Plan Review Details - Permit 17030975
Plan Review Stops For Permit 17030975
Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-04-06 Cont ID  
Sent By tklarge Date 2017-04-06 Time 08:41 Rev Time 0.00
Received By tklarge Date 2017-03-30 Time 14:07 Sent To  
Notes
2017-03-31 14:07:42RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-03-28 Cont ID  
Sent By tklarge Date 2017-03-28 Time 08:28 Rev Time 0.00
Received By tklarge Date 2017-03-24 Time 13:04 Sent To  
Notes
2017-03-27 13:05:06ROUTED TO PLUMBING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2017-04-06 Cont ID  
Sent By tklarge Date 2017-04-06 Time 08:41 Rev Time 0.00
Received By tklarge Date 2017-04-06 Time 08:35 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2017-03-28 Cont ID  
Sent By tklarge Date 2017-03-28 Time 08:28 Rev Time 0.00
Received By tklarge Date 2017-03-28 Time 05:43 Sent To  
Notes
2017-03-28 06:23:531) SUBMIT 2 COPIES OF THE MANUFACTURER'S INSTALLATION
 INSTRUCTIONS FOR THIS SYSTEM. WPB AMEND. TO FBC SEC.
 107.2.1, 2014 FBC-PLUMBING SEC.303.2.
 2) ALL PLASTIC PIPE, FITTINGS AND COMPONENTS SHALL
 COMPLY WITH NSF 14. 2014 FBC-PLUMBING SEC.303.3.
 3) ALL PLUMBING PRODUCTS AND MATERIALS SHALL BE LISTED
 BYA THIRD-PARTY CEERTIFICATION AGENCY AS COMPLYING WITH
 THE REFERENCED STANDARDS. PRODUCTS AND MATERIALS SHALL
 BE IDENTIFIED IN ACCORDANCE WITH FPC SEC. 303.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved