Plan Review Stops For Permit 17090016 |
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2017-10-31 |
|
|
Cont ID |
|
Sent By |
J.Walker |
Date |
2017-10-31 |
Time |
|
Rev Time |
0.20 |
Received By |
|
Date |
2017-10-30 |
Time |
|
Sent To |
M |
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
|
|
|
Cont ID |
|
Sent By |
J.Walker |
Date |
2017-09-26 |
Time |
|
Rev Time |
0.20 |
Received By |
|
Date |
2017-09-25 |
Time |
|
Sent To |
M |
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2017-09-06 |
|
|
Cont ID |
|
Sent By |
J.Walker |
Date |
2017-09-06 |
Time |
|
Rev Time |
0.25 |
Received By |
|
Date |
2017-09-05 |
Time |
|
Sent To |
M |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2017-12-14 |
Time |
|
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2017-12-08 |
Time |
14:32 |
Sent To |
|
|
Notes |
2017-12-12 14:32:41 | ROUTED TO CCOLE |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2017-11-21 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2017-11-21 |
Time |
13:54 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2017-11-09 |
Time |
10:33 |
Sent To |
|
|
Notes |
2017-11-13 10:33:13 | RESUB ROUTED TO GJOHNSON |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2017-11-02 |
Time |
|
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2017-10-27 |
Time |
11:42 |
Sent To |
|
|
Notes |
2017-10-30 11:42:34 | RESUB ROUTED TO FIRE INBOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2017-10-24 |
|
|
Cont ID |
|
Sent By |
hmoser |
Date |
2017-10-24 |
Time |
16:59 |
Rev Time |
0.00 |
Received By |
hmoser |
Date |
2017-09-20 |
Time |
14:22 |
Sent To |
|
|
Notes |
2017-09-22 14:22:26 | RESUB ROUTED TO FIRE INBOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2017-09-14 |
|
|
Cont ID |
|
Sent By |
hmoser |
Date |
2017-09-14 |
Time |
13:25 |
Rev Time |
0.00 |
Received By |
hmoser |
Date |
2017-09-01 |
Time |
09:39 |
Sent To |
|
|
Notes |
2017-09-05 09:40:07 | ROUTED TO ZONING |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
5 |
Status |
P |
Date |
2017-12-14 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2017-12-14 |
Time |
09:30 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2017-12-14 |
Time |
09:25 |
Sent To |
I |
|
Notes |
2017-12-14 09:36:13 | MECHANCIAL PROVISIO; | | | | THE SUBMITTED LETTERS FROM THE HOOD DEPOT ENGINEER AND | | THE EOR ALEJANDRO FRANYIE MUST BEAR ORIGNAL SIGNATURES | | AND SEALS- SECTION 61G15- 23.002 FAC. | | A HOLD WILL BE PLACED ON THE CC PENDING RECEIPT OF THE | | LETTERS. | | | | CCOLE- 12/14/17 |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
4 |
Status |
F |
Date |
2017-11-16 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2017-11-16 |
Time |
16:39 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2017-11-16 |
Time |
16:39 |
Sent To |
P |
|
Notes |
2017-11-16 16:43:09 | 4TH REVIEW FBC-2014 MECHANICAL | | PERMIT #170I90016 | | 11/16/17 | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) THE PLANS WERE RESUBMITTED WITHOUT ANY CORRECTIONS | | OR RESPONSES TO THE PREVIOUS MECHANICAL REVIEW | | COMMENTS. I HAVE REPINTED THE COMMENTS BELOW- PLEASE | | COMPLY. | | | | 1) REFER TO SECTION 506.3.11.2 FIELD APPLIED GREASE | | DUCT ENCLOSURE FBC-14 MECHANICAL: "THE SURFACE OF THE | | DUCT SHALL BE CONTINUOUSLY COVERED ON ALL SIDES FROM | | THE POINT AT WHICH THE DUCT ORIGINATES TO THE OUTLET | | TERMINAL." "PARTIAL APPLICATION OF A FIELD-APPLIED | | GREASE DUCT ENCLOSURE SYSTEM SHALL NOT BE INSTALLED FOR | | THE SOLE PURPOSE OF REDUCING CLEARANCES TO COMBUSTIBLES | | AT ISOLATED SECTIONS OF GREASE DUCT." IT APPEARS BY | | THIS SECTION THAT THE DUCT WRAPPING AS SHOWN ON THE | | PLAN IS NOT BEING INSTALLED IN ACCORDANCE WITH THE ASTM | | E 2336 LISTING. ADDITIONAL INFORMATION FROM THE PRODUCT | | MANUFACTURER WILL BE REQUIRED, AS WELL AS EVIDENCE THAT | | THE INSTALLATION AS SHOWN DOES NOT VOID THE UL LISTING. | | PLEASE NOTE THAT SECTION 506.3.6 PERMITS A 3" CLEARANCE | | TO NON-COMBUSTIBLE CONSTRUCTION AND GYPSUM WALL BOARD | | ATTACHED TO NON-COMBUSTIBLE STRUCTURES. | | | | 2) REFER TO SECTION 8.1.3.6 NFPA 96 REGARDING THE | | INLINE FAN: WHERE THE DUCT SYSTEM CONNECTED TO THE FAN | | IS IN AN ENCLOSURE, THE SPACE OR ROOM IN WHICH THE | | EXHAUST FAN IS LOCATED SHALL HAVE THE SAME FIRE | | RESISTANCE RATING AS THE ENCLOSURE. ACCORDING TO THIS | | SECTION, THE FAN MUST BE IN A FIRE-RATED ROOM. | | | | 3) IN RESPONSE TO PREVIOUS REVIEW COMMENT #3, THE HOOD | | DESIGNER IS STATING THAT THE ADDED HEATING AND COOLING | | LOADS OF THE MUA (MAKEUP AIR) DO NOT EXCEED THE | | CAPACITY OF THE AC SYSTEM. PLEASE PROVIDE ACTUAL | | EVIDENCE IN THE FORM OF CALCULATIONS, DETAILS ETC. TO | | SUPPORT AND PROVE THIS CLAIM. | | | | 4) PROVIDE A DETAILL SHOWING HOW GREASE FROM THE INLINE | | FAN WILL BE DISPOSED OF PROPERLY. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | | | | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
F |
Date |
2017-11-02 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2017-11-02 |
Time |
15:44 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2017-11-02 |
Time |
15:44 |
Sent To |
|
|
Notes |
2017-11-02 16:20:50 | 1ST REVIEW FBC-2014 MECHANICAL | | PERMIT #17090016 | | 11/2/17 | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) REFER TO SECTION 506.3.11.2 FIELD APPLIED GREASE | | DUCT ENCLOSURE FBC-14 MECHANICAL: "THE SURFACE OF THE | | DUCT SHALL BE CONTINUOUSLY COVERED ON ALL SIDES FROM | | THE POINT AT WHICH THE DUCT ORIGINATES TO THE OUTLET | | TERMINAL." "PARTIAL APPLICATION OF A FIELD-APPLIED | | GREASE DUCT ENCLOSURE SYSTEM SHALL NOT BE INSTALLED FOR | | THE SOLE PURPOSE OF REDUCING CLEARANCES TO COMBUSTIBLES | | AT ISOLATED SECTIONS OF GREASE DUCT." IT APPEARS BY | | THIS SECTION THAT THE DUCT WRAPPING AS SHOWN ON THE | | PLAN IS NOT BEING INSTALLED IN ACCORDANCE WITH THE ASTM | | E 2336 LISTING. ADDITIONAL INFORMATION FROM THE PRODUCT | | MANUFACTURER WILL BE REQUIRED, AS WELL AS EVIDENCE THAT | | THE INSTALLATION AS SHOWN DOES NOT VOID THE UL LISTING. | | PLEASE NOTE THAT SECTION 506.3.6 PERMITS A 3" CLEARANCE | | TO NON-COMBUSTIBLE CONSTRUCTION AND GYPSUM WALL BOARD | | ATTACHED TO NON-COMBUSTIBLE STRUCTURES. | | | | 2) REFER TO SECTION 8.1.3.6 NFPA 96 REGARDING THE | | INLINE FAN: WHERE THE DUCT SYSTEM CONNECTED TO THE FAN | | IS IN AN ENCLOSURE, THE SPACE OR ROOM IN WHICH THE | | EXHAUST FAN IS LOCATED SHALL HAVE THE SAME FIRE | | RESISTANCE RATING AS THE ENCLOSURE. ACCORDING TO THIS | | SECTION, THE FAN MUST BE IN A FIRE-RATED ROOM. | | | | 3) IN RESPONSE TO PREVIOUS REVIEW COMMENT #3, THE HOOD | | DESIGNER IS STATING THAT THE ADDED HEATING AND COOLING | | LOADS OF THE MUA (MAKEUP AIR) DO NOT EXCEED THE | | CAPACITY OF THE AC SYSTEM. PLEASE PROVIDE ACTUAL | | EVIDENCE IN THE FORM OF CALCULATIONS, DETAILS ETC. TO | | SUPPORT AND PROVE THIS CLAIM. | | | | 4) PROVIDE A DETAILL SHOWING HOW GREASE FROM THE INLINE | | FAN WILL BE DISPOSED OF PROPERLY. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2017-10-24 |
|
|
Cont ID |
|
Sent By |
hmoser |
Date |
2017-10-24 |
Time |
16:58 |
Rev Time |
0.00 |
Received By |
hmoser |
Date |
2017-10-24 |
Time |
16:58 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2017-09-14 |
|
|
Cont ID |
|
Sent By |
hmoser |
Date |
2017-09-14 |
Time |
13:24 |
Rev Time |
0.00 |
Received By |
hmoser |
Date |
2017-09-14 |
Time |
12:51 |
Sent To |
|
|
Notes |
2017-09-14 13:24:39 | PLAN DENIED | | 1) PLEASE INDICATE ON PLAN HOW YOU PLAN ON MEETING THE | | INTENT | | OF SECTION 506.3.11 GREASE DUCT ENCLOSURES WITH INLINE | | FAN. | | WITH OUT WRAPPING THE FAN. | | 2) SOMEONE NEEDS TO REVISE A PLUMBING PAGE FOR GREASE | | DRAIN | | TO GREASE TRAP OFF INLINE FAN. SECTION 107 FBC. | | 3) PLEASE INDICATE ON THE PLAN HOW YOU PLAN ON MEETING | | THE | | INTENT OF SECTION 508.1.1 MAKE UP AIR TEMPERATURE | | 2014 FBC (M) | | 4) ADDRESS ON PLAN IS NOT CORRECT | | | | PLAN REVIEW BY HAROLD MOSER | | [email protected] | | OFFICE 561-805-6732 | | FAX 561-805-6676 | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
N |
Date |
2017-11-21 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2017-11-21 |
Time |
13:53 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2017-11-21 |
Time |
13:53 |
Sent To |
|
|
Notes |
2017-11-21 13:54:04 | PLUMB SHALL BE REVISED UNDER MASTER 16020194/ GPJ |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2017-11-07 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2017-11-07 |
Time |
13:33 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2017-11-07 |
Time |
13:09 |
Sent To |
P |
|
Notes |
2017-11-07 13:33:19 | 1ST REVIEW: FBC 2014 5TH EDITION | | | | PLUMBING COMMENTS: | | | | 1. PLEASE PROVIDE DETAIL SHOWING HOW GREASE WILL BE | | DISPOSED OF FROM THE INLINE FAN, IF THE PLUMBING SYSTEM | | IS BEING REVISED IT SHALL BE UNDER THE MASTER16020194. | | PER WPB AMEND TO FBC 107.2.1 | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | THE PREVIOUSLY REVIEWED SHEETS. | | | | GEORGE JOHNSON | | PLUMBING PLANS EXAMINER | | CITY OF WEST PALM BEACH | | 561-805-6711 | | [email protected] | | |
|
|