Plan Review Details - Permit 17060328
Plan Review Stops For Permit 17060328
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2017-10-24 Cont ID  
Sent By shill Date 2017-10-24 Time 09:58 Rev Time 0.00
Received By shill Date 2017-10-24 Time 09:58 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2017-08-11 Cont ID  
Sent By shill Date 2017-08-11 Time 13:21 Rev Time 0.00
Received By shill Date 2017-08-11 Time 12:40 Sent To  
Notes
2017-08-11 13:21:21****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. G101, THE PROPOSED NEW 3 HOUR WALL IS NOT SHOWN ON
 THIS PLAN. REVISE TO INCLUDE, AND ALSO INCLUDE ANY
 OTHER RATINGS REQUIRED DUE TO INTERSECTION, SEE
 COMMENTS FOR 17060343.
  
 2ND REVIEW, RATING DUE TO INTERSECTION IS NOT SHOWN. I
 CHECKED SHEET G101 FILED WITH REVISION 17060343 WHICH
 WAS SUBMITTED ON THE SAME DAY, AND WAS GOING TO VOID
 THE SHEET FILED WITH THIS REVISION IF THE OTHER ONE HAD
 THE REQUESTED CHANGE. HOWEVER, THERE IS ANOTHER ISSUE
 WITH THIS PAGE WHICH AFFECTS BOTH REVISIONS.
  
 SHEET G101 SUBMITTED WITH REVISION NUMBER 17060343 IS
 SIGNED & SEALED DATED 7/2/17. IT INCLUDES REVISIONS
 1,2,4,5,10,30 AND 32 DATED 6/6/17.
  
 SHEET G101 SUBMITTED WITH REVISION NUMBER 17060328 IS
 SIGNED & SEALED DATED 7/2/17. IT INCLUDES REVISIONS 1,
 10, AND 11.
  
 IT IS NOT CLEAR WHY ONE IS UP TO REVISION 32 AND HAS AN
 EARLIER DATE THAN THE ONE WHICH INCLUDES REVISION 11.
 WHY IS REVISION 11 NOT INCLUDED IN THE VERSION
 SUBMITTED WITH 17060343? WHY DID THE ARCHITECT SIGN AND
 SEAL TWO DIFFERENT SHEETS G101? (THESE ARE HYPOTHETICAL
 QUESTIONS, NO NEED TO RESPOND IN WRITING.)
  
 PLEASE CORRELATE. IT IS OK, BUT NOT PREFERABLE, FOR THE
 SAME SHEET TO BE SUBMITTED WITH TWO DIFFERENT
 REVISIONS, BUT THEY DO NEED TO BE THE SAME. BOTH SHEETS
 SHOULD BE THE SAME AND INCLUDE ALL INFORMATION WHICH
 WAS INCORPORATED INTO ALL REVISIONS.
  
 PLEASE VERIFY THAT OTHER SHEETS ARE ALSO CONSISTENT.
  
 2-3. OK
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2017-06-26 Cont ID  
Sent By shill Date 2017-06-26 Time 10:23 Rev Time 0.00
Received By shill Date 2017-06-26 Time 10:23 Sent To  
Notes
2017-06-26 10:23:39****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. G101, THE PROPOSED NEW 3 HOUR WALL IS NOT SHOWN ON
 THIS PLAN. REVISE TO INCLUDE, AND ALSO INCLUDE ANY
 OTHER RATINGS REQUIRED DUE TO INTERSECTION, SEE
 COMMENTS FOR 17060343.
  
 2. IT IS NOT CLEAR WHAT CHANGED; PROVIDE A NARRATIVE OF
 SIGNIFICANT CHANGES, FBC 107.
  
 3. A105B, REVISE PLAN TO INCLUDE OCCUPANT LOAD FOR THE
 OFFICE, FBC 1004, AND WHO WILL USE THIS OFFICE. REVISE
 OTHER AFFECTED PAGES (SUCH AS CODE SUMMARY PAGE).
  
 OCCUPANT LOAD WAS ON THE PLAN, ADDED AS A RESULT OF A
 PREVIOUS PLAN REVIEW COMMENT, AND WAS REMOVED. IT IS
 NOT CLEAR WHY THIS WAS REMOVED; THIS IS REQUIRED TO
 SHOW COMPLIANCE WITH THE ACCESSIBILITY EXEMPTION TO
 VERTICAL ACCESSIBLITY.
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2017-07-13 Cont ID  
Sent By dharvey Date 2017-07-13 Time 12:19 Rev Time 0.00
Received By jleahy Date 2017-07-13 Time 12:19 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2017-07-05 Cont ID  
Sent By wjolin Date 2017-07-05 Time 11:47 Rev Time 0.00
Received By wjolin Date 2017-07-05 Time 11:47 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2017-10-24 Cont ID  
Sent By shill Date 2017-10-24 Time 10:12 Rev Time 0.00
Received By shill Date 2017-10-11 Time 11:38 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status P Date 2017-08-22 Cont ID  
Sent By tklarge Date 2017-08-22 Time 13:37 Rev Time 0.00
Received By tklarge Date 2017-08-07 Time 16:42 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-08-06 Cont ID  
Sent By hmoser Date 2017-08-06 Time 12:44 Rev Time 0.00
Received By hmoser Date 2017-06-20 Time 16:55 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2017-08-06 Cont ID  
Sent By hmoser Date 2017-08-06 Time 12:44 Rev Time 0.00
Received By hmoser Date 2017-08-06 Time 12:37 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2017-08-22 Cont ID  
Sent By tklarge Date 2017-08-22 Time 13:37 Rev Time 0.00
Received By tklarge Date 2017-08-22 Time 13:27 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2017-06-28 Cont ID  
Sent By tklarge Date 2017-06-28 Time 09:37 Rev Time 0.00
Received By tklarge Date 2017-06-28 Time 09:26 Sent To  
Notes
2017-06-28 09:37:071) THERE IS A SUBMITTED PLUMBING SHEET P106 THAT IS NOT
 INCLUDED IN THE NARRATIVE.THERE IS A CLOUDED AREA ON
 DETAIL #3 ON THE PLAN AT CORRIDOR #1109A. INDICATE IN
 THE NARRATIVE WHAT THE CHANGE IS FOR THIS AREA. WPB
 AMEND. TO FBC SEC. 107.2.1.
 2) SHT. 210B - THE NARRATIVE REFERS TO A HOT WATER
 RETURN LINE ON THE TENTH FLOOR. IDENTIFY THE RETURN
 LINE BY CLOUDING AND SHOW THE PIPE SIZE AND REQUIRED
 INSULATION THICKNESS.WPB AMEND. TO FBC SEDC. 107.2.1.
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2017-10-24 Cont ID  
Sent By shill Date 2017-10-24 Time 10:12 Rev Time 0.00
Received By shill Date 2017-10-24 Time 10:12 Sent To  
Notes
2017-10-24 10:08:32A SHEETS OK (SH)
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2017-08-22 Cont ID  
Sent By tklarge Date 2017-08-22 Time 14:02 Rev Time 0.00
Received By tklarge Date 2017-08-22 Time 13:50 Sent To  
Notes
2017-08-22 14:02:42SIGNATURES CONFIRMED.T.LARGE