2017-11-02 15:36:10 | 11-2-17 1ST GAS REVIEW**DENIED** |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1) YOUR ISOMETRIC IS INACCURATE. YOU MUST INCLUDE |
| EVERYTHING ON THE GAS SYSTEM. CITY RECORDS SHOWS 7 |
| ITEMS ON THIS GAS SYSTEM FBC 107.2.1 |
| |
| 2) YOU MUST SHOW THE SIZE AND CUT SECTIONS INCLUDING |
| THE EXISTING LINE YOUR PLANNING ON CONNECTING |
| INTO.SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 FBC-FUEL |
| GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC. G2413 |
| |
| 3) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| BTU LOAD ON THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS |
| SECS.401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 |
| (37) OR 2014 FBC-RES. SEC. G2413. |
| |
| 4) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| INSTALLATION MANUAL FOR ALL GAS EQUIPMENT THAT YOU ARE |
| CONNECTING TO TO VERIFY COMPLIANCE WITH STANDARDS NFPA |
| 54, NFPA 58, AND FBC-2014 FUEL GAS CODE SEC. 402.2, AND |
| 301.3 OR 2014 FBC-RES. SEC. G2404.3. GAS APPLIANCES |
| SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS |
| FOR ALL GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT |
| THE TIME OF INSPECTION. FGC SEC.305.1, FBC-RES. |
| SEC.G2408.1. |
| |
| 5) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE |
| PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM |
| THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE |
| DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL |
| GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4 |
| (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4, |
| G2412.8, G2413.1, G2413.2, & G2413.3. |
| |
| 6) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE |
| PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| INSTALLATION. 2014 FGC SEC.410.1 |
| |
| 7) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE |
| APPLIANCE. COMPLY WITH 2014 FBC-FUEL GAS TABLE 402.4 |
| (28) FOR THE PROPER PIPE SIZE AND BTU LOAD. |
| |
| TIM HUNT |
| PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| BUILDING DIVISION |
| 561-805-6695 |
| [email protected] |
| |