|
 |
 |
 |
 |
 |
Plan Review Details - Permit 17040376
Plan Review Stops For Permit 17040376 |
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2017-06-01 |
Time |
|
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2017-05-23 |
Time |
10:08 |
Sent To |
|
|
Notes |
2017-05-24 10:08:47 | RESUB ROUTED TO CCOLE |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2017-04-17 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2017-04-17 |
Time |
16:47 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2017-04-12 |
Time |
10:18 |
Sent To |
|
|
Notes |
2017-04-13 10:20:50 | ROUTED TO MECH INBOX |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2017-06-01 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2017-06-01 |
Time |
15:34 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2017-06-01 |
Time |
12:34 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2017-04-17 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2017-04-17 |
Time |
16:49 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2017-04-17 |
Time |
16:49 |
Sent To |
|
|
Notes |
2017-04-17 17:08:31 | 1ST REVIEW FBC-2014 MECHANICAL | | PERMIT #17040376 | | 4/17/17 | | | | 1) PROVIDE WIND LOAD ENGINEERING FOR INSTALLATION OF | | THE ROOF TOP UNIT- SECTION 301.15. | | | | 2) CONTRACTOR PLANS SHALL BE DRAWN TO SCALE AND PROVIDE | | CLEAR DETAILS. THE PLANS SHALL ALSO BE SIGNED BY THE | | PERSON WHO PREPARED THE DRAWING- SECTION 107.2.1 WPB | | AMENDMENTS TO THE FBC. | | | | 3) PROVIDE AN EQUIPMENT SCHEDULE ON THE PLANS THAT | | INDICATES THE MAKE AND MODEL OF THE EQUIPMENT, THE | | COOLING AND HEATING CAPACITIES, THE TOTAL SUPPLY CFMS, | | AND THE EFFICIENCY RATING. | | | | 4) SUBMIT AN AHRI CERTIFICATE FOR THE SYSTEM | | | | 5) PROVIDE SEPARATE LAYOUT PLANS FOR THE FIRST AND | | SECOND FLOOR THAT IDENTIFY THE ROOMS, DUCT SIZES, | | SUPPLY DIFFUSER AND RETURN GRILL SIZES, AND CFMS AT | | EACH LOCATION. | | | | 6) INDICATE THE TYPE OF DUCTWORK TO BE INSTALLED AND | | PROVIDE SUPPORT AND CONNECTION DETAILS ON THE PLAN PER | | SMACNA STANDARDS. | | | | 7) PROVIDE AN AIR DEVICE SCHEDULE ON THE PLANS. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | [email protected] | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |