Plan Review Details - Permit 17100500
Plan Review Stops For Permit 17100500
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2017-12-28 Cont ID  
Sent By squinone Date 2017-12-28 Time   Rev Time 0.00
Received By squinone Date 2017-12-28 Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2017-12-13 Cont ID  
Sent By squinone Date 2017-12-13 Time   Rev Time 0.00
Received By squinone Date 2017-12-13 Time   Sent To  
Notes
2017-12-13 16:14:25CITY OF WEST PALM BEACH
 ENGINEERING SERVICES DEPARTMENT
 PROJECT NAME: 710 6TH STREET
 STATUS: FAILED
 DATE: OCTOBER 30, 2017
  
 1) REFER TO CITY'S STANDARD DETAIL GC-7 CONCRETE
 DRIVEWAY APRONS: HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING
 -PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
 2) SIDEWALK WILL NEED TO BE RECONSTRUCTED TO COMPLY
 WITH GC-7. ALL DRIVEWAY CONCRETE WITHIN ROW SHALL BE
 6-INCH THICK, 3000 PSI.
 3) ADD FOLLOWING NOTE TO PLANS: CALL SUNSHINE 811 PRIOR
 TO DIGGING TO LOCATE ALL UNDERGROUND UTILITIES.
  
 SOFIA QUINONES-BENEJAM, EI
 PROJECT ENGINEER
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33402
 (MAILING ADDRESS: PO BOX 3366)
 P: 561.494.1108
 C: 561.459.6518
 F: 561.494.1116
 EMAIL: [email protected]
  

Review Stop HIST HISTORICAL
Rev No 2 Status N Date 2017-12-22 Cont ID  
Sent By fmittner Date 2017-12-22 Time 16:21 Rev Time 0.00
Received By fmittner Date 2017-12-22 Time 16:21 Sent To  
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status N Date 2017-11-21 Cont ID  
Sent By aaponte Date 2017-11-21 Time 14:26 Rev Time 0.00
Received By aaponte Date 2017-11-21 Time 14:26 Sent To  
Notes
2017-11-21 14:26:35DRIVEWAY PERMI ONLY.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-01-09 Cont ID  
Sent By shill Date 2018-01-09 Time 07:25 Rev Time 0.00
Received By shill Date 2017-12-18 Time 18:01 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-12-15 Cont ID  
Sent By cpuell Date 2017-12-15 Time 18:16 Rev Time 0.00
Received By cpuell Date 2017-10-16 Time 13:33 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2018-01-08 Cont ID  
Sent By AA Date 2018-01-08 Time 13:08 Rev Time 0.00
Received By aaponte Date 2018-01-08 Time 13:08 Sent To  
Notes
2018-01-08 13:10:36DRIVEWAY SHALL MEET THE SIDEWALK LEVEL. SIDEWALK LEVEL
 SHALL BE MAINTAINED WHILE CROSSING DRIVEWAY.

Review Stop Z ZONING
Rev No 1 Status P Date 2017-11-21 Cont ID  
Sent By AA Date 2017-11-21 Time 14:26 Rev Time 0.00
Received By aaponte Date 2017-11-16 Time 09:57 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved