Plan Review Stops For Permit 17120633 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2018-01-25 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-01-25 |
Time |
08:13 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-01-25 |
Time |
07:32 |
Sent To |
P |
|
Notes |
2018-01-25 08:20:46 | FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND | | BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO | | FILLING THE POOL WITH WATER. | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2018-01-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-01-03 |
Time |
06:49 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2018-01-03 |
Time |
06:41 |
Sent To |
|
|
Notes |
2018-01-03 06:59:23 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC FIFTH EDITION (2014) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) SUBMIT TWO SETS OF SIGNED AND SEALED PLANS FOR THE | | POOL AND THE SPECIFICATIONS FOR THE POOL EQUIPMENT. FBC | | 107.1 | | | | 2) SUBMIT TWO SETS OF A SITE PLAN AND SURVEY THAT | | SPECIFY THE LOCATION OF THE POOL AND THE POOL EQUIPMENT | | AND SHOWS THE DISTANCES FROM LOT LINES. FBC 107.2.5 | | | | 3) A PERMIT APPLICATION FOR THE POOL PIPING IS | | REQUIRED. FBC105.1 | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2018-01-24 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2018-01-24 |
Time |
15:17 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2018-01-24 |
Time |
15:17 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2018-01-03 |
Time |
|
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2018-01-02 |
Time |
09:53 |
Sent To |
|
|
Notes |
2018-01-02 09:54:09 | NO PLANS FOR REVIEW JLEAHY |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
N |
Date |
2017-12-27 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2017-12-27 |
Time |
11:33 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2017-12-27 |
Time |
11:32 |
Sent To |
|
|
Notes |
2017-12-27 11:33:17 | A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL | | PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT | | THIS TIME. A GAS PERMIT IS REQUIRED FOR A CONTRACTOR TO | | PERFORM THE RELATED WORK. PROVIDE COMPLETE PLANS THAT | | REFLECT THE ENTIRE SCOPE OF GAS WORK TO BE DONE. WPB | | AMEND. TO FBC SEC.107.2.1. | | | | GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE | | FBC-R, SEC. G2404.3. | | GAS APPLIANCES SHALL BE LISTED AND LABELED PER FBC-FUEL | | GAS SEC. 301.3. | | | | A SEPARATE PERMIT IS REQUIRED FOR THE GAS INSTALLATION. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | | | |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
P |
Date |
2017-12-22 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2017-12-22 |
Time |
12:15 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2017-12-21 |
Time |
10:46 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2018-01-26 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-01-26 |
Time |
05:08 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-01-12 |
Time |
11:29 |
Sent To |
I |
|
Notes |
2018-01-16 11:29:24 | RESUB ROUTED TO FMITTNER VIA ZONING INBOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2018-01-03 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2018-01-03 |
Time |
07:00 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2017-12-18 |
Time |
12:41 |
Sent To |
I |
|
Notes |
2017-12-20 12:41:36 | ROUTED TO ZONING |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2018-01-26 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2018-01-26 |
Time |
05:08 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2018-01-26 |
Time |
04:35 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2017-12-27 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2017-12-27 |
Time |
11:32 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2017-12-27 |
Time |
11:24 |
Sent To |
|
|
Notes |
2017-12-27 11:30:28 | 1) SUBMIT TWO COPIES OF POOL PLANS SIGNED AND SEALED BY | | AN ENGINEER. WPB AMEND. TO FBC SEC. 107.1. | | 2) SUBMIT MANUFACTURER'S SPECS FOR THE POOL HEATER.WPB | | AMEND. TO FBC SEC. 107.1. | | 3) SUBMIT MANUF. SPECS FOR THE MAIN DRAIN. WPB AMEND. | | TO FBC SEC. 107.1. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | | | | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2018-01-24 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2018-01-24 |
Time |
09:19 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2018-01-22 |
Time |
14:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2017-12-22 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2017-12-22 |
Time |
12:15 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2017-12-22 |
Time |
12:15 |
Sent To |
|
|
Notes |
2017-12-22 12:15:48 | NO SITE PLAN, SURVEY OR SETBACKS PROVIDED. |
|
|