Plan Review Details - Permit 17090185
Plan Review Stops For Permit 17090185
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2017-09-13 Cont ID  
Sent By rmcdouga Date 2017-09-13 Time 18:13 Rev Time 0.00
Received By rmcdouga Date 2017-09-13 Time 17:30 Sent To  
Notes
2017-09-13 18:02:52FBC-R4501.19 FINAL INSPECTION. FINAL ELECTRICAL AND
 BARRIER CODE INSPECTION SHALL BE COMPLETED PRIOR TO
 FILLING THE POOL WITH WATER.
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2017-09-27 Cont ID  
Sent By jleahy Date 2017-09-27 Time 13:07 Rev Time 0.00
Received By jleahy Date 2017-09-27 Time 13:07 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2017-09-14 Cont ID  
Sent By tklarge Date 2017-09-14 Time 07:03 Rev Time 0.00
Received By tklarge Date 2017-09-14 Time 07:03 Sent To E
Notes
2017-09-14 07:04:18A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A GAS PERMIT IS REQUIRED FOR A CONTRACTOR TO
 PERFORM THE RELATED WORK. PROVIDE COMPLETE PLANS THAT
 REFLECT THE ENTIRE SCOPE OF GAS WORK TO BE DONE. WPB
 AMEND. TO FBC SEC.107.2.1.
  
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE
 FBC-R, SEC. G2404.3.
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER FBC-FUEL
 GAS SEC. 301.3.
  
 A SEPARATE PERMIT IS REQUIRED FOR THE GAS INSTALLATION.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-09-27 Cont ID  
Sent By jleahy Date 2017-09-27 Time 13:09 Rev Time 0.00
Received By jleahy Date 2017-09-06 Time 16:35 Sent To  
Notes
2017-09-06 16:35:46ROUTED TO ZONING

Review Stop P PLUMBING
Rev No 1 Status P Date 2017-09-14 Cont ID  
Sent By tklarge Date 2017-09-14 Time 07:03 Rev Time 0.00
Received By tklarge Date 2017-09-14 Time 05:55 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2017-09-27 Cont ID  
Sent By jleahy Date 2017-09-13 Time 13:08 Rev Time 0.00
Received By jleahy Date 2017-09-07 Time 15:59 Sent To  
Notes
2017-09-27 13:08:54JL PUT IN SYSTEM FOR NATHAN JLEAHY