Plan Review Details - Permit 17071268
Plan Review Stops For Permit 17071268
Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-08-02 Cont ID  
Sent By tklarge Date 2017-08-02 Time 06:11 Rev Time 0.00
Received By tklarge Date 2017-08-02 Time 05:54 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2017-08-02 Cont ID  
Sent By tklarge Date 2017-08-02 Time 06:10 Rev Time 0.00
Received By tklarge Date 2017-08-02 Time 05:54 Sent To  
Notes
2017-08-02 06:06:221) THE MODEL OF THE DEVICE YOU HAVE HIGHLITED ON THE
 SPECIFICATIONS IS NOT LEAD FREE AS REQUIRED BY THE CITY
 OF WEST PALM BEACH CROSS CONNECTION CONTROL MANUAL AND
 ONLY THE NON-LEAD FREE DEVICE IS NOTED ON THE
 SPECIFICATION SHEET AS BEING ON THE USC LIST OF
 APPROVED DEVICES.
 2) ALL BACKFLOW DEVICES MUST BE LEAD FREE.
 3) ALL BACKFLOW DEVICES MUST BE ON THE UNIVERSITY OF
 SOUTHERN CALIFORNIA?S ( USC ) LIST OF APPROVED DEVICES.
 4) AN IRRIGATION CONTRACTOR CANNOT INSTALL AN APPROVED
 BACKFLOW DEVICE ON A POTABLE WATER LINE.SEE COPY OF
 "STANDARDS FOR CERTIFIED CONTRACTORS" THAT I PLACED IN
 THE PERMIT APPLICATION FILE FROM PALM BEACH COUNTY
 CONTRACTOR LICENSING SECTION FOR SCOPE OF WORK FOR
 IRRIGATION CONTRACTORS. THE BACKFLOW DEEVICE MUST BE
 INSTALLED BY A LICENSED PLUMBING CONTRACTOR.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 CITY OF WEST PALM BEACH
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved