Review Stop E ELECTRICAL
Rev No 1 Status P Date 2017-12-29 Cont ID  
Sent By jleahy Date 2017-12-29 Time 17:08 Rev Time 0.00
Received By jleahy Date 2017-12-29 Time 17:07 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date   Cont ID  
Sent By   Date 2018-02-20 Time   Rev Time 0.00
Received By lmarchan Date 2018-02-07 Time 14:01 Sent To  
Notes
2018-02-08 14:01:31RESUB ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-12-29 Cont ID  
Sent By jleahy Date 2017-12-29 Time 17:08 Rev Time 0.00
Received By jleahy Date 2017-12-14 Time 11:30 Sent To  
Notes
2017-12-15 11:30:21RESUB OF REVISION ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2017-06-15 Time   Rev Time 0.00
Received By lmarchan Date 2017-06-13 Time 11:33 Sent To  
Notes
2017-06-14 11:33:55REVISION ROUTED TO CCOLE

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2018-02-20 Cont ID  
Sent By ccole Date 2018-02-20 Time 16:58 Rev Time 0.00
Received By ccole Date 2018-02-20 Time 16:58 Sent To I
Notes
2018-02-20 17:02:353RD REVIEW FBC-2014 MECHANICAL
 REVISION #17060532
 MASTER #16041147
 12/28/17
  
 PLAN REVIEW RESULTS: DENIED.
  
 COMMENTS #1 AND #3 FROM THE 1ST AND 2ND REVIEWS WERE
 NOT ADDRESSED AND STILL EXIST. I HAVE REPRINTED THE
 COMMENTS BELOW- PLEASE COMPLY.
  
 1) THE AC CONTRACTOR WHO PREPARED THE REVISED
 MECHANICAL PLAN (KAREN OLIVER) SHALL SUBMIT A
 SUB-PERMIT APPLICATION AS REQUIRED BY SECTION 105.3.1.2
 ITEM #3 WPB AMENDMENTS TO THE FBC-10 BUILDING. IF SHE
 IS NOT THE INSTALLING MECHANICAL CONTRACTOR ON THE
 PROJECT THAN SHE CANNOT BE THE MECHANICAL DESIGNER.
  
 3) REFER TO SECTION 602.1: THE NEW AC CLOSETS ARE
 PLENUM ENCLOSURES AND MUST BE CONTRUCTED IN ACCORDANCE
 WITH SECTION 602.2. PLEASE NOTE NON-COMBUSTIBLE CLOSET
 DOORS ARE REQUIRED.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 CCO

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2017-12-28 Cont ID  
Sent By ccole Date 2017-12-28 Time 12:05 Rev Time 0.00
Received By ccole Date 2017-12-28 Time 12:05 Sent To E
Notes
2017-12-28 12:13:032ND REVIEW FBC-2014 MECHANICAL
 REVISION #17060532
 MASTER #16041147
 12/28/17
  
 PLAN REVIEW RESULTS: DENIED.
  
 COMMENT #1 AND #3 FROM THE 1ST REVIEW WERE NOT
 ADDRESSED AND STILL EXIST. I HAVE REPRINTED THOSE
 COMMENTS BELOW- PLEASE COMPLY.
  
 ONLY ONE SET OF ENERGY CALCULATIONS AND AC CALCULATIONS
 WERE RESUBMITTED. PLEASE PROVIDE THE SECOND COPIES.
  
 1) THE AC CONTRACTOR WHO PREPARED THE REVISED
 MECHANICAL PLAN SHALL SUBMIT A SUB-PERMIT APPLICATION
 AS REQUIRED BY SECTION 105.3.1.2 ITEM #3 WPB AMENDMENTS
 TO THE FBC-10 BUILDING.
  
 3) REFER TO SECTION 602.1: THE NEW AC CLOSETS ARE
 PLENUM ENCLOSURES AND MUST BE CONTRUCTED IN ACCORDANCE
 WITH SECTION 602.2. PLEASE NOTE NON-COMBUSTIBLE CLOSET
 DOORS ARE REQUIRED.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2017-06-15 Cont ID  
Sent By ccole Date 2017-06-15 Time 10:36 Rev Time 0.00
Received By ccole Date 2017-06-15 Time 10:36 Sent To  
Notes
2017-06-15 11:37:221ST REVIEW FBC-2014 MECHANICAL
 PERMIT #17060532
 6/15/17
  
 RESULTS: DENIED.
  
 1) THE AC CONTRACTOR WHO PREPARED THE REVISED
 MECHANICAL PLAN SHALL SUBMIT A SUB-PERMIT APPLICATION
 AS REQUIRED BY SECTION 105.3.1.2 ITEM #3 WPB AMENDMENTS
 TO THE FBC-10 BUILDING.
  
 2) THE ENGINEER OF RECORD MAURICE EVAN LORD PE WHO DID
 THE ORIGINAL MECHANICAL DESIGN ON SHEET E-1 MUST
 PROVIDE REVISED ELECTRICAL PLANS TO ACCOMODATE THE NEW
 AC SYSTEM. BECAUSE LORD IS STILL THE MECHANICAL
 DESIGNER OF RECORD, HE MUST REVIEW AND APPROVE THE NEW
 AC DRAWINGS.
  
 3) REFER TO SECTION 602.1: THE NEW AC CLOSETS ARE
 PLENUM ENCLOSURES AND MUST BE CONTRUCTED IN ACCORDANCE
 WITH SECTION 602.2. PLEASE NOTE NON-COMBUSTIBLE CLOSET
 DOORS ARE REQUIRED.
  
 4) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 CONDENSATE PUMPS.
  
 5) SUBMIT TWO COPIES OF THE MIAMI-DADE NOA FOR THE
 CONDENSER TIE DOWN CLIPS AND LIST THE NOA NUMBER BY THE
 CONDENSER DETAIL ON SHEET M.1.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved