Plan Review Details - Permit 17060767
Plan Review Stops For Permit 17060767
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2017-07-19 Cont ID  
Sent By cthroop Date 2017-07-19 Time 15:38 Rev Time 0.00
Received By cthroop Date 2017-07-19 Time 15:38 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2017-07-20 Cont ID  
Sent By jleahy Date 2017-07-20 Time 14:52 Rev Time 0.00
Received By jleahy Date 2017-07-20 Time 14:52 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2017-07-20 Cont ID  
Sent By gjohnson Date 2017-07-20 Time 14:09 Rev Time 0.00
Received By gjohnson Date 2017-07-20 Time 14:09 Sent To  
Notes
2017-07-20 14:10:51GAS PLAN REVIEW
 A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE
 REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK.
 PROVIDE COMPLETE PLANS, APPLIANCE/ EQUIPMENT
 SPECIFICATIONS AND GAS RISER THAT REFLECT THE ENTIRE
 SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC.
 107.2.1.
  
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE
 FBC-R, SEC. G2404.3.
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER FBC-FUEL
 GAS SEC. 301.3.
  
 A SEPARATE PERMIT IS REQUIRED FOR THE GAS INSTALLATION.
  

Review Stop HIST HISTORICAL
Rev No 1 Status N Date 2017-07-20 Cont ID  
Sent By skennedy Date 2017-07-20 Time 15:34 Rev Time 0.00
Received By skennedy Date 2017-07-20 Time 15:34 Sent To  
Notes
2017-07-20 15:35:16INTERIOR ONLY

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-07-20 Cont ID  
Sent By skennedy Date 2017-07-20 Time 15:35 Rev Time  
Received By skennedy Date   Time   Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2017-07-14 Cont ID  
Sent By skennedy Date 2017-07-14 Time 15:21 Rev Time 0.00
Received By skennedy Date 2017-07-14 Time 15:21 Sent To  
Notes
2017-07-14 15:52:151ST REVIEW: FBC 2014 5TH ED. RESIDENTIAL
 1ST REVIEW FBC 2014 EXISTING BUILDING
  
 PLANS ARE INCOMPLETE PER FBC 107.
  
 A MECHANICAL DESIGN MUST BE PROVIDED FOR THE PROCESSING
 OF THIS REVISION. DEPENDING ON FORTHCOMING
 DETERMINATIONS, AN ENERGY SUBMITTAL AND EQUIPMENT
 SIZING CALCULATION MAY BE REQUIRED.
  
 STEVEN KENNEDY, CBO
 ASSISTANT BUILDING OFFICIAL
 (561) 805-6710
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2017-07-20 Cont ID  
Sent By gjohnson Date 2017-07-20 Time 13:53 Rev Time 0.00
Received By gjohnson Date 2017-07-20 Time 13:53 Sent To  
Notes
2017-07-20 14:08:401ST REVIEW: FBC 2014 5TH EDITION
  
 PROVISO;
 PROVIDE CODE COMPLIANT PLUMBING RISER DIAGRAM BEFORE
 FIRST ROUGH INSPECTION.
  
 COMMENTS
 1. THE SHOWER SHALL CONNECT TO WET VENT SEPARATELY FROM
 WC PER FBC RES P3108.1
 2. THE TUB IS MISSING FROM THE RISER DIAGRAM AND SHALL
 CONNECT TO WET VENT SEPARATELY FROM WC PER FBC RES
 P3108.1
 3. PROVIDE SCOPE OF PLUMBING WORK. PER WPB AMEND TO FBC
 107.2.1
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved