Plan Review Details - Permit 17100504
Plan Review Stops For Permit 17100504
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2017-12-15 Cont ID  
Sent By skennedy Date 2017-12-15 Time 15:51 Rev Time 0.00
Received By skennedy Date 2017-12-15 Time 15:51 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2017-11-29 Cont ID  
Sent By rmcdouga Date 2017-11-29 Time 17:31 Rev Time 0.00
Received By rmcdouga Date 2017-11-28 Time 17:31 Sent To  
Notes
2017-11-29 17:31:38PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) (REPEAT COMMENT) THE ELEVATIONS ON THE SITE DRAINAGE
 PLAN ON AS-1 INDICATE THAT THE SURFACE WATER ON THE
 WEST SIDE OF THE STRUCTURE WILL DRAIN TO THE SOUTHWEST
 REAR CORNER OF THE PROPERTY AND POSSIBLY ONTO THE
 ADJACENT PROPERTY. PLEASE REVIEW THE ELEVATIONS AND
 PROVIDE DRAINS OR SWALES TO ENSURE THAT THE SURFACE
 DRAINAGE IS DIVERTED TO A STORM SEWER CONVEYANCE OR
 OTHER APPROVED POINT OF COLLECTION. FBC-R401.3
 THE SURFACE WATER FOR THIS PROJECT IS REQUIRED TO BE
 KEPT ON THE LOT, ROUTED TO THE NORTH EAST CORNER AND
 THEN TO THE STORM DRAINS IN THE STREET. IT IS NOT
 ALLOWED TO DRAIN ON TO THE ADJACENT LOTS. THE
 ELEVATIONS OF THE ADJACENT LOTS ARE NOT SHOWN ON THE
 PLAN. THERE IS NO DESIGNATED EASEMENT OR ALLEY AT THE
 REAR OF THE PROPERTY SHOWN ON THE SURVEY. THE DRAINAGE
 PLAN WILL NEED TO SHOW THE SWAILS, BERMS OR DRAINS THAT
 WILL BE USED TO ACHIEVE PROPER DRAINAGE.
  
 2) (REPEAT COMMENT) THE ENERGY FORM R405-2014 IS
 REQUIRED TO BE SIGNED AND DATED BY THE PREPARER AND THE
 OWNER/AGENT. FBC ENERGY CONSERVATION SECT. R103.1.1.2
 AND R405.4.2
  
 3) THE SOIL REPORT DOCUMENT APPEARS TO BE BLANK. DID
 YOU INTEND TO SUBMIT A SOIL REPORT?
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2017-11-06 Cont ID  
Sent By rmcdouga Date 2017-11-06 Time 18:54 Rev Time 0.00
Received By rmcdouga Date 2017-11-06 Time 11:03 Sent To  
Notes
2017-11-06 17:58:09PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE CODE COMPLIANCE STATEMENT ON THE COVERSHEET IS
 NOT SIGNED BY THE DESIGNER OF RECORD.
  
 2) SPECIFY THE TYPE OF CONSTRUCTION FOR THE STRUCTURE
 ON THE PLANS. IT APPEARS TO BE TYPE V-B. FBC-R301.1.1 &
 FBC 602.1
  
 3) THE ELEVATIONS ON THE SITE DRAINAGE PLAN ON AS-1
 INDICATE THAT THE SURFACE WATER ON THE WEST SIDE OF THE
 STRUCTURE WILL DRAIN TO THE SOUTHWEST REAR CORNER OF
 THE PROPERTY AND POSSIBLY ONTO THE ADJACENT PROPERTY.
 PLEASE REVIEW THE ELEVATIONS AND PROVIDE DRAINS OR
 SWALES TO ENSURE THAT THE SURFACE DRAINAGE IS DIVERTED
 TO A STORM SEWER CONVEYANCE OR OTHER APPROVED POINT OF
 COLLECTION. FBC-R401.3
  
 4) THE ENERGY FORM R405-2014 IS REQUIRED TO BE SIGNED
 AND DATED BY THE PREPARER AND THE OWNER/AGENT. FBC
 ENERGY CONSERVATION SECT. R103.1.1.2 AND R405.4.2
  
 5) THE ENERGY FORM R405-2014 HAS THE WRONG ORIENTATION
 FOR THE FRONT AND REAR EXTERIOR DOORS. THE FRONT DOOR
 FACES NORTH AND THE REAR DOOR FACES SOUTH. NOT EAST AND
 WEST AS LISTED IN THE DOCUMENT.
  
 6) ON SHEET S1.1 ONE OF THE MASONRY NOTES REFERENCES
 ACI 530-99. CHAPTER 46 OF THE 2014 FBC-R REFERENCES THE
 2011 EDITION OF ACI 530. PLEASE UPDATE TO ACI 530-11.
  
 7) FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE
 TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. THE
 VALUATION HAS BEEN INCREASED TO $177,399.00 BASED ON
 THE LATEST ICC VALUATION DATA.
  
 8) IN ORDER TO REDUCE PLAN REVIEW TIME, PLEASE SUBMIT A
 RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW
 COMMENTS HAS BEEN ADDRESSED.
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2017-10-31 Cont ID  
Sent By jpearson Date 2017-10-31 Time 09:45 Rev Time 0.00
Received By jpearson Date 2017-10-31 Time 09:45 Sent To  
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2017-11-03 Cont ID  
Sent By destabro Date 2017-11-03 Time 13:29 Rev Time 0.00
Received By destabro Date 2017-11-03 Time 13:29 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2017-12-15 Cont ID  
Sent By skennedy Date 2017-12-15 Time 15:51 Rev Time 0.00
Received By skennedy Date 2017-12-12 Time 08:43 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-12-12 Cont ID  
Sent By cpuell Date 2017-12-12 Time 11:34 Rev Time 0.00
Received By cpuell Date 2017-11-14 Time 12:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-11-06 Cont ID  
Sent By rmcdouga Date 2017-11-06 Time 18:54 Rev Time 0.00
Received By rmcdouga Date 2017-10-13 Time 12:51 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 3 Status P Date 2017-12-15 Cont ID  
Sent By skennedy Date 2017-12-15 Time 15:42 Rev Time 0.00
Received By skennedy Date 2017-12-15 Time 15:42 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2017-11-29 Cont ID  
Sent By rmcdouga Date 2017-11-29 Time 14:26 Rev Time 0.00
Received By rmcdouga Date 2017-11-29 Time 14:26 Sent To  
Notes
2017-11-29 14:27:09MU2017-27870, PAID $1281.90.

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2017-11-06 Cont ID  
Sent By rmcdouga Date 2017-11-06 Time 11:04 Rev Time 0.00
Received By rmcdouga Date 2017-11-06 Time 11:04 Sent To  
Notes
2017-11-06 11:05:20SUBMIT THE PLAN SHEET WITH THE PALM BEACH COUNTY IMPACT
 FEE STAMP ON IT FOR THIS PROPERTY.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2017-11-29 Cont ID  
Sent By rmcdouga Date 2017-11-29 Time 13:34 Rev Time 0.00
Received By rmcdouga Date 2017-11-29 Time 09:40 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2017-11-06 Cont ID  
Sent By rmcdouga Date 2017-11-06 Time 11:47 Rev Time 0.00
Received By rmcdouga Date 2017-11-06 Time 11:47 Sent To  
Notes
2017-11-06 17:57:17PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY MECHANICAL
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE EQUIPMENT SIZING CALCULATIONS, MANUAL J
 CALCULATIONS, INDICATE THAT THE RESIDENCE FACES SOUTH.
 THE FRONT DOOR OF THE RESIDENCE FACES NORTH. FBC ENERGY
 CONSERVATION SECTION R405.4.2
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2017-10-19 Cont ID  
Sent By gjohnson Date 2017-10-19 Time 14:27 Rev Time 0.00
Received By gjohnson Date 2017-10-19 Time 13:56 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2017-12-12 Cont ID  
Sent By destabro Date 2017-12-12 Time 11:28 Rev Time 0.00
Received By destabro Date 2017-12-12 Time 11:28 Sent To B1
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2017-11-03 Cont ID  
Sent By destabro Date 2017-11-03 Time 13:29 Rev Time 0.00
Received By destabro Date 2017-11-03 Time 13:29 Sent To B
Notes
***NONE***