2017-10-23 06:59:08 | 1) THE SUBMITTED PLANS ARE NOT THE SAME. ONE HAS A |
| PLUMBING LINE RAWN OUT IN RED INK AND THE OTHER DOES |
| NOT. THE PLANS ARE CONFUSING AS TO THE SCOPE OF WORK |
| BEING DONE. SUBMIT TWO CLEAR LEGIBLE DRAWINGS THAT |
| REFLECT THE SCOPE OF WORK BEING DONE. I CANNOT TELL |
| WHAT IS BEING DONE BASED ON THE SUBMITTED DRAWING.WPB |
| AMEND. TO FBC SEC. 107.2.1. |
| 2) CLEARLY SHOW THE AREA WHERE THE SLAB IS BEING |
| SAWCUT. THE DRAWING APPEARS TO SHOW THIS AREA OUTSIDE |
| THE STRUCTURE. |
| 3) SHOW ALL PIPE SIZES ON THE REQUIRED DRAWING. |
| 4) LONG SWEEPS ARE ONLY PERMITTED ON A CHANGE OF |
| DIRECTION FROM HORIZONTAL TO HORIZONTAL PER 2014 |
| FBC-PLUMBING TABLE 706.3. |
| 5) THE DRAWING WITH RED INK SHOWS SHOWS "NEW EXISTING |
| PVC." HOW CAN IT BE NEW AND EXISTING AT THE SAME TIME? |
| CLARIFY. |
| 6) SUBMIT A SLAB REPAIR DETAIL FOR REVIEW. SHOW THE |
| WIDTH OF THE REPAIR, THE MINIMUM THICKNESS OF THE |
| CONCRETE TO BE REPLACED, AND THE PSI OF THE CONCRETE. |
| SHOW THE SIZE AND LENGTH OF THE DOWELS, THE MINIMUM |
| EMBEDMENT DEPTH INTO THE EXISTING SLAB, AND THE SPACING |
| OF THE DOWELS ON CENTER. THE REPAIR SHALL ALSO INCLUDE |
| TERMITE TREATMENT OF THE SOIL AND THE REQUIRED VAPOR |
| BARRIER OVER THE SOIL. A COPY OF THE TERMITE |
| CERTIFICATE SHALL BE ONSITE FOR FINAL INSPECTION. |
| 7) THE PLAN REFERS TO UNDERMINING? IF THE EXISTING SLAB |
| WILL BE UNDERMINED, THE FOLLOWING INFORMATION SHALL BE |
| PROVIDED: |
| DETAILS AND BACKFILLING PROCEDURES SHALL BE SUBMITTED |
| THAT CLEARLY SHOW HOW THE STRUCTURAL INTEGRITY OF THE |
| CONCRETE SLAB WILL BE MAINTAINED DURING EXCAVATION AND |
| BACKFILLING. |
| THE BACKFILL UNDER THE SLAB SHALL BE TREATED FOR |
| TERMITES PER THE FBC-BUILDING SEC.1816.1 OR |
| FBC-RESIDENTIAL SEC. R318. A TERMITE CERTIFICATE SHALL |
| BE ONSITE FOR FINAL INSPECTION. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |
| |
| |
| |
| |