Plan Review Details - Permit 17090444
Plan Review Stops For Permit 17090444
Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2017-10-12 Cont ID  
Sent By pleduc Date 2017-10-12 Time   Rev Time 0.00
Received By pleduc Date 2017-10-11 Time 16:40 Sent To G
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2017-09-25 Cont ID  
Sent By pleduc Date 2017-09-25 Time   Rev Time 0.00
Received By pleduc Date 2017-09-25 Time 12:35 Sent To M
Notes
2017-09-25 13:42:36THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) THE SUBMITTED PICTURE AND SITE SURVEY DO NOT MATCH.
 IT APPEARS THE TANKS ARE LOCATED ON OPPISITE SIDES OF
 THE OTHER.
  
 WHICH IS CORRECT?
  
  
  
 2) IT APPEARS THAT THE TANKS ARE PROPOSED TO UNDERNEATH
 A POWER LINE.
  
 PER NFPA 58, INSTALLATION OF LP-GAS SYSTEMS
  
 6.4.5.12 AN ABOVEGROUND LP-GAS CONTAINER AND ANY OF ITS
 PARTS SHALL NOT BE LOCATED WITHIN 6 FT (1.8 M) OF A
 VERTICAL PLANE BENEATH OVERHEAD ELECTRIC POWER LINES
 THAT ARE OVER 600 VOLTS, NOMINAL.
  
  
 PLEASE PROVIDE A NOTE INDICATING COMPLIANCE OR MOVE THE
 TANK.
  
  
  
 3) THERE APPEARS TO BE UNDERGROUND PIPING PROPOSED.
 THERE IS LIMITED UNDERGROUND INFORMATION SUBMITTED.
  
 PER NFPA 58, INSTALLATION OF LP-GAS SYSTEMS
  
 6.9.3.12 BURIED METALLIC PIPE AND TUBING SHALL BE
 INSTALLED UNDERGROUND WITH A MINIMUM 12 IN. (300 MM) OF
 COVER. THE MINIMUM COVER SHALL BE INCREASED TO 18 IN.
 (460 MM) IF EXTERNAL DAMAGE TO THE PIPE OR TUBING FROM
 EXTERNAL FORCES IS LIKELY TO RESULT. IF A MINIMUM 12
 IN. (300 MM) OF COVER CANNOT BE MAINTAINED, THE PIPING
 SHALL BE INSTALLED IN CONDUIT OR SHALL BE BRIDGED
 (SHIELDED).
 6.9.3.13 WHERE UNDERGROUND PIPING IS BENEATH DRIVEWAYS,
 ROADS, OR STREETS, POSSIBLE DAMAGE BY VEHICLES SHALL BE
 TAKEN INTO ACCOUNT.
 6.9.3.14 UNDERGROUND METALLIC PIPING SHALL BE PROTECTED
 AGAINST CORROSION AS WARRANTED BY SOIL CONDITIONS. (SEE
 SECTION 6.16.)
 6.9.3.15 LP-GAS PIPING SHALL NOT BE USED AS A GROUNDING
 ELECTRODE.
 6.9.3.16 UNDERGROUND METALLIC PIPING, TUBING, OR BOTH
 THAT CONVEY LP-GAS FROM A GAS STORAGE CONTAINER SHALL
 BE PROVIDED WITH DIELECTRIC FITTINGS AT THE BUILDING TO
 ELECTRICALLY ISOLATE IT FROM THE ABOVEGROUND PORTION OF
 THE FIXED PIPING SYSTEM THAT ENTERS A BUILDING. SUCH
 DIELECTRIC FITTINGS SHALL BE INSTALLED ABOVE GROUND AND
 OUTDOORS.
  
 PLEASE PROVIDE GREATER DETAIL AND A NOTE OF COMPLIANCE.
  
  
  
 4) THE PROPOSED TANKS APPEAR TO BE NEAR A VEHICLE
 TRAFFIC LANE. THE TANKS SHALL BE PROVIDED WITH
 PROTECTION AGAINST UNINTENDED VEHICLE CONTACT, I.E
 POLLARDS.
  
 PLEASE PROVIDE PROTECTION FROM VEHICLE CONTACT.
  
  
  
 5) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
 6) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2017-10-16 Cont ID  
Sent By thunt Date 2017-10-16 Time 14:00 Rev Time 0.00
Received By thunt Date 2017-10-12 Time 15:57 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2017-10-05 Cont ID  
Sent By tklarge Date 2017-10-05 Time 06:40 Rev Time 0.00
Received By tklarge Date 2017-10-04 Time 06:08 Sent To  
Notes
2017-10-04 06:08:391) THE SUBMITTED PICTURE AND SITE SURVEY DO NOT MATCH.
 IT APPEARS THE TANKS ARE LOCATED ON OPPISITE SIDES OF
 THE OTHER. CLARIFY.
 2) IT APPEARS THAT THE TANKS ARE PROPOSED TO BE LOCATED
 UNDERNEATH A POWER LINE.NFPA 58-11 SECS.
 6.4.5.12.PROVIDE A NOTE INDICATING COMPLIANCE OR MOVE
 THE TANKS.
 3) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATIONS AND INSTALLATION FOR THE FIRST STAGE AND
 SECOND STAGE REGULATORS. WPB AMENDMENTS TO FBC SEC.
 107.2.1.
 4) REGULATORS INSTALLED OUTDOORS SHALL BE APPROVED FOR
 OUTDOOR USE. NFPA 58-11 SEC.6.8.1.5. SUBMIT
 MANUFACTURER'S SPECIFICATIONS.
 5) ON THE REQUSTED REGULATOR SPECIFICATIONS IDENTIFY
 THE SPECIFIC MODEL(S) OF THE REGULATOR(S) BEING
 INSTALLED ON EACH SET OF SPECIFICATIONS. WPB AMEND. TO
 FBC SEC. 107.2.1.
 6) SUBMIT ADDITIONAL INFORMATION ON THE INSTALLATION OF
 THE PE PIPE. IS IT BEING INSTALLED UNDER A VEHICULAR
 WAY? THE MINIMUM BURIAL DEPTH OF THE PE PIPING SHALL
 COMPLY WITH NFPA 58-11 SEC. 6.9.4.2. INDICATE THE
 MINIMUM BURIAL DEPTH ON THE PLANS.
 7) NFPA 58-11 - SEC. 6.8.1.6 THE POINT OF DISCHARGE
 FROM THE REQUIRED PRESSURE RELIEF DEVICE ON REGULATED
 EQUIPMENT (REGULATOR & RELIEF VALVE ON TANK) INSTALLED
 OUTSIDE OF BUILDINGS OR OCCUPIABLE STRUCTURES IN FIXED
 PIPING SYSTEMS SHALL BE LOCATED NOT LESS THAN 3 FT (1
 M) HORIZONTALLY AWAY FROM ANY BUILDING OR OCCUPIABLE
 STRUCTURE OPENING BELOW THE LEVEL OF DISCHARGE. SHOW
 THE LOCATION OF ANY BUILDING OPENINGS BELOW THE LEVEL
 OF DISCHARGE.
 8) NFPA 58 - SEC.6.8.1.7 THE POINT OF DISCHARGE SHALL
 ALSO BE LOCATED NOT LESS THAN 5 FT (1.5 M) IN ANY
 DIRECTION AWAY FROM ANY SOURCE OF IGNITION, OPENINGS
 INTO DIRECT-VENT (SEALED COMBUSTION SYSTEM)
 APPLIANCES, OR MECHANICAL VENTILATION AIR INTAKES.SHOW
 THE LOCATION OF ALL SOURCES OF IGNITION.
 9) THE PROPOSED TANKS APPEAR TO BE NEAR A VEHICLE
 TRAFFIC LANE. THE TANKS SHALL BE PROVIDED WITH
 PROTECTION AGAINST UNINTENDED VEHICLE CONTACT, I.E
 BOLLARDS.PLEASE PROVIDE PROTECTION FROM VEHICLE
 CONTACT.
 10) NFPA 58 - SEC. 6.8.2 SELECTION OF PRESSURE
 REGULATORS. - A TWO-STAGE REGULATOR SYSTEM, AN INTEGRAL
 TWO-STAGE REGULATOR, OR A 2 PSI REGULATOR SYSTEM SHALL
 BE REQUIRED ON ALL FIXED PIPING SYSTEMS THAT SERVE 1 /2
 PSIG (3.4 KPAG) APPLIANCE SYSTEMS [NORMALLY OPERATED AT
 11 IN. WATER COLUMN (2.7 KPAG) PRESSURE].
 11) NFPA 58-11 SEC. 6.9.4.6 - AN ELECTRICALLY
 CONTINUOUS CORROSION-RESISTANT TRACER WIRE (MINIMUM AWG
 14) OR TAPE SHALL BE BURIED WITH THE POLYAMIDE OR
 POLYETHYLENE PIPE TO FACILITATE LOCATING THE PIPE.
 (A) ONE END OF THE TRACER WIRE SHALL BE BROUGHT ABOVE
 GROUND AT A BUILDING WALL OR RISER.
 (B) THE TRACER WIRE OR TAPE SHALL NOT BE IN DIRECT
 CONTACT WITH THE POLYAMIDE OR POLYETHYLENE PIPE.
 12) INDICATE ON THE PLANS IF THE CONTAINERS WILL BE
 FILLED ONSITE OR IF IT WILL BE A CHANGOUT PLAN OF
 REPLACING THE EMPTY TANKS WITH FILLED TANKS. IF FILLING
 ONSITE, TRANSFER OPERATIONS SHALL COMPLY WITH NFPA
 58-11 TABLE 6.5.3 FOR REQUIRED DISTANCES.
  
 ADDITIONAL COMMENTS MAY BE PROVIDED ON THE RE-SUBMITTAL
 OF THE ABOVE.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-10-16 Cont ID  
Sent By thunt Date 2017-10-16 Time 14:00 Rev Time 0.00
Received By thunt Date 2017-10-10 Time 09:30 Sent To  
Notes
2017-10-11 09:30:37RESUB ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-10-05 Cont ID  
Sent By tklarge Date 2017-10-05 Time 06:40 Rev Time 0.00
Received By tklarge Date 2017-09-20 Time 13:53 Sent To  
Notes
2017-09-22 13:53:24ROUTED TO FIRE INBOX


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved