Plan Review Details - Permit 17061159
Plan Review Stops For Permit 17061159
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2017-09-19 Cont ID  
Sent By rmcdouga Date 2017-09-19 Time 17:50 Rev Time 0.00
Received By rmcdouga Date 2017-09-19 Time 17:50 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2017-09-01 Cont ID  
Sent By rmcdouga Date 2017-09-01 Time 19:06 Rev Time 0.00
Received By rmcdouga Date 2017-09-01 Time 18:55 Sent To E
Notes
2017-09-01 19:09:35PLAN
 REVIEW COMMENTS
  
 3RD REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) ALTHOUGH YOU ARE ONLY INSTALLING THE SIGNS, FOR THE
 PURPOSE OF DETERMINING THE PERMIT FEES THE COST OF THE
 SIGNS IS REQUIRED TO BE INCLUDED IN THE VALUATION.
 (REPEAT COMMENT.) THE VALUATION FOR THE (2) SIGNS IS
 LOW. FOR PERMITTING PURPOSES THE COST OF THE TWO SIGNS
 IS REQUIRED TO BE INCLUDED IN THE VALUATION. FBC 109.3
 BUILDING PERMIT VALUATION. FOR PERMITTING PURPOSES,
 VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL
 REPLACEMENT VALUE TO INCLUDE STRUCTURAL, ELECTRIC,
 PLUMBING, MECHANICAL, INTERIOR FINISH, RELATIVE SITE
 WORK, ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS,
 OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2017-08-07 Cont ID  
Sent By rmcdouga Date 2017-08-07 Time 06:59 Rev Time 0.00
Received By rmcdouga Date 2017-08-04 Time 19:23 Sent To  
Notes
2017-08-07 06:59:45PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) ALTHOUGH YOU ARE ONLY INSTALLING THE SIGNS, FOR THE
 PURPOSE OF DETERMINING THE PERMIT FEES THE COST OF THE
 SIGNS IS REQUIRED TO BE INCLUDED IN THE VALUATION.
 (REPEAT COMMENT.) THE VALUATION FOR THE (2) SIGNS IS
 LOW. FOR PERMITTING PURPOSES THE COST OF THE TWO SIGNS
 IS REQUIRED TO BE INCLUDED IN THE VALUATION. FBC 109.3
 BUILDING PERMIT VALUATION. FOR PERMITTING PURPOSES,
 VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL
 REPLACEMENT VALUE TO INCLUDE STRUCTURAL, ELECTRIC,
 PLUMBING, MECHANICAL, INTERIOR FINISH, RELATIVE SITE
 WORK, ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS,
 OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2017-07-18 Cont ID  
Sent By rmcdouga Date 2017-07-18 Time 18:04 Rev Time 0.00
Received By rmcdouga Date 2017-07-18 Time 16:58 Sent To  
Notes
2017-07-18 18:04:26PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE VALUATION FOR THE (2) SIGNS IS LOW. FOR
 PERMITTING PURPOSES THE COST OF THE TWO SIGNS IS
 REQUIRED TO BE INCLUDED IN THE VALUATION. FBC 109.3
 BUILDING PERMIT VALUATION. FOR PERMITTING PURPOSES,
 VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL
 REPLACEMENT VALUE TO INCLUDE STRUCTURAL, ELECTRIC,
 PLUMBING, MECHANICAL, INTERIOR FINISH, RELATIVE SITE
 WORK, ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS,
 OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2017-09-06 Cont ID  
Sent By jleahy Date 2017-09-06 Time 11:54 Rev Time 0.00
Received By jleahy Date 2017-09-06 Time 11:54 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2017-08-04 Cont ID  
Sent By jleahy Date 2017-08-04 Time 16:26 Rev Time 0.00
Received By jleahy Date 2017-08-04 Time 16:26 Sent To B
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2017-07-18 Cont ID  
Sent By jleahy Date 2017-07-18 Time 10:16 Rev Time 0.00
Received By jleahy Date 2017-07-18 Time 09:21 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2017-09-19 Cont ID  
Sent By rmcdouga Date 2017-09-19 Time 17:50 Rev Time 0.00
Received By rmcdouga Date 2017-09-18 Time 09:34 Sent To  
Notes
2017-09-19 09:34:52RESUB ROUTED TO RMCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2017-09-06 Cont ID  
Sent By jleahy Date 2017-09-06 Time 11:54 Rev Time 0.00
Received By jleahy Date 2017-08-17 Time 10:26 Sent To  
Notes
2017-08-18 10:26:12RESUB ROUTED TO ESCHNEIDER VIA ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-08-07 Cont ID  
Sent By rmcdouga Date 2017-08-07 Time 06:59 Rev Time 0.00
Received By rmcdouga Date 2017-07-25 Time 11:49 Sent To  
Notes
2017-07-26 11:49:57RESUB ROUTED TO ESCHNEIDER VIA ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-07-18 Cont ID  
Sent By rmcdouga Date 2017-07-18 Time 18:04 Rev Time 0.00
Received By rmcdouga Date 2017-06-26 Time 11:15 Sent To  
Notes
2017-06-27 11:15:25ROUTED TO ZONING

Review Stop Z ZONING
Rev No 3 Status P Date 2017-08-30 Cont ID  
Sent By eschneid Date 2017-08-30 Time 14:26 Rev Time 0.25
Received By eschneid Date 2017-08-30 Time 14:20 Sent To B
Notes
2017-08-21 10:21:52ROUTED TO ERIC SCHNEIDER

Review Stop Z ZONING
Rev No 2 Status F Date 2017-08-04 Cont ID  
Sent By eschneid Date 2017-08-04 Time 11:59 Rev Time 0.25
Received By eschneid Date 2017-08-04 Time 11:59 Sent To B
Notes
2017-08-04 12:03:10FAILED
  
 1) THE DRAWING ON SHEET 1.03 SHOWS THE SIGN 1/2 INCH
 OFF THE WALL AND THE SIGN THICKNESS AS 1.25 INCHES;
 HOWEVER THE ENGINEER STAMPED DRAWINGS SHOW THE SIGN 2
 INCHES OFF THE WALL AND 3 INCHES THICK. ALL PLANS SHALL
 SHOW THE SAME CONDITIONS.
  
 2) SIGN SIZE MEETS CODE.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]
2017-07-27 11:47:02ROUTED TO ERIC SCHNEIDER

Review Stop Z ZONING
Rev No 1 Status P Date 2017-07-17 Cont ID  
Sent By eschneid Date 2017-07-17 Time 16:25 Rev Time 0.25
Received By eschneid Date 2017-07-17 Time 16:25 Sent To E
Notes
2017-06-29 17:41:52ROUTED TO ERIC SCHNEIDER