS | | APPLICABLE. | | | | | | | | 3) SHEET A 2.01 - THERE IS AN OVERHEAD DOOR INDICATED | | IN A 2 HOUR FIRE WALL AT THE STORAGE GARBAGGE ROOM. | | | | THERE IS NO FIRE RATING INDICATED ON THE DOOR SCHEDULE. | | | | ADDITIONALLY, WILL THIS DOOR BE ON A FUSIBLE LINK? | | | | PLEASE REVIEW AND CORRECT AND PROVIDE DETAILS. | | | | | | | | | | 4) SHEET A 2.01 - THE EXITING FROM THE GENERATOR ROOM | | INDICATES PASSAGE ALONG A 2 HOUR WALL; HOWEVER, THERE | | IS A LOUVER INDICATED AT THAT WALL AREA. | | | | THE PATH OF TRAVEL IS REQUIRED TO BE PROTECTED PER NFPA | | 101, CHAPTER 8 FEATURES OF FIRE PROTECTION | | | | 8.3.1.2* FIRE BARRIERS SHALL COMPLY WITH ONE OF THE | | FOLLOWING: | | (1) THE FIRE BARRIERS ARE CONTINUOUS FROM OUTSIDE WALL | | TO OUTSIDE WALL | | OR FROM ONE FIRE BARRIER TO ANOTHER, OR A COMBINATION | | THEREOF, | | INCLUDING CONTINUITY THROUGH ALL CONCEALED SPACES, SUCH | | AS THOSE | | FOUND ABOVE A CEILING, INCLUDING INTERSTITIAL SPACES. | | (2) THE FIRE BARRIERS ARE CONTINUOUS FROM OUTSIDE WALL | | TO OUTSIDE WALL | | OR FROM ONE FIRE BARRIER TO ANOTHER, AND FROM THE FLOOR | | TO THE | | BOTTOM OF THE INTERSTITIAL SPACE, PROVIDED THAT THE | | CONSTRUCTION | | ASSEMBLY FORMING THE BOTTOM OF THE INTERSTITIAL SPACE | | HAS A FIRE | | RESISTANCE RATING NOT LESS THAN THAT OF THE FIRE | | BARRIER. | | 8.3.1.3 WALLS USED AS FIRE BARRIERS SHALL COMPLY WITH | | CHAPTER 7 OF | | NFPA 221, STANDARD FOR HIGH CHALLENGE FIRE WALLS, FIRE | | WALLS, AND | | FIRE BARRIER WALLS. THE NFPA 221 LIMITATION ON | | PERCENTAGE WIDTH OF | | OPENINGS SHALL NOT APPLY. | | | | PLEASE REVIEW AND CORRECT OR JUSTIFY WITH SPECIFIC CODE | | REFERENCES AND NARRATIVE. | | | | | | | | 5) SHEET A 2.01 - THERE IS AN INDICATION OF A EXIT FROM | | THE GARAGE AREA PASSING BY A BOILER ROOM. | | | | 28.3.2 PROTECTION FROM HAZARDS. | | 28.3.2.1 GENERAL. ALL ROOMS CONTAINING HIGH-PRESSURE | | BOILERS, | | REFRIGERATING MACHINERY, TRANSFORMERS, OR OTHER SERVICE | | EQUIPMENT | | SUBJECT TO POSSIBLE EXPLOSION SHALL NOT BE LOCATED | | DIRECTLY UNDER OR | | DIRECTLY ADJACENT TO EXITS AND SHALL BE EFFECTIVELY CUT | | OFF FROM | | OTHER PARTS OF THE BUILDING AS SPECIFIED IN SECTION | | 8.7. | | | | PLEASE REVIEW AND CORRECT OR JUSTIFY WITH SPECIFIC CODE | | REFERENCES AND NARRATIVE | | | | | | | | 6) SHEET A 9.0 - THERE IS AN INDICATION OF A FP&L VAULT | | BOX DIRECTLY BESIDE AN EXIT FROM STAIRWAY, ST 1. | | | | 28.3.2 PROTECTION FROM HAZARDS. | | 28.3.2.1 GENERAL. ALL ROOMS CONTAINING HIGH-PRESSURE | | BOILERS, | | REFRIGERATING MACHINERY, TRANSFORMERS, OR OTHER SERVICE | | EQUIPMENT | | SUBJECT TO POSSIBLE EXPLOSION SHALL NOT BE LOCATED | | DIRECTLY UNDER OR | | DIRECTLY ADJACENT TO EXITS AND SHALL BE EFFECTIVELY CUT | | OFF FROM | | OTHER PARTS OF THE BUILDING AS SPECIFIED IN SECTION | | 8.7. | | | | PLEASE REVIEW AND CORRECT OR JUSTIFY WITH SPECIFIC CODE | | REFERENCES AND NARRATIVE | | | | | | | | | | 7) SHEET A 9.0 - THERE ARE DOORS THAT APPEAR TO OPEN | | AND ENCROACH MORE THAN ONE HALF THE REQUIRED EGRESS | | WIDTH; LUGGAGE ROOM, CONFERENCE SITTING AREA CORRIDOR | | (3), THE EXIT DOOR AT ST 4, | | | | PER NFPA 101, CH 7 MEANS OF EGRESS | | | | 7.2.1.4.3* DOOR LEAF ENCROACHMENT. | | 7.2.1.4.3.1 DURING ITS SWING, ANY DOOR LEAF IN A MEANS | | OF EGRESS | | SHALL LEAVE NOT LESS THAN ONE-HALF OF THE REQUIRED | | WIDTH OF AN AISLE, | | A CORRIDOR, A PASSAGEWAY, OR A LANDING UNOBSTRUCTED, | | UNLESS BOTH | | OF THE FOLLOWING CONDITIONS ARE MET: | | (1) THE DOOR OPENING PROVIDES ACCESS TO A STAIR IN AN | | EXISTING | | BUILDING. | | (2) THE DOOR OPENING MEETS THE REQUIREMENT OF | | 7.2.1.4.3.2. | | | | | | | | | | 8) SHEET A 2.01 & A 2.03 - THERE APPEARS TO BE STOVE | | TOPS INDICATED WITH THE KITCHENETTE AND BREAK ROOM. | | | | ANY KITCHEN EQUIPMENT WITHIN THESE ROOMS SHALL BE | | PROTECTED PER NFPA 101 & 96 WITH ALL APPLICABLE HOODS | | AND SUPPRESSION SYSTEMS UNDER SEPARATE SHOP DRAWINGS. | | | | PER NFPA 1 CH 50 & 101 CH 9: | | | | 50.1.1 THE DESIGN, INSTALLATION, OPERATION, INSPECTION | | AND MAINTENANCE OF ALL PUBLIC AND PRIVATE COMMERCIAL | | COOKING | | EQUIPMENT SHALL COMPLY WITH THIS CHAPTER AND NFPA 96, | | STANDARD | | FOR VENTILATION CONTROL AND FIRE PROTECTION OF | | COMMERCIAL COOKING OPERATIONS. | | | | 50.1.2 THIS CHAPTER SHALL APPLY TO RESIDENTIAL COOKING | | EQUIPMENT | | USED FOR COMMERCIAL COOKING OPERATIONS. [96:1.1.2] | | | | 50.2 GENERAL REQUIREMENTS. | | 50.2.1 GENERAL. | | 50.2.1.1 COOKING EQUIPMENT USED IN PROCESSES PRODUCING | | SMOKE | | OR GREASE-LADEN VAPORS SHALL BE EQUIPPED WITH AN | | EXHAUST SYSTEM | | THAT COMPLIES WITH ALL THE EQUIPMENT AND PERFORMANCE | | REQUIREMENTS OF THIS CHAPTER. [96:4.1.1] | | | | 9.2.3 COMMERCIAL COOKING OPERATIONS. WHERE REQUIRED BY | | ANOTHER | | SECTION OF THIS CODE, COMMERCIAL COOKING OPERATIONS | | SHALL BE PROTECTED | | IN ACCORDANCE WITH NFPA 96, STANDARD FOR VENTILATION | | CONTROL AND | | FIRE PROTECTION OF COMMERCIAL COOKING OPERATIONS, | | UNLESS SUCH | | INSTALLATIONS ARE APPROVED EXISTING INSTALLATIONS, | | WHICH SHALL BE | | PERMITTED TO BE CONTINUED IN SERVICE. | | | | PLEASE REVIEW AND CORRECT AND PROVIDE AN APPLICABLE | | NOTE OF ACKNOWLEDGEMENT. | | | | | | | | 9) SHEET A 2.01 - THERE ARE ELEVATORS INDICATED. | | | | PER NFPA 101 CH 28 - | | | | 28.5.3 ELEVATORS, ESCALATORS, AND CONVEYORS. | | 28.5.3.1 ELEVATORS, ESCALATORS, AND CONVEYORS SHALL | | COMPLY WITH | | THE PROVISIONS OF SECTION 9.4. | | 28.5.3.2* IN HIGH-RISE BUILDINGS, ONE ELEVATOR SHALL BE | | PROVIDED | | WITH A PROTECTED POWER SUPPLY AND SHALL BE AVAILABLE | | FOR USE BY | | THE FIRE DEPARTMENT IN CASE OF EMERGENCY. | | | | | | WHICH OF THE ELEVATORS MEET THE REQUIREMENTS? | | | | | | | | | | 10) SHEET 2.01 - THERE ARE ELEVATORS INDICATED. | | | | PER THE STATE OF FLORIDA CHAPTER 399 FLORIDA STATUTES. | | SECTION 399.15, SECTION 17: | | REGIONAL EMERGENCY ELEVATOR ACCESS ? | | (1) IN ORDER TO PROVIDE EMERGENCY ACCESS TO ELEVATORS: | | (A) FOR EACH BUILDING IN THIS STATE WHICH IS SIX OR | | MORE STORIES IN HEIGHT, INCLUDING, BUT NOT LIMITED TO, | | HOTELS AND CONDOMINIUMS, | | ON WHICH A BUILDING PERMIT IS ISSUED AFTER SEPTEMBER | | 30, 2006, ALL OF THE KEYS FOR ELEVATORS THAT ALLOW | | PUBLIC ACCESS, INCLUDING, | | BUT NOT LIMITED TO, SERVICE AND FREIGHT ELEVATORS, MUST | | BE KEYED SO AS TO ALLOW ALL ELEVATORS WITHIN EACH OF | | THE SEVEN STATE | | EMERGENCY RESPONSE REGIONS TO OPERATE IN FIRE EMERGENCY | | SITUATIONS WITH ONE MASTER ELEVATOR KEY. | | | | PLEASE REVIEW AND ENSURE COMPLIANCE AND PROVIDE AN | | APPLICABLE NOTE OF ACKNOWLEDGEMENT | | | | | | | | | | | | 11) SHEET FP 1.00 - THERE ARE INDICATIONS OF SIDEWALL | | SPRINKLER HEADS AT THE BOTTOM OF HOISTWAYS. | | | | PER NFPA 13 | | | | 8.15.5 ELEVATOR HOISTWAYS AND MACHINE ROOMS. | | | | 8.15.5.2 THE SPRINKLER REQUIRED AT THE BOTTOM OF THE | | ELEVATOR | | HOISTWAY BY 8.15.5.1 SHALL NOT BE REQUIRED FOR | | ENCLOSED, NONCOMBUSTIBLE | | ELEVATOR SHAFTS THAT DO NOT CONTAIN COMBUSTIBLE | | HYDRAULIC FLUIDS. | | | | PLEASE REVIEW AND CORRECT AND IF APPLICABLE THE | | SPRINKLER HEAD MAY BE REMOVED. | | | | | | | | 12) SHEET FP 1.00 - THERE DOES NOT APPEAR TO BE A | | SPRINKLER HEAD IN THE SERVICE SINK ROOM. | | | | PER NFPA 101 TOTAL FIRE SPRINKLER COVERAGE IS REQUIRED. | | | | 28.3.5 EXTINGUISHMENT REQUIREMENTS. | | 28.3.5.1 ALL BUILDINGS SHALL BE PROTECTED THROUGHOUT BY | | AN | | APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN | | ACCORDANCE | | WITH 28.3.5.3. | | | | PLEASE REVIEW AND CORRECT. | | | | | | | | | | 13) SHEET FP 2.00 - THERE DOES NOT APPEAR TO BE A | | SPRINKLER HEAD IN THE SERVICE SINK ROOM. | | | | PER NFPA 101 TOTAL FIRE SPRINKLER COVERAGE IS REQUIRED. | | | | 28.3.5 EXTINGUISHMENT REQUIREMENTS. | | 28.3.5.1 ALL BUILDINGS SHALL BE PROTECTED THROUGHOUT BY | | AN | | APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN | | ACCORDANCE | | WITH 28.3.5.3. | | | | PLEASE REVIEW AND CORRECT. | | | | | | | | | | 14) SHEET FP 3.00 - THERE DOES NOT APPEAR TO BE A | | SPRINKLER HEAD IN THE SERVICE SINK ROOM. | | | | PER NFPA 101 TOTAL FIRE SPRINKLER COVERAGE IS REQUIRED. | | | | 28.3.5 EXTINGUISHMENT REQUIREMENTS. | | 28.3.5.1 ALL BUILDINGS SHALL BE PROTECTED THROUGHOUT BY | | AN | | APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN | | ACCORDANCE | | WITH 28.3.5.3. | | | | PLEASE REVIEW AND CORRECT. | | | | | | | | 15) SHEET FP 4.00 - THERE IS A SPRINKLER HEAD NEAR ST 2 | | IN THE CORRIDOR AT THE CORRIDOR DOOR THAT APPEARS TO BE | | WITHIN THE WALL. | | | | ADDITIONALLY, THIS SHEET MAY BE INCORRECTLY LABLED AND | | NEED CORRECTION, SE BELOW. | | | | PLEASE REVIEW AND CORRECT THE LOCATION. | | | | | | | | | | 16) SHEET FP 5.00 - THIS SHEET IS INDICATED AS 4TH THRU | | 6TH FLOORS; HOWEVER, IT SHOWS THE ROOF. | | | | PLEASE REVIEW AND CORRECT. | | | | | | | | | | 17) SHEET FP 4.00 - THERE IS AN INDICATION OF A | | SPRINKLER HEAD AT THE TOP OF THE ELEVATOR HOISTWAYS. | | | | PER NFPA 13 | | | | 8.15.5.5* UPRIGHT, PENDENT, OR SIDEWALL SPRAY | | SPRINKLERS SHALL | | BE INSTALLED AT THE TOP OF ELEVATOR HOISTWAYS. | | 8.15.5.6 THE SPRINKLER REQUIRED AT THE TOP OF THE | | ELEVATOR HOISTWAY | | BY 8.15.5.5 SHALL NOT BE REQUIRED WHERE THE HOISTWAY | | FOR PASSENGER | | ELEVATORS IS NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE AND | | THE CAR ENCLOSURE MATERIALS MEET THE REQUIREMENTS OF | | ASME | | A17.1, SAFETY CODE FOR ELEVATORS AND ESCALATORS. | | | | PLEASE REVIEW AND REMOVE IF APPLICABLE. | | | | | | | | 18) SHEET FP 1.00 - THERE IS A INDICATION AT NOTE 1 | | THAT A SPRINKLER HEAD AT BENEATH OF STAIRWAY. | | | | PER NFPA 13 | | | | 8.15.3.2.3.1 SPRINKLERS SHALL BE PERMITTED TO BE | | OMITTED FROM | | THE BOTTOM OF THE STAIRWELL WHEN THE SPACE UNDER THE | | STAIRS AT | | THE BOTTOM IS BLOCKED OFF SO THAT STORAGE CANNOT OCCUR. | | | | PLEASE REVIEW AND CORRECT IF APPLICABLE AND PROVIDE FOR | | BLOCKING AREA. | | | | | | | | 19) SHEET FP 9.00 - THERE ARE INDICATIONS OF FIRE LINE | | UNDERGROUND. | | | | ALL FIRE LINE UNDERGROUND SHALL BE INSTALLED, TESTED | | AND INSPECTED UNDER SEPARATE SHOP DRAWINGS AND PERMIT. | | | | FIRE LINE UNDERGROUND SHALL BE INSTALLED, TESTED AND | | INSPECTED PER NFPA 24, | | | | PLEASE REVIEW AND PROVIDE AN APPLICABLE NOTE OF | | ACKNOWLEDGEMENT. | | | | | | | | | | 20) THERE DOES NOT APPEAR TO BE ANY CLEAR INFORMATION | | INDICATED FOR SMOKE CONTROL. | | | | PLEASE PROVIDE A DETAILED RATIONAL ANALYSIS INCL;UDING | | SEQUENCE OF OPERATION REGARDING SMOKE CONTROL FOR THIS | | PROJECT. | | | | | | | | | | 21) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | ABOVE. | | | | | | | | | | 22) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
F |
Date |
2020-01-08 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2020-01-08 |
Time |
17:03 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2020-01-08 |
Time |
17:03 |
Sent To |
|
|
Notes |
2020-01-08 17:03:31 | GAS 2ND REVIEW**DENIED*17121018*NO RESPONSE WAS | | PROVIDED IN REGARD TO THE GAS COMMENTS. A GAS PLAN HAS | | NOT BEEN INCLUDED IN THIS SUBMITTAL PACKAGE. A GAS PLAN | | REVIEW HAS NOT BEEN PERFORMED AT THIS TIME. A SEPARATE | | GAS PERMIT IS REQUIRED FOR A CONTRACTOR TO PERFORM THE | | RELATED WORK. PROVIDE COMPLETE PLANS THAT REFLECT THE | | ENTIRE SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC | | SEC.107.2.1. | | | | 1) GAS WATER HEATER IS LISTED AS 700K BTU BUT NOTE ON | | SHT. P11 SAYS NO GAS SYSTEMS FOR THIS PROJECT. PLEASE | | CLARIFY. WPB AMEND TO FBC 107.2.1 | | 2) IS THE GENERATOR, LINEN DRYER, OR ANY KITCHEN | | EQUIPMENT GAS. FBC 107.3.5 | | | | | | | | TIM HUNT | | PLUMBING PLAN REVIEW | | CITY OF WEST PALM BEACH (CGA SOLUTIONS) | | 561-248-2703 | | [email protected] | | | | | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2019-03-25 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2019-03-25 |
Time |
15:01 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2019-03-25 |
Time |
15:01 |
Sent To |
|
|
Notes |
2019-03-25 15:01:05 | GAS 1ST REVIEW**DENIED** | | | | A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL | | PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT | | THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BEIS | | REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK. | | PROVIDE COMPLETE PLANS AND GAS RISER THAT REFLECTS THE | | ENTIRE SCOPE OF GAS WORK TO BE DONE. AT THIS TIME. WPB | | AMEND. TO FBC SEC. 107.2.1. | | | | 1) WATER HEATER ARE LISTED AS 700,000 BTU GAS BUT NOTE | | ON SHT. -P11 SAYS NO GAS SYSTEM ON THIS PROJECT. PEASE | | CLEARIFY | | | | 2) IS THE GENERATOR, LINEN DRYER, OR ANY KITCHEN | | EQUIPMENT GAS? FBC 107.3.5 | | | | | | | | PLEASE EMAIL ME AND REQUEST A COMPLETE GAS CHECK LIST | | OF WHAT IS REQUIRED TO SUBMIT A GAS PLAN. | | | | | | TIM HUNT | | PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR | | CITY OF WEST PALM BEACH | | 561-248-2703 | | [email protected] | | | | | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2020-01-16 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-01-16 |
Time |
11:14 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2019-12-11 |
Time |
16:21 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2019-04-19 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2019-04-19 |
Time |
18:21 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2019-02-08 |
Time |
11:43 |
Sent To |
|
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2019-04-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2019-04-03 |
Time |
17:59 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2019-03-27 |
Time |
08:38 |
Sent To |
|
|
Notes |
2019-04-03 17:59:21 | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF UPON | | APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE RECEIPT TO | | YOUR PROJECT OR EMAIL IT TO [email protected] . |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2020-01-07 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2020-01-07 |
Time |
11:15 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2020-01-07 |
Time |
07:58 |
Sent To |
|
|
Notes |
2020-01-07 11:43:43 | 2ND REVIEW FBC-2014 MECHANICAL | | PERMIT #17121018 | | 410 N. ROSEMARY | | 1/7/2020 | | | | CODES IN EFFECT: | | FBC B- FLORIDA BUILDING CODE FIFTH EDITION 2014 | | FBC M- FLORIDA MECHANICAL CODE FIFTH EDITION 2014 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE FIFTH EDITION | | 2014 | | FBC FG- FLORIDA FUEL GAS CODE FIFTH EDITION 2014 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2014 | | | | PLAN REVIEW RESULTS: DENIED. | | | | THE 1ST REVIEW COMMENTS PRINTED BELOW WERE NOT | | ADDRESSED BY THE MECHANICAL ENGINEER OF RECORD AND NO | | CORRECTIONS OR REVISONS WERE MADE TO THE MECHANICAL | | PLANS. THE ARCHITECT OF RECORD HAS RESPONDED TO COMMENT | | #17- ITEMS A, B, F BUT NO CHANGES MADE TO THE | | MECHANICAL PLANS. | | PLEASE NOTE THESE NEW COMMENTS 1-3. | | | | 1) M.100: EXHAUST VENTILATION IS REQUIRED FOR THE | | LOADING/MANEUVERING ZONES IN ACCORDANCE WITH TABLE | | 403.3.1 AND SECTION 404.1 FBC M. THESE AREAS DO NOT | | MEET THE CRITERIA OF OPEN PARKING GARAGES AS OUTLINED | | IN SECTION 406.5 FBC B, AND ARE DESIGNED MORE LIKE | | ENCLOSED GARAGES WITH AN OPENING ON ONE SIDE. | | 2) M.800: PROVIDE A DUCT SMOKE DETECTOR SYMBOL (DS) IN | | THE SUPPLY DUCTS OF THE RTU'S- SECTION 606.2.1 FBC M. | | 3) M.10.00: VERIFY THE RTU'S ARE IN COMPLIANCE WITH | | SECTION C403.4.6 FBC EC. | | C403.4.6 HOT GAS BYPASS LIMITATION. COOLING SYSTEMS | | SHALL NOT USE HOT GAS BYPASS OR OTHER EVAPORATOR | | PRESSURE CONTROL SYSTEMS UNLESS THE SYSTEM IS DESIGNED | | WITH MULTIPLE STEPS OF UNLOADING OR CONTINUOUS CAPACITY | | MODULATION. THE CAPACITY OF THE HOT GAS BYPASS SHALL BE | | LIMITED AS INDICATED IN TABLE C403.4.6, AS LIMITED BY | | SECTION C403.3.1. | | TABLE C403.4.6 | | MAXIMUM HOT GAS BYPASS CAPACITY | | RATED CAPACITY MAXIMUM HOT GAS BYPASS CAPACITY (% OF | | TOTAL CAPACITY) | | ? 240,000 BTU/H 50 | | > 240,000 BTU/H 25 | | | | | | 1ST REVIEW FBC-2014 MECHANICAL | | PERMIT #17121018 | | 410 N. ROSEMARY | | 3/27/2019 | | | | CODES IN EFFECT: | | FBC B- FLORIDA BUILDING CODE FIFTH EDITION 2014 | | FBC M- FLORIDA MECHANICAL CODE FIFTH EDITION 2014 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE FIFTH EDITION | | 2014 | | FBC FG- FLORIDA FUEL GAS CODE FIFTH EDITION 2014 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2014 | | | | PLAN REVIEW RESULTS: DENIED. | | | | THE MECHANICAL PLANS HAVE FAILED FOR THE DEFICIENCIES | | AND OMISSIONS LISTED NUMERICALLY BELOW. PLEASE REVIEW | | ALL COMMENTS, INCLUDING THOSE LISTED FOR ADVISORY | | PURPOSES, AND RESUBMIT CORRECTED PLANS AND REQUIRED | | DOCUMENTS. WHEN RESUBMITTING, PLEASE PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | PRIOR TO MECHANICAL PERMIT ISSUANCE, THE GENERAL | | CONTRACTOR AND MECHANICAL SUB-CONTRACTOR FOR THE | | PROJECT ARE REQUESTED TO ATTEND A MEETING AT THE WPB | | BUILDING DEPARTMENT WITH THE STAFF- CHIEF MECHANICAL | | INSPECTOR, PLANS EXAMINER, AND OTHERS- TO DISCUSS | | TIMELINES AND GUIDELINES FOR INSPECTIONS AND THE | | DOCUMENT SUBMITTAL PROCESS . FURTHER INFORMATION WILL | | FOLLOW ONCE ALL PLANS ARE APPROVED. | | | | 1) SUBMIT AC COOLING AND HEATING CALCULATIONS- SECTION | | C403.2.1 FBC EC: DESIGN LOADS ASSOCIATED WITH HEATING, | | VENTILATING AND AIR CONDITIONING OF THE BUILDING SHALL | | BE DETERMINED IN ACCORDANCE WITH ANSI/ASHRAE/ACCA | | STANDARD 183 OR ACCA MANUAL N OR BY AN APPROVED | | EQUIVALENT COMPUTATIONAL PROCEDURE USING THE DESIGN | | PARAMETERS SPECIFIED IN CHAPTER 3. HEATING AND COOLING | | LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD REDUCTIONS | | THAT ARE ACHIEVED WHERE ENERGY RECOVERY SYSTEMS ARE | | UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE WITH THE | | ASHRAE HVAC SYSTEMS AND EQUIPMENT HAND-BOOK BY AN | | APPROVED EQUIVALENT COMPUTATIONAL PROCEDURE. DESIGN | | LOADS SHALL BE ATTACHED TO THE CODE COMPLIANCE FORM | | SUBMITTED TO THE BUILDING DEPARTMENT WHEN THE BUILDING | | IS PERMITTED OR, IN THE EVENT THE MECHANICAL PERMIT IS | | OBTAINED AT A LATER TIME, THE SIZING CALCULATION SHALL | | BE SUBMITTED WITH THE APPLICATION FOR THE MECHANICAL | | PERMIT. | | | | 2) SUBMIT AN ENERGY COMPLIANCE REPORT - SECTION C401.2 | | FBC EC. COMMERCIAL BUILDINGS SHALL COMPLY WITH ONE OF | | THE FOLLOWING: | | 1. THE REQUIREMENTS OF ANSI/ASHRAE/IESNA 90.1, | | EXCLUDING SECTION 9.4.1.1(G) OF THE STANDARD. | | 2. THE REQUIREMENTS OF SECTIONS C402 THROUGH C405. IN | | ADDITION, COMMERCIAL BUILDINGS SHALL COMPLY WITH | | SECTION C406 AND TENANT SPACES SHALL COMPLY WITH | | SECTION C406.1.1. | | 3. THE REQUIREMENTS OF SECTIONS C402.5, C403.2, C404, | | C405.2, C405.3, C405.5, C405.6 AND C407. THE BUILDING | | ENERGY COST SHALL BE EQUAL TO OR LESS THAN 85 PERCENT | | OF THE STANDARD REFERENCE DESIGN BUILDING. | | PLEASE REVIEW SECTION C101.5.1 FBC EC: THE FLORIDA | | BUILDING COMMISSION SHALL APPROVE SPECIFIC COMPUTER | | SOFTWARE. THE CODE OFFICIAL SHALL BE PERMITTED TO | | APPROVE WORKSHEETS, COMPLIANCE MANUALS AND OTHER | | SIMILAR MATERIALS THAT MEET THE INTENT OF THIS CODE. | | | | 3) COMMISSIONING OF THE MECHANICAL AND SERVICE WATER | | HEATING SYSTEMS IS REQUIRED PER SECTION 508.2 FBC EC. | | PLEASE SUBMIT A COMMISSIONING PLAN PER SECTION | | C408.2.1: | | A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED | | DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL | | ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE | | FOLLOWING ITEMS: | | 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL | | BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING, | | INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF | | THE ACTIVITIES. | | 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR | | SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO | | BE PERFORMED. | | 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED | | TO, CALIBRATIONS AND ECONOMIZER CONTROLS. | | 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED. | | TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN | | CONDITIONS AND FULL OUTSIDE AIR CONDITIONS. | | 5. MEASURABLE CRITERIA FOR PERFORMANCE' | | REFER TO SECTIONS C408.2.4, C408.2.5, AND C408.2.5.4 | | FOR PRELIMINARY AND FINAL REPORT REQUIREMENTS AND | | SUBMITTALS. PLEASE NOTE THAT A FINAL REPORT SHALL BE | | SUBMITTED TO THE BUILDING?S OWNERSHIP AND A COPY OF | | THAT REPORT SHALL BE SUBMITTED TO THE BUILDING OFFICIAL | | FOR FINAL MECHANICAL INSPECTION APPROVAL AND CO OF THE | | BUILDING. | | | | 4) DEFERRED SUBMITTALS: FOR THE PURPOSES OF THIS | | SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE | | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE | | TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO | | THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. | | DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR | | APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED | | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST | | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS | | FOR REVIEW BY THE BUILDING OFFICIAL. | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN | | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD | | THEM TO THE BUILDING OFFICIAL WITH A NOTATION | | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE | | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO | | THE DESIGN OF THE BUILDING. | | PLEASE REVIEW THE FOLLOWING LIST AND PROVIDE A LIST ON | | THE PLANS OR UPLOAD THE LIST IN DOCUMENT FORM. | | | | REQUIRED SUBMITTALS LISTED BELOW SHALL HAVE SHOP | | DRAWING STAMPS BY THE EOR AND BE IN THE FIELD AT TIME | | OF INSPECTION. | | A) FIRE DAMPERS AND FIRE/SMOKE DAMPERS. | | B) MOTORIZED AND BAROMETRIC DAMPERS | | C) DUCT SMOKE DETECTORS | | D) EXHAUST FANS | | E) LOUVERS FOR EXHAUST AND OUTSIDE AIR INTAKES | | INCLUDING MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT | | APPROVALS AND/OR MIAMI-DADE NOA'S | | F) AC STAND NOA?S OR FL. PRODUCT APPROVALS | | G) DUCT FIRE WRAPPING | | H) CLOTHES DRYERS INCLUDING THE VENTLESS DRYERS IN THE | | SUITES S. | | I) COOKING APPLIANCES AND EXHAUST HOODS IN THE COMMON | | AREAS AND THE SUITES. (RESTAURANT KITCHEN UNDER | | SEPARATE PERMIT, NOT INCLUDED).JI) BATHROOM AND LAUNDRY | | EXHAUST TERMINATION CAPS | | SUBMITTALS TO BE PROVIDED TO THE BUILDING DEPARTMENT | | FOR REVIEW. | | A) SIGNED AND SEALED STRUCTURAL ENGINEERING FOR | | INSTALLATION OF ALL EXTERIOR MECHANICAL EQUIPMENT AND | | APPLIANCES. ALTERNATELY, SIGNED AND SEALED, OR | | DELEGATED ENGINEERING MAY BE AVAILABLE ONSITE AT THE | | TIME OF INSPECTION. PLEASE NOTE THAT DELEGATED | | ENGINEERING SHALL BEAR THE SHOP DRAWING STAMP OF THE | | STRUCTURAL ENGINEER RECORD. | | B) GENERATORS AND FUEL TANKS AND ALL ASSOCIATED | | EQUIPMENT, VENT FLUES, AND FUEL OIL PIPING. | | C) BOILERS AND WATER HEATERS INCLUDING COMBUSTION AIR | | DUCTS AND VENT FLUES. | | D) COMMISSIONING REPORTS | | | | 5) ADVISORY: SEPARATE PERMITS ARE REQUIRED FOR KITCHEN | | EXHAUST HOODS, FIRE SUPPRESSION SYSTEMS, AND WALK-IN | | COOLERS AND FREEZERS. | | REGARDING THE KITCHEN EXHAUST, THE FOLLOWING CODE | | SECTIONS MAY IMPACT THE HVAC DESIGN FOR THE MAIN | | BUILDING. | | A) SECTION 508.1.2 FBC M AIR BALANCE: DESIGN PLANS FOR | | A FACILITY WITH A COMMERCIAL KITCHEN VENTILATION SYSTEM | | SHALL INCLUDE A SCHEDULE OR DIAGRAM INDICATING THE | | DESIGN OUTDOOR AIR BALANCE. THE DESIGN OUTDOOR AIR | | BALANCE SHALL INDICATE ALL EXHAUST AND REPLACEMENT AIR | | FOR THE FACILITY, PLUS THE NET EXFILTRATION IF | | APPLICABLE. THE TOTAL REPLACEMENT AIR AIRFLOW RATE | | SHALL EQUAL THE TOTAL EXHAUST AIRFLOW RATE PLUS THE NET | | EXFILTRATION. B) SECTION 508.1.1 MAKEUP AIR | | TEMPERATURE: THE TEMPERATURE DIFFERENTIAL BETWEEN | | MAKEUP AIR AND THE AIR IN THE CONDITIONED SPACE SHALL | | NOT EXCEED 10 DEGREES F (6 DEGREES C) EXCEPT WHERE THE | | ADDED HEATING AND COOLING LOADS OF THE MAKEUP AIR DO | | NOT EXCEED THE CAPACITY OF THE HVAC SYSTEM. | | C) SECTION 506.3.13: EXHAUST TERMINATION LOCATIONS AND | | CLEARANCE REQUIREMENTS ETC. | | | | 6) M1.00 & A1.04: THE O/A INTAKE FOR AHU-1 & 2 SHALL BE | | A MINIMUM 10' FROM THE PROPERTY LINE- SECTION 401.4 (1) | | FBC M. THE LOCATION IS NOT IN COMPLIANCE. | | | | 7) M1.00 & A.900: FIRE DAMPERS SHALL BE INSTALLED IN | | THE LOUVERED DOOR OPENINGS AT THE STORAGE, PUMP, FIRE | | PUMP, AND BOILER ROOMS- SECTION 607.5.2 FBC M. | | | | 8) M1.00 & A.900: FIRE DAMPERS MISSING FOR DUCTS | | PENETRATING THE FIRE-RATED WALLS AT THE LUGGAGE, FCC, | | AND MAIN MECHANICAL ROOM WALLS- SECTION 607.5.2 FBC M. | | | | 9) M1.00 & A.900: FIRE DAMPERS MISSING FOR DUCTS | | PENETRATING THE FIRE-RATED WALLS AT THE CONFERENCE | | ROOM- SECTION 607.5.2 FBC M. A) PLEASE INCLUDE THE FR | | DIFFUSERS IN THE SCHEDULE ON SHEET M10.00. | | | | 10) M1.00 & A.900: FIRE DAMPER MISSING FOR THE 20X14 | | DUCT PENETRATING THE FIRE-RATED BAR ROOM WALL- SECTION | | 607.5.2 FBC M. | | | | 11) M1.00: CU-1 AND CU-2 ARE OUTDOOR CONDENSING UNITS | | WHICH MUST BE INSTALLED IN ACCORDANCE WITH THEIR | | LISTING AND LABELING- SECTION 304.1 FBC M. | | | | 12) M1.00: DUCT SMOKE DETECTORS ARE REQUIRED IN THE | | RETURN AIR SYSTEMS OF AHU-1 & 2- SEE SECTION 606.2.1 | | FBC M. | | | | 13) M1.00: PLEASE PROVIDE AN EQUIPMENT SCHEDULE AND | | LAYOUT PLAN FOR THE KITCHENETTE- SEE SECTION 917 FBC M | | COOKING APPLIANCES. | | | | 14) M.100: EXHAUST VENTILATION IS REQUIRED FOR THE | | KITCHENETTE AT A RATE OF 25 CFMS CONTINUOUS OR 100 CFMS | | INTERMITTENT. CLARIFY IF AN EXHAUST HOOD WILL BE | | INSTALLED- SEE SECTION 506 FBC M. | | | | 15) M1.00, BOILER: A) A FULL REVIEW OF THE BOILER AND | | ROOM CANNOT BE PERFORMED WITHOUT MORE INFORMATION ABOUT | | THE BOILER INCLUDING AN EQUIPMENT SCHEDULE AND TYPE OF | | POWER- GAS OR ELECTRIC. PLEASE NOTE THAT GAS FIRED | | BOILERS REQUIRE GAS PIPING PLANS, AND COMBUSTION AIR | | AND VENTING PLANS AND CALCULATIONS- SECTIONS 304, 402 | | AND 503 FBC FG. | | | | 16) M1.00: PROVIDE A CONDENSATE DISPOSAL PLAN FOR THE | | AIR HANDLERS- SECTION 307.2.1 FBC M. | | | | 17) M1.00 & M1.0A- EMERGENCY GENERATOR: | | A) THE RADIATOR EXHAUST SHALL DISCHARGE DIRECTLY OR BE | | DUCTED TO THE OUTDOORS- SECTION 7.7.4.2 NFPA-110-2016. | | B) THE ENGINE EXHAUST PIPE SHALL DISCHARGE OUTSIDE OF | | THE STRUCTURE PER SECTIONS 8.2.3.1 NFPA 37-2015, AND | | SECTION 501.3 FBC M. | | C) EF-3 SHALL DISCHARGE TO THE OUTDOORS- SECTION 501.3 | | FBC M. A) INDICATE HOW THE FAN WAS SIZED- PROVIDE AN | | EXHAUST VENTILATION CALCULATION. | | D) EF-3 SHALL RUN CONTINUOUSLY AND NOT BE CONTROLLED BY | | THE THERMOSTAT- SECTIONS 4.1.2.1.3 & 6.3.6.5.1 NFPA 37, | | AND SECTION 502.4.2 FBC M. | | E) REFER TO SECTION 7.7.1 NFPA 110- 2016 AND VERIFY | | THAT THE VENTILATION AIRFLOW IN THE GENERATOR/TANK | | (EPS) ROOM IS DESIGNED TO LIMIT THE MAXIMUM AIR | | TEMPERATURE IN THE ROOM TO THE MAXIMUM AMBIENT AIR | | TEMPERATURE REQUIRED BY THE GENERATOR MANUFACTURER. | | CONSIDERATION SHALL BE GIVEN TO ALL THE HEAT EMITTED TO | | THE ROOM BY THE ENERGY CONVERTER, EXHAUST PIPES, AND | | ALL OTHER HEAT PRODUCING EQUIPMENT- SECTION 7.7.1.1. | | DESIGN OF THE HEATING, COOLING, AND VENTILATION SYSTEM | | SHALL AMONG OTHER THINGS, INCLUDE PROVISIONS FOR | | FACTORS SUCH AS HEAT, COLD, HUMIDITY, LOUVERS, ETC.- | | SECTION 7.7.7. | | F) THE LOUVERED AIR INTAKE OPENING INTO THE PARKING | | GARAGE IS PROHIBITED PER SECTION 7.7.3 NFPA 110 WHICH | | REQUIRES VENTILATION AIR TO BE TAKEN FROM THE OUTDOORS. | | IN ADDITION PLEASE NOT THAT A FIRE DAMPER WOULD BE | | REQUIRED IN THE LOUVERED OPENING, HOWEVER DAMPERS ARE | | NOT PERMITTED IN VENTILATION OPENINGS INTO THE ROOM- | | SECTION 7.7.2.3 NFPA 110. | | G) VERIFY THAT THE GENERATOR IS CLASSIFIED AS A LEVEL 1 | | PER SECTION 4.4 NFPA 110, AND PROVIDE THE UL 2200 | | CERTIFICATE OF COMPLIANCE- SECTION 915.1 FBC M. | | H) PLEASE PROVIDE A CLEARER COPY OF THE FUEL TANK | | DIAGRAM AND SPECIFICATIONS- SECTION 107.2.1 WPB. | | | | 18) M2.00: THE O/A INTAKES FOR AHU-6 & 7, AND THE | | LAUNDRY ROOM MAKEUP AIR SHALL BE A MINIMUM 10' FROM THE | | PROPERTY LINE- SECTION 401.4 (1) FBC M. THE LOCATIONS | | ARE NOT IN COMPLIANCE. | | | | 19) M2.00: THE EXHAUST OUTLET FOR THE POOL EXHAUST | | SYSTEM SHALL BE A MINIMUM 10' FROM THE PROPERTY LINE- | | SECTION 501.3.1 (2) FBC M. THE LOCATION IS NOT IN | | COMPLIANCE. | | | | 20) M2.00: VERIFY THE BOTTOM OF SF-1 IS A MINIMUM 8' | | ABOVE THE FINISHED GARAGE FLOOR- SECTION 394.6 FBC M. | | | | 21) M2.00: FIRE DAMPER MISSING AT THE 20X20 DUCT | | PENETRATION FROM AHU-6 THROUGH THE FIRE-RATED MECH | | RM/GARAGE WALL. | | | | 22) M2.00: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE | | DRYERS - SECTION 504.6.2 | | | | 23) M2.00: VERIFY THE DRYER EXHAUST FAN WILL RUN | | CONTINUOUSLY OR BE INTERLOCKED TO OPERATE WHEN ANY OF | | THE TWO UNITS ARE OPERATING. A) VERIFY THE MOTOR FOR | | THE FAN IS LOCATED OUTSIDE OF THE AIRSTREAM. | | | | 24) M2.00: PROVIDE EQUIPMENT SCHEDULES AND SUBMIT | | MANUFACTURER'S SPECIFICATIONS FOR THE BREAKROOM COOKING | | APPLIANCE AND RECIRCULATING HOOD- SECTIONS 505, 506, | | AND 917.1 FBC M. | | | | 25) M2.00: FIRE DAMPER SHALL BE INSTALLED IN THE | | LOUVERED DOOR OPENINGS AT THE POOL EQUIPMENT ROOM - | | SECTION 607.5.2 FBC M. | | | | 26) M2.00: A VESTIBULE WILL BE REQUIRED FOR THE POOL | | EQUIPMENT ROOM IF THE ROOM CONTAINS A FUEL-FIRED POOL | | HEATER- SECTION 305.3.2 FBC FG. | | | | 25) M3.00, M4.00, M6.00, M.700, M9.00, AND M10.00: | | INDICATE HOW O/A IS BEING PROVIDED TO THE HOTEL ROOMS | | AND PROVIDE CALCULATIONS- SECTION 401.2 FBC M. NOTE #5 | | REFERENCES RTU-1 FOR O/A CALCULATIONS FOR THE ROOMS BUT | | NO CALCS ARE PROVIDED. | | | | 26) M9.00: PLEASE INCLUDE THE CORRIDORS IN THE | | VENTILATION CALCULATIONS- TABLE 403.3.1.1. FBC M. | | | | 27) M13.00: NOA #13-1017.09 IS OUTDATED. PLEASE PROVIDE | | AN UPDATED COPY. PLEASE NOTE THIS MAY BE A DEFERRED | | SUBMITTAL PER COMMENT #4. | | | | 28) M13.00: CLEARANCES UNDER THE CONDENSING UNITS SHALL | | BE IN ACCORDANCE WITH TABLE 1509.6.5 FBC B. PLEASE | | PLACE A NOTE ON THE DETAIL. | | | | 29) PROVIDE A COMPLETE CONDENSATE DISPOSAL PLAN FOR ALL | | THE AIR HANDLERS- SECTION 307.2.1 FBC M. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE | | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND | | KEEP THEM WITH THE SUBMITTALS | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2019-03-28 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2019-03-28 |
Time |
08:53 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2019-03-27 |
Time |
08:17 |
Sent To |
|
|
Notes |
2019-03-28 08:54:17 | 1ST REVIEW FBC-2014 MECHANICAL | | PERMIT #17121018 | | 410 N. ROSEMARY | | 3/27/2019 | | | | CODES IN EFFECT: | | FBC B- FLORIDA BUILDING CODE FIFTH EDITION 2014 | | FBC M- FLORIDA MECHANICAL CODE FIFTH EDITION 2014 | | FBC EC- FLORIDA ENERGY CONSERVATION CODE FIFTH EDITION | | 2014 | | FBC FG- FLORIDA FUEL GAS CODE FIFTH EDITION 2014 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH | | EDITION 2014 | | | | PLAN REVIEW RESULTS: DENIED. | | | | THE MECHANICAL PLANS HAVE FAILED FOR THE DEFICIENCIES | | AND OMISSIONS LISTED NUMERICALLY BELOW. PLEASE REVIEW | | ALL COMMENTS, INCLUDING THOSE LISTED FOR ADVISORY | | PURPOSES, AND RESUBMIT CORRECTED PLANS AND REQUIRED | | DOCUMENTS. WHEN RESUBMITTING, PLEASE PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | PRIOR TO MECHANICAL PERMIT ISSUANCE, THE GENERAL | | CONTRACTOR AND MECHANICAL SUB-CONTRACTOR FOR THE | | PROJECT ARE REQUESTED TO ATTEND A MEETING AT THE WPB | | BUILDING DEPARTMENT WITH THE STAFF- CHIEF MECHANICAL | | INSPECTOR, PLANS EXAMINER, AND OTHERS- TO DISCUSS | | TIMELINES AND GUIDELINES FOR INSPECTIONS AND THE | | DOCUMENT SUBMITTAL PROCESS . FURTHER INFORMATION WILL | | FOLLOW ONCE ALL PLANS ARE APPROVED. | | | | 1) SUBMIT AC COOLING AND HEATING CALCULATIONS- SECTION | | C403.2.1 FBC EC: DESIGN LOADS ASSOCIATED WITH HEATING, | | VENTILATING AND AIR CONDITIONING OF THE BUILDING SHALL | | BE DETERMINED IN ACCORDANCE WITH ANSI/ASHRAE/ACCA | | STANDARD 183 OR ACCA MANUAL N OR BY AN APPROVED | | EQUIVALENT COMPUTATIONAL PROCEDURE USING THE DESIGN | | PARAMETERS SPECIFIED IN CHAPTER 3. HEATING AND COOLING | | LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD REDUCTIONS | | THAT ARE ACHIEVED WHERE ENERGY RECOVERY SYSTEMS ARE | | UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE WITH THE | | ASHRAE HVAC SYSTEMS AND EQUIPMENT HAND-BOOK BY AN | | APPROVED EQUIVALENT COMPUTATIONAL PROCEDURE. DESIGN | | LOADS SHALL BE ATTACHED TO THE CODE COMPLIANCE FORM | | SUBMITTED TO THE BUILDING DEPARTMENT WHEN THE BUILDING | | IS PERMITTED OR, IN THE EVENT THE MECHANICAL PERMIT IS | | OBTAINED AT A LATER TIME, THE SIZING CALCULATION SHALL | | BE SUBMITTED WITH THE APPLICATION FOR THE MECHANICAL | | PERMIT. | | | | 2) SUBMIT AN ENERGY COMPLIANCE REPORT - SECTION C401.2 | | FBC EC. COMMERCIAL BUILDINGS SHALL COMPLY WITH ONE OF | | THE FOLLOWING: | | 1. THE REQUIREMENTS OF ANSI/ASHRAE/IESNA 90.1, | | EXCLUDING SECTION 9.4.1.1(G) OF THE STANDARD. | | 2. THE REQUIREMENTS OF SECTIONS C402 THROUGH C405. IN | | ADDITION, COMMERCIAL BUILDINGS SHALL COMPLY WITH | | SECTION C406 AND TENANT SPACES SHALL COMPLY WITH | | SECTION C406.1.1. | | 3. THE REQUIREMENTS OF SECTIONS C402.5, C403.2, C404, | | C405.2, C405.3, C405.5, C405.6 AND C407. THE BUILDING | | ENERGY COST SHALL BE EQUAL TO OR LESS THAN 85 PERCENT | | OF THE STANDARD REFERENCE DESIGN BUILDING. | | PLEASE REVIEW SECTION C101.5.1 FBC EC: THE FLORIDA | | BUILDING COMMISSION SHALL APPROVE SPECIFIC COMPUTER | | SOFTWARE. THE CODE OFFICIAL SHALL BE PERMITTED TO | | APPROVE WORKSHEETS, COMPLIANCE MANUALS AND OTHER | | SIMILAR MATERIALS THAT MEET THE INTENT OF THIS CODE. | | | | 3) COMMISSIONING OF THE MECHANICAL AND SERVICE WATER | | HEATING SYSTEMS IS REQUIRED PER SECTION 508.2 FBC EC. | | PLEASE SUBMIT A COMMISSIONING PLAN PER SECTION | | C408.2.1: | | A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED | | DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL | | ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE | | FOLLOWING ITEMS: | | 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL | | BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING, | | INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF | | THE ACTIVITIES. | | 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR | | SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO | | BE PERFORMED. | | 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED | | TO, CALIBRATIONS AND ECONOMIZER CONTROLS. | | 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED. | | TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN | | CONDITIONS AND FULL OUTSIDE AIR CONDITIONS. | | 5. MEASURABLE CRITERIA FOR PERFORMANCE' | | REFER TO SECTIONS C408.2.4, C408.2.5, AND C408.2.5.4 | | FOR PRELIMINARY AND FINAL REPORT REQUIREMENTS AND | | SUBMITTALS. PLEASE NOTE THAT A FINAL REPORT SHALL BE | | SUBMITTED TO THE BUILDING?S OWNERSHIP AND A COPY OF | | THAT REPORT SHALL BE SUBMITTED TO THE BUILDING OFFICIAL | | FOR FINAL MECHANICAL INSPECTION APPROVAL AND CO OF THE | | BUILDING. | | | | 4) DEFERRED SUBMITTALS: FOR THE PURPOSES OF THIS | | SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE | | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE | | TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO | | THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. | | DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR | | APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED | | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST | | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS | | FOR REVIEW BY THE BUILDING OFFICIAL. | | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE | | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN | | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD | | THEM TO THE BUILDING OFFICIAL WITH A NOTATION | | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE | | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO | | THE DESIGN OF THE BUILDING. | | PLEASE REVIEW THE FOLLOWING LIST AND PROVIDE A LIST ON | | THE PLANS OR UPLOAD THE LIST IN DOCUMENT FORM. | | | | REQUIRED SUBMITTALS LISTED BELOW SHALL HAVE SHOP | | DRAWING STAMPS BY THE EOR AND BE IN THE FIELD AT TIME | | OF INSPECTION. | | A) FIRE DAMPERS AND FIRE/SMOKE DAMPERS. | | B) MOTORIZED AND BAROMETRIC DAMPERS | | C) DUCT SMOKE DETECTORS | | D) EXHAUST FANS | | E) LOUVERS FOR EXHAUST AND OUTSIDE AIR INTAKES | | INCLUDING MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT | | APPROVALS AND/OR MIAMI-DADE NOA'S | | F) AC STAND NOA?S OR FL. PRODUCT APPROVALS | | G) DUCT FIRE WRAPPING | | H) CLOTHES DRYERS INCLUDING THE VENTLESS DRYERS IN THE | | SUITES S. | | I) COOKING APPLIANCES AND EXHAUST HOODS IN THE COMMON | | AREAS AND THE SUITES. (RESTAURANT KITCHEN UNDER | | SEPARATE PERMIT, NOT INCLUDED).JI) BATHROOM AND LAUNDRY | | EXHAUST TERMINATION CAPS | | SUBMITTALS TO BE PROVIDED TO THE BUILDING DEPARTMENT | | FOR REVIEW. | | A) SIGNED AND SEALED STRUCTURAL ENGINEERING FOR | | INSTALLATION OF ALL EXTERIOR MECHANICAL EQUIPMENT AND | | APPLIANCES. ALTERNATELY, SIGNED AND SEALED, OR | | DELEGATED ENGINEERING MAY BE AVAILABLE ONSITE AT THE | | TIME OF INSPECTION. PLEASE NOTE THAT DELEGATED | | ENGINEERING SHALL BEAR THE SHOP DRAWING STAMP OF THE | | STRUCTURAL ENGINEER RECORD. | | B) GENERATORS AND FUEL TANKS AND ALL ASSOCIATED | | EQUIPMENT, VENT FLUES, AND FUEL OIL PIPING. | | C) BOILERS AND WATER HEATERS INCLUDING COMBUSTION AIR | | DUCTS AND VENT FLUES. | | D) COMMISSIONING REPORTS | | | | 5) ADVISORY: SEPARATE PERMITS ARE REQUIRED FOR KITCHEN | | EXHAUST HOODS, FIRE SUPPRESSION SYSTEMS, AND WALK-IN | | COOLERS AND FREEZERS. | | REGARDING THE KITCHEN EXHAUST, THE FOLLOWING CODE | | SECTIONS MAY IMPACT THE HVAC DESIGN FOR THE MAIN | | BUILDING. | | A) SECTION 508.1.2 FBC M AIR BALANCE: DESIGN PLANS FOR | | A FACILITY WITH A COMMERCIAL KITCHEN VENTILATION SYSTEM | | SHALL INCLUDE A SCHEDULE OR DIAGRAM INDICATING THE | | DESIGN OUTDOOR AIR BALANCE. THE DESIGN OUTDOOR AIR | | BALANCE SHALL INDICATE ALL EXHAUST AND REPLACEMENT AIR | | FOR THE FACILITY, PLUS THE NET EXFILTRATION IF | | APPLICABLE. THE TOTAL REPLACEMENT AIR AIRFLOW RATE | | SHALL EQUAL THE TOTAL EXHAUST AIRFLOW RATE PLUS THE NET | | EXFILTRATION. B) SECTION 508.1.1 MAKEUP AIR | | TEMPERATURE: THE TEMPERATURE DIFFERENTIAL BETWEEN | | MAKEUP AIR AND THE AIR IN THE CONDITIONED SPACE SHALL | | NOT EXCEED 10 DEGREES F (6 DEGREES C) EXCEPT WHERE THE | | ADDED HEATING AND COOLING LOADS OF THE MAKEUP AIR DO | | NOT EXCEED THE CAPACITY OF THE HVAC SYSTEM. | | C) SECTION 506.3.13: EXHAUST TERMINATION LOCATIONS AND | | CLEARANCE REQUIREMENTS ETC. | | | | 6) M1.00 & A1.04: THE O/A INTAKE FOR AHU-1 & 2 SHALL BE | | A MINIMUM 10' FROM THE PROPERTY LINE- SECTION 401.4 (1) | | FBC M. THE LOCATION IS NOT IN COMPLIANCE. | | | | 7) M1.00 & A.900: FIRE DAMPERS SHALL BE INSTALLED IN | | THE LOUVERED DOOR OPENINGS AT THE STORAGE, PUMP, FIRE | | PUMP, AND BOILER ROOMS- SECTION 607.5.2 FBC M. | | | | 8) M1.00 & A.900: FIRE DAMPERS MISSING FOR DUCTS | | PENETRATING THE FIRE-RATED WALLS AT THE LUGGAGE, FCC, | | AND MAIN MECHANICAL ROOM WALLS- SECTION 607.5.2 FBC M. | | | | 9) M1.00 & A.900: FIRE DAMPERS MISSING FOR DUCTS | | PENETRATING THE FIRE-RATED WALLS AT THE CONFERENCE | | ROOM- SECTION 607.5.2 FBC M. A) PLEASE INCLUDE THE FR | | DIFFUSERS IN THE SCHEDULE ON SHEET M10.00. | | | | 10) M1.00 & A.900: FIRE DAMPER MISSING FOR THE 20X14 | | DUCT PENETRATING THE FIRE-RATED BAR ROOM WALL- SECTION | | 607.5.2 FBC M. | | | | 11) M1.00: CU-1 AND CU-2 ARE OUTDOOR CONDENSING UNITS | | WHICH MUST BE INSTALLED IN ACCORDANCE WITH THEIR | | LISTING AND LABELING- SECTION 304.1 FBC M. | | | | 12) M1.00: DUCT SMOKE DETECTORS ARE REQUIRED IN THE | | RETURN AIR SYSTEMS OF AHU-1 & 2- SEE SECTION 606.2.1 | | FBC M. | | | | 13) M1.00: PLEASE PROVIDE AN EQUIPMENT SCHEDULE AND | | LAYOUT PLAN FOR THE KITCHENETTE- SEE SECTION 917 FBC M | | COOKING APPLIANCES. | | | | 14) M.100: EXHAUST VENTILATION IS REQUIRED FOR THE | | KITCHENETTE AT A RATE OF 25 CFMS CONTINUOUS OR 100 CFMS | | INTERMITTENT. CLARIFY IF AN EXHAUST HOOD WILL BE | | INSTALLED- SEE SECTION 506 FBC M. | | | | 15) M1.00, BOILER: A) A FULL REVIEW OF THE BOILER AND | | ROOM CANNOT BE PERFORMED WITHOUT MORE INFORMATION ABOUT | | THE BOILER INCLUDING AN EQUIPMENT SCHEDULE AND TYPE OF | | POWER- GAS OR ELECTRIC. PLEASE NOTE THAT GAS FIRED | | BOILERS REQUIRE GAS PIPING PLANS, AND COMBUSTION AIR | | AND VENTING PLANS AND CALCULATIONS- SECTIONS 304, 402 | | AND 503 FBC FG. | | | | 16) M1.00: PROVIDE A CONDENSATE DISPOSAL PLAN FOR THE | | AIR HANDLERS- SECTION 307.2.1 FBC M. | | | | 17) M1.00 & M1.0A- EMERGENCY GENERATOR: | | A) THE RADIATOR EXHAUST SHALL DISCHARGE DIRECTLY OR BE | | DUCTED TO THE OUTDOORS- SECTION 7.7.4.2 NFPA-110-2016. | | B) THE ENGINE EXHAUST PIPE SHALL DISCHARGE OUTSIDE OF | | THE STRUCTURE PER SECTIONS 8.2.3.1 NFPA 37-2015, AND | | SECTION 501.3 FBC M. | | C) EF-3 SHALL DISCHARGE TO THE OUTDOORS- SECTION 501.3 | | FBC M. A) INDICATE HOW THE FAN WAS SIZED- PROVIDE AN | | EXHAUST VENTILATION CALCULATION. | | D) EF-3 SHALL RUN CONTINUOUSLY AND NOT BE CONTROLLED BY | | THE THERMOSTAT- SECTIONS 4.1.2.1.3 & 6.3.6.5.1 NFPA 37, | | AND SECTION 502.4.2 FBC M. | | E) REFER TO SECTION 7.7.1 NFPA 110- 2016 AND VERIFY | | THAT THE VENTILATION AIRFLOW IN THE GENERATOR/TANK | | (EPS) ROOM IS DESIGNED TO LIMIT THE MAXIMUM AIR | | TEMPERATURE IN THE ROOM TO THE MAXIMUM AMBIENT AIR | | TEMPERATURE REQUIRED BY THE GENERATOR MANUFACTURER. | | CONSIDERATION SHALL BE GIVEN TO ALL THE HEAT EMITTED TO | | THE ROOM BY THE ENERGY CONVERTER, EXHAUST PIPES, AND | | ALL OTHER HEAT PRODUCING EQUIPMENT- SECTION 7.7.1.1. | | DESIGN OF THE HEATING, COOLING, AND VENTILATION SYSTEM | | SHALL AMONG OTHER THINGS, INCLUDE PROVISIONS FOR | | FACTORS SUCH AS HEAT, COLD, HUMIDITY, LOUVERS, ETC.- | | SECTION 7.7.7. | | F) THE LOUVERED AIR INTAKE OPENING INTO THE PARKING | | GARAGE IS PROHIBITED PER SECTION 7.7.3 NFPA 110 WHICH | | REQUIRES VENTILATION AIR TO BE TAKEN FROM THE OUTDOORS. | | IN ADDITION PLEASE NOT THAT A FIRE DAMPER WOULD BE | | REQUIRED IN THE LOUVERED OPENING, HOWEVER DAMPERS ARE | | NOT PERMITTED IN VENTILATION OPENINGS INTO THE ROOM- | | SECTION 7.7.2.3 NFPA 110. | | G) VERIFY THAT THE GENERATOR IS CLASSIFIED AS A LEVEL 1 | | PER SECTION 4.4 NFPA 110, AND PROVIDE THE UL 2200 | | CERTIFICATE OF COMPLIANCE- SECTION 915.1 FBC M. | | H) PLEASE PROVIDE A CLEARER COPY OF THE FUEL TANK | | DIAGRAM AND SPECIFICATIONS- SECTION 107.2.1 WPB. | | | | 18) M2.00: THE O/A INTAKES FOR AHU-6 & 7, AND THE | | LAUNDRY ROOM MAKEUP AIR SHALL BE A MINIMUM 10' FROM THE | | PROPERTY LINE- SECTION 401.4 (1) FBC M. THE LOCATIONS | | ARE NOT IN COMPLIANCE. | | | | 19) M2.00: THE EXHAUST OUTLET FOR THE POOL EXHAUST | | SYSTEM SHALL BE A MINIMUM 10' FROM THE PROPERTY LINE- | | SECTION 501.3.1 (2) FBC M. THE LOCATION IS NOT IN | | COMPLIANCE. | | | | 20) M2.00: VERIFY THE BOTTOM OF SF-1 IS A MINIMUM 8' | | ABOVE THE FINISHED GARAGE FLOOR- SECTION 394.6 FBC M. | | | | 21) M2.00: FIRE DAMPER MISSING AT THE 20X20 DUCT | | PENETRATION FROM AHU-6 THROUGH THE FIRE-RATED MECH | | RM/GARAGE WALL. | | | | 22) M2.00: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE | | DRYERS - SECTION 504.6.2 | | | | 23) M2.00: VERIFY THE DRYER EXHAUST FAN WILL RUN | | CONTINUOUSLY OR BE INTERLOCKED TO OPERATE WHEN ANY OF | | THE TWO UNITS ARE OPERATING. A) VERIFY THE MOTOR FOR | | THE FAN IS LOCATED OUTSIDE OF THE AIRSTREAM. | | | | 24) M2.00: PROVIDE EQUIPMENT SCHEDULES AND SUBMIT | | MANUFACTURER'S SPECIFICATIONS FOR THE BREAKROOM COOKING | | APPLIANCE AND RECIRCULATING HOOD- SECTIONS 505, 506, | | AND 917.1 FBC M. | | | | 25) M2.00: FIRE DAMPER SHALL BE INSTALLED IN THE | | LOUVERED DOOR OPENINGS AT THE POOL EQUIPMENT ROOM - | | SECTION 607.5.2 FBC M. | | | | 26) M2.00: A VESTIBULE WILL BE REQUIRED FOR THE POOL | | EQUIPMENT ROOM IF THE ROOM CONTAINS A FUEL-FIRED POOL | | HEATER- SECTION 305.3.2 FBC FG. | | | | 25) M3.00, M4.00, M6.00, M.700, M9.00, AND M10.00: | | INDICATE HOW O/A IS BEING PROVIDED TO THE HOTEL ROOMS | | AND PROVIDE CALCULATIONS- SECTION 401.2 FBC M. NOTE #5 | | REFERENCES RTU-1 FOR O/A CALCULATIONS FOR THE ROOMS BUT | | NO CALCS ARE PROVIDED. | | | | 26) M9.00: PLEASE INCLUDE THE CORRIDORS IN THE | | VENTILATION CALCULATIONS- TABLE 403.3.1.1. FBC M. | | | | 27) M13.00: NOA #13-1017.09 IS OUTDATED. PLEASE PROVIDE | | AN UPDATED COPY. PLEASE NOTE THIS MAY BE A DEFERRED | | SUBMITTAL PER COMMENT #4. | | | | 28) M13.00: CLEARANCES UNDER THE CONDENSING UNITS SHALL | | BE IN ACCORDANCE WITH TABLE 1509.6.5 FBC B. PLEASE | | PLACE A NOTE ON THE DETAIL. | | | | 29) PROVIDE A COMPLETE CONDENSATE DISPOSAL PLAN FOR ALL | | THE AIR HANDLERS- SECTION 307.2.1 FBC M. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE | | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND | | KEEP THEM WITH THE SUBMITTALS | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2020-01-08 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2020-01-08 |
Time |
17:02 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2020-01-08 |
Time |
17:02 |
Sent To |
|
|
Notes |
2020-02-27 07:10:34 | PLUMBING 2ND REVIEW**DENIED**17121018*8 | | ONLY 7 OF THE 16 PLUMBING COMMENTS HAVE BEEN ADDRESSED | | DURING THIS 2ND PLAN SUBMITTAL. IF THESE REMAINING 9 | | COMMENTS ARE NOT COMPLETELY ADDRESSED A 4X PLAN REVIEW | | FEE COULD BE ASSESSED PER FL STATE STATUTE | | 553.80?ENFORCEMENT.?2(B)?WITH RESPECT TO EVALUATION OF | | DESIGN PROFESSIONALS? DOCUMENTS, IF A LOCAL GOVERNMENT | | FINDS IT NECESSARY, IN ORDER TO ENFORCE COMPLIANCE WITH | | THE FLORIDA BUILDING CODE AND ISSUE A PERMIT, TO REJECT | | DESIGN DOCUMENTS REQUIRED BY THE CODE THREE OR MORE | | TIMES FOR FAILURE TO CORRECT A CODE VIOLATION | | SPECIFICALLY AND CONTINUOUSLY NOTED IN EACH REJECTION, | | INCLUDING, BUT NOT LIMITED TO, EGRESS, FIRE PROTECTION, | | STRUCTURAL STABILITY, ENERGY, ACCESSIBILITY, LIGHTING, | | VENTILATION, ELECTRICAL, MECHANICAL, PLUMBING, AND GAS | | SYSTEMS, OR OTHER REQUIREMENTS IDENTIFIED BY RULE OF | | THE FLORIDA BUILDING COMMISSION ADOPTED PURSUANT TO | | CHAPTER 120, THE LOCAL GOVERNMENT SHALL IMPOSE, EACH | | TIME AFTER THE THIRD SUCH REVIEW THE PLANS ARE REJECTED | | FOR THAT CODE VIOLATION, A FEE OF FOUR TIMES THE AMOUNT | | OF THE PROPORTION OF THE PERMIT FEE ATTRIBUTED TO PLANS | | REVIEW. | | | | COMMENTS STILL OUTSTANDING: | | 1) PROVIDE COMPLETE INSTALLATION MANUAL/ SPECS FOR THE | | GREASE INTERCEPTOR, DOMESTIC BOOSTER PUMPS, AND WATER | | HEATERS. FBC 107.2.1 | | 2) SHT. P1.01 WATER HEATER CALLS OUT BTU RATING AS 700K | | BTU BUT UNDER HEATER DETAIL LIST THEN AS 800K BTU WHILE | | SHT. P11 SAYS NO GAS ON THIS PROJECT. PLEASE CLARIFY | | FBC 107.2.1 | | 3) PROVIDE ANTI-SIPHONING BACKFLOW DEVICE FOR THE HOT | | WATER STORAGE TANKS SHOWN ON SHT. P1.01. FBC-PLB 608.2 | | 4) PROVIDE MEANS OF THERMO EXPANSION FOR THE HOT WATER | | SYSTEM. FBC-PLB 607.3 | | 5) SHT. L1-1 LIST THE BACKFLOW FOR THE IRRIGATION | | SYSTEM A WILKINS 720A PVB. THIS WILKINS DEVICE IS NOT | | LEAD FREE/ NS61 APPROVED OR RPZ. PVB?S ARE NOT | | PERMITTED ON COMMERCIAL PROPERTIES WHILE BEING CONNECT | | TO AN INDEPENDENT WATER METER. WPB CROSS CONNECTION | | MANUAL 2017 | | 6) PROVIDE A COMPLETE SANITARY, DOMESTIC WATER, STORM | | WATER, AND GREASE WASTE ISOMETRIC DRAWING FROM THE | | GROUND FLOOR TO THE 4TH. FBC 107.3.5 | | 7) PROVIDE HOW YOU SIZED THE GREASE INTERCEPTOR AND | | WHICH METHOD YOU ARE USING. FBC-PLB 1003 | | 8) SHT. P1.00 SHOWS THE KITCHEN DISCHARGING INTO THE | | SANITARY SEWER AND NOT THE GREASE. BEING THAT COOKING | | WILL BE DONE HERE IT MUST GO THOUGH THE GREASE | | INTERCEPTOR. FBC-PLB 1003.1 | | 9) PROVIDE DETAIL ON ELEVATOR SUMP PUMP IS CONNECTING | | INTO THE SANITARY SYSTEM. FBC 107.3.5 | | | | NEW COMMENTS BASE ON NEW SHEETS SUBMITTED: | | 10) YOU CALL OUT TO SEE OWNERS RESPONSE LETTER BUT ONE | | COULD NOT BE LOCATED IN RESPONSE #1. PLEASE PROVIDE. | | PLEASE REMOVE THE WORDING EXTENDED STAY ROOMS AS THIS | | THE TERM USED FOR STAYS OR 30 DAYS. FBC 107.2.1 | | 11) IN YOUR RESPONSE LETTER IT JUMPS FROM 5 TO 7 AND 6 | | IS MISSING. PLEASE CLARIFY. FBC 107.2.1 | | 12) SHT. A 7.02 DETAIL #7 THE TOILET PAPER HOLDER PER | | FBC-ACC 604.7 MUST BE 7?-9? FROM THE FRONT LIP OF THE | | TOILET TO THE CENTER OF WHERE IT DISPENSES PAPER FROM. | | 13) THE ACCESSIBLE WASHER AND DRYERS AS SHOWN I DO NOT | | FEEL COMPLY. BEING A STACKABLE UNIT IT WOULD NOT MEET | | THE REQUIRED REACH RANGES. THE PARALLEL CLEAR FLOOR | | SPACE ACCESS TO THE UNITS IS BEING BLOCKED BY THE | | CLOSET WALLS.PLEASE CLARIFY AND SHOW DETAIL SHOWING HOW | | THIS DESIGN COMPLIES. FBC-ACC 611.2, 611.4 | | 14) SHT A 7.02 DETAIL # 11. THE SHOWER PAN DETAIL IS | | MISSING THE REQUIRED 2% PRE-PITCH UNDER THE PAN. | | FBC-PLB 717.5.2 | | 15) SHT. A 7.02 DETAIL # 7 PLEASE SHOW THE GRAB BAR IS | | MOUNTED 12? FROM THE TOILET CENTERLINE TOWARDS THE WALL | | AS SHOWN IN FBC-ACC 604.5.2 | | 16) SHT. 7.02 DETAIL 8 THE ACCESSIBLE SHOWERS ARE SHOWN | | WITH A CURB. THE MAX ALLOWED THRESHOLD IS ??FBC-ACC | | 608.7 | | | | TIM HUNT | | PLUMBING PLAN REVIEW | | CITY OF WEST PALM BEACH (CGA SOLUTIONS) | | 561-248-2703 | | [email protected] | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2019-03-25 |
|
|
Cont ID |
|
Sent By |
thunt |
Date |
2019-03-25 |
Time |
14:53 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2019-03-25 |
Time |
09:05 |
Sent To |
|
|
Notes |
2019-03-25 14:53:07 | PLUMBING 1ST REVIEW**DENIED** | | | | | | 1)PLEASE PROVIDE WHICH SAFE HARBOR UNDER THE FAIR | | HOUSING ACT YOU INTENT TO USE AND SHOW ON PLANS. | | PROVIDE FLOOR PLAN SHOWING WHAT DESIGN SPEC EACH UNIT | | WILL BE. FBC 107.3.5 | | | | 2) SHT. A-2.13, 2.12, 3.00, AND 4.00 ARE MISSING THE | | REQUIRED CLEAR FLOOR SPACE FOR THE SHOWERS IN THE | | ACCESSIBILITY COMPLANT ROOMS. FBC 107.3.5 | | | | 3) SHT. A-2.13 PROVIDE CLEAR FLOOR SPACE AS REQUIRED IN | | FRONT OF THE WASHING MACHINE AND DRYER. ALSO INCLUDE | | REACH RANGES. FBC-ACC 611, 308 | | | | 4) SHT. A 2.14 PROVIDE MIRROR DETAIL SHOWING MAX 34" IS | | TO THE REFLECTIVE SURFACE. FBC-ACC 603.3 | | | | 5) SHT. A 2.14 PROVIDE DETAIL SHOWING SIDE GRAB BAR IS | | 42" AND OVERALL WILL BE 54". FBC-ACC 604.5.1 | | | | 6) PROVIDE COMPLETE INSTALLATION MANUAL/ SPECS FOR THE | | GREASE INTERCEPTOR, DOMESTIC BOOSTER PUMPS, WATER | | HEATERS. FBC 107.2.1 | | | | 7) PROVIDE SHOWER PAN DETAIL. IF USING ANY OTHER | | PRODUCT THEN VINYL PAN LINER PROVIDE INSTALLATION | | MANUAL AND PRODUCT APPROVAL SHEETS. FBC 107.2.1 | | | | 8) SHT. A 7.02 DETAIL #8 SHOW THE HAND HELD SHOWER | | ABOVE 48". THE HAND HELD SHALL ME MOUNTED SO THAT THE | | GRABBING SURFACE IS MAX 48". FBC-ACC 608.5.3 | | | | 9) SHT. P1.01 WATER DETAIL LIST BTU'S AS 700,000 BUT | | DETAIL UNDER LIST THEM AS 800,000 BTU. PLEASE CLARIFY | | FBC 107.1 | | | | 10) PROVIDE ANTI-SIPHONING BACKFLOW DEVICE FOR THE HOT | | WATER STORAGE TANKS ON SHT. P1.01. FBC-PLB 608.2 | | | | 11) PROVIDE A MEANS OF THEMO EXPANSION FOR THE HOT | | WATER SYSTEM. FBC-PLB 607.3 | | | | 12) SHT. LI-1 LIST THE BACKFLOW FOR THE IRRAGATION | | SYSTEM AS A PVB WILKINS 720A. THE WILKINS DEVICE IS NOT | | NSF61 COMPLAINT AND PER THE CITY OF W.P.B CROSS | | CONNECTION MANUAL THE CITY WATER SYSTEM SHALL BE | | PROTECTED BY A RPZ LEAD FREE DEVICE. | | | | 13) PROVIDE A COMPLETE SANITARY, DOMESTIC WATER, STORM | | WATER, AND GREASE WASTE ISOMETRIC DRAWING FROM THE | | GROUND FLOOR TO THE 4TH. FBC-PLB 107.3.5 | | | | 14) PROVIDE COMPLETE INSTALLATION MANUAL AND PROVIDE | | CALCULATIONS ON HOW YOU SIZED THE INTERCEPTORS. FBC-PLB | | 1003, F.A.C 64E-6 | | | | 15) SHT. P-1.00 SHOWNS THE KITCHENETTE ON THE SEWER | | LINE. BEING THAT COOKING WILL BE PERFORMED THIS SINK | | SHALL DISCHARGE INTO THE GREASE SYSTEM. FBC-PLB 1003.1 | | | | 16) PROVIDE DETAIL SHOWING THE ELEVATOR SUMP WILL | | DISCHARGE INTO A INDIRECT WASTE INTO THE SANITARY SEWER | | SYSTEM. FBC 802.1.3 | | | | **BEING THAT SEVERAL PAGES ARE MISSING FOR THE | | ISOMETRIC A COMPLETE AND THOROUGH REVIEW COULD NOT BE | | PERFORMED. | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | THE PREVIOUSLY REVIEWED SHEETS.** | | | | TIM HUNT | | PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR | | CITY OF WEST PALM BEACH | | 561-248-2703 | | [email protected] |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2020-01-14 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-01-14 |
Time |
07:01 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-01-14 |
Time |
07:01 |
Sent To |
|
|
Notes |
2020-01-14 07:04:05 | STRUCTURAL PLANS ARE NOT SIGNED AND SEALED AS REQUIRED. | | THE CONSTRUCTION DOCUMENTS SHALL BE PREPARED BY A | | REGISTERED DESIGN PROFESSIONAL WHERE REQUIRED BY | | CHAPTER 471, FLORIDA STATUTES & 61G15 FLORIDA | | ADMINISTRATIVE CODE OR CHAPTER 481, FLORIDA STATUTES & | | 61G1 FLORIDA ADMINISTRATIVE CODE. |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2019-04-09 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2019-04-09 |
Time |
11:42 |
Rev Time |
0.00 |
Received By |
thunt |
Date |
2019-04-09 |
Time |
11:41 |
Sent To |
|
|
Notes |
2019-04-09 11:43:54 | ALL STRUCTURAL PAGES ARE LACKING STAMP AND SIGNATURE. | | F.S 471. 481 | | | | | | | | TIM HUNT | | PLUMBING PLANS EXAMINER | | BUILDING DIVISION | | CITY OF WEST PALM BEACH | | 401 CLEMATIS STREET, 1ST FLOOR | | WEST PALM BEACH, FL 33401 | | 561-248-2703 | | [email protected] | | | 2019-03-27 09:51:50 | 1ST REVIEW MECH SHEETS GOOD | 2019-03-18 12:31:41 | ELECTRICAL SHEETS PROVIDED OK, WILL NEED TO CHECK ANY | | ADDITIONAL SHEETS SUBMITTED FOR NEXT REVIEW. |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
2 |
Status |
F |
Date |
2020-01-14 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2020-01-14 |
Time |
07:17 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2020-01-14 |
Time |
07:17 |
Sent To |
|
|
Notes |
2020-01-14 07:18:53 | THRESHOLD INSPECTOR: WPB AMENDMENT 110.8.1 W.P.B. | | CONSTRUCTION SERVICES DEPARTMENT REQUEST FOR THRESHOLD | | BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY 553.79(5) | | FLORIDA STATUTES TO THE MINIMUM INSPECTIONS REQUIRED BY | | THIS CODE. THE THRESHOLD INSPECTION FORMS ARE REQUIRED | | TO BE FILED OUT BY ALL PARTIES WITH INTEREST, NOTARIZED | | AND RETURNED TO THIS OFFICE, AND REVIEWED AND APPROVED | | BEFORE PERMIT ISSUANCE WILL TAKE PLACE. | | PLEASE CONTACT ME WITH AN EMAIL ADDRESS AND I WILL BE | | HAPPY TO SEND YOU A COPY OF THE OCTOBER 2018 GUIDELINES | | AND POLICIES FOR PROJECTS CONCERNING THRESHOLD/SPECIAL | | INSPECTORS AND RESIDENT INSPECTORS. | | |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
1 |
Status |
F |
Date |
2019-04-18 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2019-04-18 |
Time |
14:31 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2019-04-18 |
Time |
14:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2019-12-13 |
|
|
Cont ID |
|
Sent By |
elevesqu |
Date |
2019-12-13 |
Time |
15:14 |
Rev Time |
0.00 |
Received By |
elevesqu |
Date |
2019-12-13 |
Time |
15:14 |
Sent To |
|
|
Notes |
2019-12-13 15:14:42 | REPEART COMMENT: SITE PLAN APPROVAL IS NEEDED PRIOR TO | | BUILDING PLAN APPROVAL. PLEASE ADDRESS COMMENTS FROM | | SITE PLAN APPROVAL CASE Z16620016 AND RESUBMIT TO P&Z | | | | | | PREVIOUS COMMENTS FROM 1ST REVIEW STOP. STAFF WILL | | REVIEW FOR SATISFACTION AT TIME OF SITE PLAN REVIEW: | | | | THE FOLLOWING COMMENTS 1-9 LIST THE CONDITIONS FROM THE | | DAC FINAL ORDER AND WHETHER THEY HAVE BEEN SATISFIED: | | | | 1. SATISFIED. CROSS WALKS SHALL BE PROVIDED AT STREET | | CORNERS. | | 2. SATISFIED. THE WINDOWS ALONG THE NORTH EDGE OF THE | | EAST ELEVATION SHALL BE LOWERED. | | 3. SATISFIED - WILL BE REVIEWED THROUGH SEPARATE PERMI. | | TREE GRATES ALONG 3RD STREET AND WEST RAILROAD AVENUE | | SHALL BE REMOVED AND A CONTINUOUS 5? WIDE PLANTING BED | | SHALL BE PROVIDED ALONG THE STREETS. | | 4. NOT SATISFIED - WILL BE REVIEWED THROUGH SEPARATE | | PERMIT. THE PROPOSED FLORIDA THATCH PALM ALONG WEST | | RAILROAD AVENUE SHALL BE CHANGED TO OAK TREES. | | 5. NOT SATISFIED - WILL BE REVIEWED THROUGH SEPARATE | | PERMI. THE LOCATION OF THE PROPOSED ALEXANDER PALM | | TREES ALONG 4TH STREET SHALL BE ANALYZED FOR THE | | POSSIBILITY OF INCLUDING A SHADE TREE TO MEET THE 30? | | REQUIREMENT FOR SHADE STREET TREES. | | 6. SATISFIED. THE PAVERS SHALL BE REMOVED AND THE | | LANDSCAPE BED SHALL BE CONTINUED ALONG THE NORTH FA?ADE | | TO THE BUILDING ENTRANCE. | | 7. ONGOING. THE APPLICANT SHALL STUDY THE SITE FOR A | | DIFFERENT LOCATION FOR THE FPL GENERATOR. | | 8. NOT SATISFIED. THE BICYCLE RACKS SHALL BE RELOCATED | | TO A MORE SUITABLE LOCATION FOR PUBLIC USE AND MEET THE | | 24? SPACE REQUIREMENT FROM BUILDING FA?ADE. BICYCLE | | RACK DETAILS SHALL BE INCLUDED WITH BUILDING PERMIT TO | | MEET THE CITY APPROVED STANDARD. | | PLEASE SHOW LOCATION OF PROPOSED BIKE RACKS WITH | | DIMENSIONS ON SITE PLAN. PLEASE INCLUDE BICYCLE RACK | | DETAIL WITH RESUBMITTAL AS REQUESTED. | | 9. NOT SATISFIED. THE PROPOSED BICYCLE RACK ALONG 3RD | | STREET SHALL BE RELOCATED OUTSIDE OF THE FOUNDATION | | LANDSCAPING AREA. | | PLEASE SHOW LOCATION OF BICYCLE RACKS WITH DIMENSIONS | | ON SITE PLAN. | | | | NEW COMMENTS 4/11/2019: | | | | 10. THE TOTAL BUILDING FOOTPRINT HAS CHANGED FROM THE | | LAST SITE PLAN SUBMITTAL TO THIS PERMIT SUBMITTAL FROM | | 142,279.65 SF TO 142,288.42 FROM LAST DRAWINGS. THE FAR | | BREAKDOWN CHANGED BUT APPEARS THE SAME ON THE | | ILLUSTRATIONS. PLEASE CLARIFY THE DIFFERENCES | | 11. CHANGED OUT WINDOWS FOR ALUMINUM VENTILATION | | LOUVRES ON 3RD STREET ELEVATION. PLEASE CLARIFY REASON | | FOR CHANGE AND KEEP WINDOWS IF POSSIBLE. IF BEING | | CHANGED TO LOUVRES, THE TRANSPARENCY CALCULATIONS WILL | | NEED TO RECALCULATED. | | 12. WINDOWS WERE REMOVED FOR WOODEN CLAD SYSTEM ALONG | | THE EAST ELEVATION. PLEASE INCLUDE IN NEW CALCULATIONS | | FOR TRANSPARENCY ALONG EAST ELEVATION THAT ALSO | | ADDRESSES THE LARGER WINDOWS THAT WERE ADDED AS PART OF | | DAC APPROVAL, | | 13. NEW WINDOWS WERE ADDED ALONG THE WEST ELEVATION. | | PLEASE UPDATE IN THE TRANSPARENCY CALCULATIONS. | | 14. PLEASE UPDATE THE NE PERSPECTIVE VIEW ILLUSTRATING | | THE MODIFIED WINDOWS. | | 15. THE COLOR ELEVATIONS FOR THE SOUTH ELEVATION (3RD | | STREET) DO NOT SHOW THE ALUMINUM LOUVRES, IT STILL | | SHOWS WINDOWS. PLEASE UPDATE | | 16. PLEASE UPDATE THE COLOR ELEVATIONS TO SHOW THE | | MODIFIED WINDOWS ALONG THE EAST ELEVATION (W RAILROAD | | AVE) | | 17. PLEASE UPDATE THE COLOR ELEVATIONS TO SHOW THE | | MODIFIED WINDOWS ALONG THE WEST ELEVATION | | 18. PLEASE REMOVE THE LANDSCAPE PLAN SHEETS FROM THIS | | SUBMITTAL AND SUBMIT A SEPARATE LANDSCAPE PERMIT. | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2019-04-11 |
|
|
Cont ID |
|
Sent By |
aaponte |
Date |
2019-04-11 |
Time |
14:16 |
Rev Time |
0.00 |
Received By |
elevesqu |
Date |
2019-04-11 |
Time |
14:07 |
Sent To |
|
|
Notes |
2019-04-11 14:16:20 | SITE PLAN APPROVAL IS NEEDED PRIOR TO BUILDING PLAN | | APPROVAL. PLEASE ADDRESS COMMENTS FROM SITE PLAN | | APPROVAL CASE Z16620016 AND RESUBMIT TO P&Z | | | | THE FOLLOWING COMMENTS 1-9 LIST THE CONDITIONS FROM THE | | DAC FINAL ORDER AND WHETHER THEY HAVE BEEN SATISFIED: | | | | 1. SATISFIED. CROSS WALKS SHALL BE PROVIDED AT STREET | | CORNERS. | | 2. SATISFIED. THE WINDOWS ALONG THE NORTH EDGE OF THE | | EAST ELEVATION SHALL BE LOWERED. | | 3. SATISFIED - WILL BE REVIEWED THROUGH SEPARATE PERMI. | | TREE GRATES ALONG 3RD STREET AND WEST RAILROAD AVENUE | | SHALL BE REMOVED AND A CONTINUOUS 5? WIDE PLANTING BED | | SHALL BE PROVIDED ALONG THE STREETS. | | 4. NOT SATISFIED - WILL BE REVIEWED THROUGH SEPARATE | | PERMIT. THE PROPOSED FLORIDA THATCH PALM ALONG WEST | | RAILROAD AVENUE SHALL BE CHANGED TO OAK TREES. | | 5. NOT SATISFIED - WILL BE REVIEWED THROUGH SEPARATE | | PERMI. THE LOCATION OF THE PROPOSED ALEXANDER PALM | | TREES ALONG 4TH STREET SHALL BE ANALYZED FOR THE | | POSSIBILITY OF INCLUDING A SHADE TREE TO MEET THE 30? | | REQUIREMENT FOR SHADE STREET TREES. | | 6. SATISFIED. THE PAVERS SHALL BE REMOVED AND THE | | LANDSCAPE BED SHALL BE CONTINUED ALONG THE NORTH FA?ADE | | TO THE BUILDING ENTRANCE. | | 7. ONGOING. THE APPLICANT SHALL STUDY THE SITE FOR A | | DIFFERENT LOCATION FOR THE FPL GENERATOR. | | 8. NOT SATISFIED. THE BICYCLE RACKS SHALL BE RELOCATED | | TO A MORE SUITABLE LOCATION FOR PUBLIC USE AND MEET THE | | 24? SPACE REQUIREMENT FROM BUILDING FA?ADE. BICYCLE | | RACK DETAILS SHALL BE INCLUDED WITH BUILDING PERMIT TO | | MEET THE CITY APPROVED STANDARD. | | PLEASE SHOW LOCATION OF PROPOSED BIKE RACKS WITH | | DIMENSIONS ON SITE PLAN. PLEASE INCLUDE BICYCLE RACK | | DETAIL WITH RESUBMITTAL AS REQUESTED. | | 9. NOT SATISFIED. THE PROPOSED BICYCLE RACK ALONG 3RD | | STREET SHALL BE RELOCATED OUTSIDE OF THE FOUNDATION | | LANDSCAPING AREA. | | PLEASE SHOW LOCATION OF BICYCLE RACKS WITH DIMENSIONS | | ON SITE PLAN. | | | | NEW COMMENTS 4/11/2019: | | | | 10. THE TOTAL BUILDING FOOTPRINT HAS CHANGED FROM THE | | LAST SITE PLAN SUBMITTAL TO THIS PERMIT SUBMITTAL FROM | | 142,279.65 SF TO 142,288.42 FROM LAST DRAWINGS. THE FAR | | BREAKDOWN CHANGED BUT APPEARS THE SAME ON THE | | ILLUSTRATIONS. PLEASE CLARIFY THE DIFFERENCES | | 11. CHANGED OUT WINDOWS FOR ALUMINUM VENTILATION | | LOUVRES ON 3RD STREET ELEVATION. PLEASE CLARIFY REASON | | FOR CHANGE AND KEEP WINDOWS IF POSSIBLE. IF BEING | | CHANGED TO LOUVRES, THE TRANSPARENCY CALCULATIONS WILL | | NEED TO RECALCULATED. | | 12. WINDOWS WERE REMOVED FOR WOODEN CLAD SYSTEM ALONG | | THE EAST ELEVATION. PLEASE INCLUDE IN NEW CALCULATIONS | | FOR TRANSPARENCY ALONG EAST ELEVATION THAT ALSO | | ADDRESSES THE LARGER WINDOWS THAT WERE ADDED AS PART OF | | DAC APPROVAL, | | 13. NEW WINDOWS WERE ADDED ALONG THE WEST ELEVATION. | | PLEASE UPDATE IN THE TRANSPARENCY CALCULATIONS. | | 14. PLEASE UPDATE THE NE PERSPECTIVE VIEW ILLUSTRATING | | THE MODIFIED WINDOWS. | | 15. THE COLOR ELEVATIONS FOR THE SOUTH ELEVATION (3RD | | STREET) DO NOT SHOW THE ALUMINUM LOUVRES, IT STILL | | SHOWS WINDOWS. PLEASE UPDATE | | 16. PLEASE UPDATE THE COLOR ELEVATIONS TO SHOW THE | | MODIFIED WINDOWS ALONG THE EAST ELEVATION (W RAILROAD | | AVE) | | 17. PLEASE UPDATE THE COLOR ELEVATIONS TO SHOW THE | | MODIFIED WINDOWS ALONG THE WEST ELEVATION | | 18. PLEASE REMOVE THE LANDSCAPE PLAN SHEETS FROM THIS | | SUBMITTAL AND SUBMIT A SEPARATE LANDSCAPE PERMIT. | | |
|
|
|