Plan Review Details - Permit 17100824
Plan Review Stops For Permit 17100824
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2018-02-13 Cont ID  
Sent By tklarge Date 2018-02-13 Time 05:44 Rev Time 0.00
Received By tklarge Date 2018-02-13 Time 05:40 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2018-01-31 Cont ID  
Sent By tklarge Date 2018-01-31 Time 06:35 Rev Time 0.00
Received By tklarge Date 2018-01-31 Time 05:51 Sent To  
Notes
2018-01-31 05:57:401) THREE COPIES OF A PLAN HAS BEEN SUBMITTED THAT HAS
 BEEN DONE BY AN ARCHITECT. PLANS SUBMITTED BY AN
 ARCHITECT SHALL BEAR A SEAL AND SIGNATURE COMPLYING
 WITH FL. ADMIN. CODE RULE 61G1-16.001 & 61G1-16.003.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2017-10-23 Cont ID  
Sent By tklarge Date 2017-10-23 Time 11:16 Rev Time 0.00
Received By tklarge Date 2017-10-23 Time 11:16 Sent To  
Notes
2017-10-23 11:16:321) SUBMIT TWO COPIES OF THE PLANS. WPB AMEND. TO FBC
 SEC. 107.1.
 2) THE WALLBOARD IN THE TUB AREA SHALL COMPLY WITH THE
 2014 FBC-RESIDENTIAL SEC. R702.4.2.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 3 Status N Date 2018-08-29 Cont ID  
Sent By tklarge Date 2018-02-13 Time 05:40 Rev Time 0.00
Received By tklarge Date 2018-02-13 Time 05:21 Sent To  
Notes
2018-08-29 14:16:13GAS APPROVED UNDER PERMIT APPLICATION #18020723. OK TO
 RELEASE THE MASTER. TKL.
2018-02-13 05:23:501) SUBMIT A SEPARATE PERMIT APPLICATION FOR THE GAS AND
 A SEPARATE PERMIT APPLICATION FOR THE PLUMBING
 CONNECTIONS TO THE TANKLESS WATER HEATER INSTALLATION
 AND FOR THE NEW WATER LINES TO BE RUN. . WPB AMEND. TO
 FBC SEC. 107.1. 3RD REQUEST.
 2) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED ABOVE
 GROUND.TO THE TANKLESS WATER HEATER.WPB AMENDMENTS TO
 FBC SEC.107.2.1. 3RD REQUEST.
 3) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2014
 FBC-FUEL GAS SEC.402.4.1 OR 2014 FBC-RES. SEC. G
 2413.3. 3RD REQUEST.
 4) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES.
 SEC. G2413.2. 3RD REQUEST
 5) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR THE TANKLESS WATER HEATER.THE
 INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT
 SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC
 SEC.305.1, FBC-RES. SEC.G2408.1.3RD REQUEST.
 6) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE
 LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION
 AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN
 RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER
 HEATER SHALL COMPLY WITH THE MANUFACTURER'S
 INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND
 DRAWN. WPB AMEND. TO FBC SEC. 107.2.1. 3RD REQUEST.
 7) TWO COPIES OF A GAS SIZING TABLE FOR THE GAS HAS
 BEEN SUBMITTED BUT THERE IS NO STANDARD OR INFORMATION
 AS TO WHERE THIS TABLE IS FROM. THE TABLE NOTES IT IS
 FOR NATURAL GAS AND PROPANE BOTH WHICH DO NOT CORRELATE
 WITH THE SIZING TABLE IN THE 2014 FBC-FUEL GAS CODE.
 CLARIFY.
 8) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM ( PE PIPE) OR PLACE A NOTE
 ON THE PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S)
 FROM THE GAS CODE OR OTHER STANDARD THAT WERE USED IN
 THE DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014
 FBC-FUEL GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES
 402.4 (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC.
 G2412.4, G2412.8, G2413.1, G2413.2, & G2413.3.3RD
 REQUEST
 9) SUBMIT TWO COPIES OF THE SIZING TABLE FOR THE PIPE
 BEING INSTALLED ABOVE GROUND.. COMPLY WITH 2014
 FBC-FUEL GAS.3RD REQUEST.
  
 **NOTE- NONE OF THE PREVIOUS GAS COMMENTS HAVE BEEN
 ADDRESSED. RESUBMITTAL OF THESE PLANS WILL BE SUBJECT
 TO A RESUBMITTAL PAYMENT OF 4 TIMES THE FEE APPLIED TO
 PLAN REVIEW PER FL. STATUTE 553.80 (2) (B). DO NOT
 RESUBMIT THESE PLANS UNTIL ALL PLAN REVIEW COMMENTS
 HAVE BEEN ADDRESSED.
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2018-01-31 Cont ID  
Sent By tklarge Date 2018-01-31 Time 06:35 Rev Time 0.00
Received By tklarge Date 2018-01-31 Time 05:43 Sent To  
Notes
2018-01-31 06:35:051)SUBMIT A SEPARATE PERMIT APPLICATION FOR THE GAS AND
 A SEPARATE PERMIT APPLICATION FOR THE PLUMBING
 CONNECTIONS TO THE TANKLESS WATER HEATER INSTALLATION
 AND FOR THE NEW WATER LINES TO BE RUN. . WPB AMEND. TO
 FBC SEC. 107.1. 2ND REQUEST
 2) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED ABOVE
 GROUND.TO THE TANKLESS WATER HEATER.WPB AMENDMENTS TO
 FBC SEC.107.2.1.
 3) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2014
 FBC-FUEL GAS SEC.402.4.1 OR 2014 FBC-RES. SEC. G
 2413.3. 2ND REQUEST.
 4) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES.
 SEC. G2413.2. 2ND REQUEST
 5) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR THE TANKLESS WATER HEATER.THE
 INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT
 SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC
 SEC.305.1, FBC-RES. SEC.G2408.1.2ND REQUEST.
 6) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE
 LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION
 AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN
 RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER
 HEATER SHALL COMPLY WITH THE MANUFACTURER'S
 INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND
 DRAWN. WPB AMEND. TO FBC SEC. 107.2.1. 2ND REQUEST
 7) TWO COPIES OF A GAS SIZING TABLE FOR THE GAS HAS
 BEEN SUBMITTED BUT THERE IS NO STANDARD OR INFORMATION
 AS TO WHERE THIS TABLE IS FROM. THE TABLE NOTES IT IS
 FOR NATURAL GAS AND PROPANE BOTH WHICH DOES NOT
 CORRELATE WITH THE SIZING TABLE IN THE 2014 FBC-FUEL
 GAS CODE. CLARIFY.
 8) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM ( PE PIPE) OR PLACE A NOTE
 ON THE PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S)
 FROM THE GAS CODE OR OTHER STANDARD THAT WERE USED IN
 THE DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014
 FBC-FUEL GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES
 402.4 (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC.
 G2412.4, G2412.8, G2413.1, G2413.2, & G2413.3.
 9) SUBMIT TWO COPIES OF THE SIZING TABLE FOR THE PIPE
 BEING INSTALLED ABOVE GROUND.. COMPLY WITH 2014
 FBC-FUEL GAS.
 10) THREE COPIES OF A PLAN HAS BEEN SUBMITTED THAT HAS
 BEEN DONE BY AN ARCHITECT. PLANS SUBMITTED BY AN
 ARCHITECT SHALL BEAR A SEAL AND SIGNATURE COMPLYING
 WITH FL. ADMIN. CODE RULE 61G1-16.001 & 61G1-16.003.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2017-10-23 Cont ID  
Sent By tklarge Date 2017-10-23 Time 11:07 Rev Time 0.00
Received By tklarge Date 2017-10-23 Time 10:54 Sent To  
Notes
2017-10-23 11:07:021) ONE COPY OF A GAS PLAN FOR A NEW TANKLESS WATER HAS
 BEEN SUBMITTED. SUBMIT A SEPARATE PERMIT APPLICATION
 FOR THE GAS AND A SEPARATE PERMIT APPLICATION FOR THE
 PLUMBING CONNECTIONSTANKLESS WATER HEATER INSTALLATION.
 WPB AMEND. TO FBC SEC. 107.1.
 2).SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 FBC-FUEL
 GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC.
 G2413.
 3) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL
 PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE
 CORRUGATED STAINLESS STEEL TUBING (IF APPLICABLE) FOR
 EACH PIPE SIZE. WPB AMENDMENTS TO FBC SEC.107.2.1.
 4) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS
 SECS.401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4
 (37) OR 2014 FBC-RES. SEC. G2413.
 5) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2014
 FBC-FUEL GAS SEC.402.4.1 OR 2014 FBC-RES. SEC. G
 2413.3.
 6) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES.
 SEC. G2413.2. .
 7) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1.
 8) INDICATE ON THE PLAN IF THE TANKLESS WATER HEATER IS
 THE ONLY GAS APPLIANCE ON THIS SYSTEM? IF NOT, SUBMIT A
 COMPLETE GAS RISER SHOWING ALL PIPE SIZES, TYPE OF
 PIPE, THE DEVELOPED LENGTH TO THE FURTHEST GAS OUTLET,
 THE BTU LOAD OF EACH APPLIANCE, THE PSI OF THE SYSTEM,
 THE TYPE OF GAS AND THE TOTAL BTU LOAD ON THE SYSTEM.
 THESE REQUIREMENTS ALSO APPLY TO A NEW GAS SYSTEM.
 9) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE
 LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION
 AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN
 RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER
 HEATER SHALL COMPLY WITH THE MANUFACTURER'S
 INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND
 DRAWN. WPB AMEND. TO FBC SEC. 107.2.1.
 10) INDICATE ON THE PLAN IF THE TANKLESS WATER HEATER
 IS REPLACING AN EXISTING TANKLESS WATER HEATER OR IS IT
 REPLACING A STORAGE TANK TYPE WATER HEATER OR IS IT
 BEING ADDED TO THE EXISTING HOT WATER SYSTEM? INDICATE
 ON THE APPLICATION IN THE DESCRIPTION OF WORK.
 11) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL
 GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4
 (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4,
 G2412.8, G2413.1, G2413.2, & G2413.3.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-02-13 Cont ID  
Sent By tklarge Date 2018-02-13 Time 05:44 Rev Time 0.00
Received By tklarge Date 2018-02-06 Time 09:13 Sent To  
Notes
2018-02-07 09:13:33ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-01-31 Cont ID  
Sent By tklarge Date 2018-01-31 Time 06:47 Rev Time 0.00
Received By tklarge Date 2018-01-26 Time 13:09 Sent To I
Notes
2018-01-29 13:10:06RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-10-23 Cont ID  
Sent By tklarge Date 2017-10-23 Time 11:16 Rev Time 0.00
Received By tklarge Date 2017-10-19 Time 13:08 Sent To  
Notes
2017-10-20 13:08:14ROUTED TO PLUMBING INBOX

Review Stop P PLUMBING
Rev No 3 Status P Date 2018-02-13 Cont ID  
Sent By tklarge Date 2018-02-13 Time 05:38 Rev Time 0.00
Received By tklarge Date 2018-02-13 Time 05:12 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2018-01-31 Cont ID  
Sent By tklarge Date 2018-01-31 Time 06:47 Rev Time 0.00
Received By tklarge Date 2018-01-31 Time 06:36 Sent To I
Notes
2018-01-31 06:43:231) NOTE ON THE PLANS THAT THE TUB/SHOWER VALVE IS
 THERMOSTATIC OR PRESSURE BALANCED.
 2) CLARIFY THE SCOPE OF WORK ON THE PLUMBING
 APPLICATION."2ND ROUGH TOP OUT PLUMBING" IS TOO VAGUE A
 DESCRIPTION.
 3) A GAS PLAN HAS BEEN SUBMITTED FOR THE INSTALLATION
 OF A NEW TANKLESS WATER HEATER. A SEPARATE GAS PERMIT
 APPLICATION SHALL BE SUBMITTED.
 4) THREE COPIES OF A PLAN HAS BEEN SUBMITTED THAT HAS
 BEEN DONE BY AN ARCHITECT. PLANS SUBMITTED BY AN
 ARCHITECT SHALL BEAR A SEAL AND SIGNATURE COMPLYING
 WITH FL. ADMIN. CODE RULE 61G1-16.001 & 61G1-16.003.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2017-10-23 Cont ID  
Sent By tklarge Date 2017-10-23 Time 11:16 Rev Time 0.00
Received By tklarge Date 2017-10-23 Time 10:31 Sent To  
Notes
2017-10-23 10:52:261) SUBMIT TWO COPIES OF THE PLANS. WPB AMEND. TO FBC
 SEC. 107.1.
 2) NOTE ON THE PLANS THAT THE TUB/SHOWER VALVE IS
 THERMOSTATIC OR PRESSURE BALANCED.
 3) A PERMIT APPLICATION IS REQUIRED BY A LICENSED
 PLUMBING CONTRACTOR.A GENERAL CONTRACTOR CANNOT INSTALL
 PLUMBING. F.S. 489.
 4) A GAS PLAN HAS BEEN SUBMITTED FOR THE INSTALLATION
 OF A NEW TANKLESS WATER HEATER. A SEPARATE GAS PERMIT
 APPLICATION SHALL BE SUBMITTED ALONG WITH TWO SETS OF
 PLANS.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved