Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2017-08-21 Cont ID  
Sent By rmcdouga Date 2017-08-21 Time 16:42 Rev Time 0.00
Received By rmcdouga Date 2017-08-17 Time 08:28 Sent To P
Notes
2017-08-21 16:48:16R4501.19 FINAL ELECTRICAL AND BARRIER CODE INSPECTION
 SHALL BE COMPLETED PRIOR TO FILLING THE POOL WITH
 WATER.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2017-08-02 Cont ID  
Sent By rmcdouga Date 2017-08-02 Time 08:10 Rev Time 0.00
Received By rmcdouga Date 2017-08-02 Time 07:37 Sent To Z
Notes
2017-08-02 08:10:32PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) ONE SET OF PLANS DOES NOT HAVE THE ENGINEER'S SEAL
 AND THE EMBOSSED SEAL IS ILLEGIBLE ON THE OTHER SET OF
 PLANS. FS 471 & FAC 61G15-23.002
 2) R4501.19 FINAL ELECTRICAL AND BARRIER CODE
 INSPECTION SHALL BE COMPLETED PRIOR TO FILLING THE POOL
 WITH WATER.

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2017-09-13 Cont ID  
Sent By jleahy Date 2017-09-13 Time 11:16 Rev Time 0.00
Received By jleahy Date 2017-09-13 Time 11:16 Sent To I
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2017-08-11 Cont ID  
Sent By jleahy Date 2017-08-11 Time 17:30 Rev Time 0.00
Received By jleahy Date 2017-08-11 Time 17:30 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2017-07-31 Cont ID  
Sent By jleahy Date 2017-07-31 Time 09:03 Rev Time 0.00
Received By jleahy Date 2017-07-31 Time 09:03 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2017-07-27 Cont ID  
Sent By tklarge Date 2017-07-27 Time 05:53 Rev Time 0.00
Received By tklarge Date 2017-07-27 Time 05:53 Sent To  
Notes
2017-07-27 05:53:42THERE IS NO GAS HEATER ON THIS POOL.

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2017-08-02 Cont ID  
Sent By destabro Date 2017-08-02 Time 09:15 Rev Time 0.00
Received By destabro Date 2017-08-02 Time 09:15 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2017-09-13 Cont ID  
Sent By jleahy Date 2017-09-13 Time 11:16 Rev Time 0.00
Received By jleahy Date 2017-09-06 Time 11:38 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-08-22 Cont ID  
Sent By tklarge Date 2017-08-22 Time 06:46 Rev Time 0.00
Received By tklarge Date 2017-08-09 Time 13:00 Sent To  
Notes
2017-08-10 13:00:47RESUB ROUTED TO JLEAHY

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-08-02 Cont ID  
Sent By cpuell Date 2017-08-02 Time 10:14 Rev Time 0.00
Received By cpuell Date 2017-07-24 Time 11:07 Sent To  
Notes
2017-07-25 11:08:08ROUTED TO ZONING

Review Stop P PLUMBING
Rev No 3 Status P Date 2017-09-13 Cont ID  
Sent By jleahy Date 2017-09-13 Time 11:17 Rev Time 0.00
Received By tklarge Date 2017-09-13 Time 05:50 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2017-08-22 Cont ID  
Sent By tklarge Date 2017-08-22 Time 06:46 Rev Time 0.00
Received By tklarge Date 2017-08-22 Time 06:38 Sent To  
Notes
2017-08-22 06:46:29SHT 2 OF 4 - THE PIPING SCHEMATIC SHOWS 2 1/2 INCH
 BRANCH PIPING AND 2 INCH MAIN DRAIN PIPING BUT IN THE
 BOX ON THE SAME PAGE THE SUCTION BRANCH PIPING IS
 CALLED OUT AS 3 INCH AND THE SUCTION TRUNK PIPING IS
 CALLED OUT AS 2 INCH. CLARIFY. 2ND REQUEST.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2017-07-27 Cont ID  
Sent By tklarge Date 2017-07-27 Time 05:52 Rev Time 0.00
Received By tklarge Date 2017-07-27 Time 05:36 Sent To  
Notes
2017-07-27 05:52:54SHT 2 OF 4 - THE PIPING SCHEMATIC SHOWS 2 1/2 INCH
 BRANCH PIPING AND 2 INCH MAIN DRAIN PIPING BUT IN THE
 BOX ON THE SAME PAGE THE SUCTION BRANCH PIPING IS
 CALLED OUT AS 3 INCH AND THE SUCTION TRUNK PIPING IS
 CALLED OUT AS 2 INCH. CLARIFY.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2017-08-02 Cont ID  
Sent By njwira Date 2017-08-02 Time 08:38 Rev Time 0.00
Received By njwira Date 2017-07-25 Time 13:27 Sent To HIST
Notes
***NONE***