Plan Review Details - Permit 17030673
Plan Review Stops For Permit 17030673
Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-04-05 Cont ID  
Sent By tklarge Date 2017-04-05 Time 11:24 Rev Time 0.00
Received By tklarge Date 2017-03-29 Time 12:34 Sent To  
Notes
2017-03-30 12:34:33RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-03-18 Cont ID  
Sent By tklarge Date 2017-03-18 Time 03:39 Rev Time 0.00
Received By tklarge Date 2017-03-16 Time 15:04 Sent To  
Notes
2017-03-16 15:05:07PLUMB <5K

Review Stop P PLUMBING
Rev No 2 Status P Date 2017-04-05 Cont ID  
Sent By tklarge Date 2017-04-05 Time 11:24 Rev Time 0.00
Received By tklarge Date 2017-04-05 Time 06:20 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2017-03-18 Cont ID  
Sent By tklarge Date 2017-03-18 Time 03:39 Rev Time 0.00
Received By tklarge Date 2017-03-18 Time 02:57 Sent To  
Notes
2017-03-18 03:15:521) ONE OF THE SUBMITTED DRAWINGS IS DONE IN PENCIL.
 DRAWINGS DONE IN PENCIL ARE NOT ACCEPTABLE BY THE
 BUILDING DIVISION AS THE MEDIUM IS NOT PERMANENT. I
 PERSONALLY HAVE BROUGHT THE ISSUE OF PENCILED DRAWINGS
 TO THE ATTENTION OF YOUR OFFICE STAFF TOO MANY TIMES
 AND IT IS STILL OCCURRING. COPIES WILL NOT BE MADE HERE
 AND THE DRAWING WILL BE REJECTED FOR THIS VERY ISSUE SO
 IT WOULD BENEFIT ALL INVOLVED IF YOUR OFFICE STAFF IS
 REMINDED OF THIS AND FOLLOW PROTOCOL.
 2) PLACE A NOTE ON THE PLANS THAT THE SLAB REPAIR WILL
 BE DONE BY OTHERS UNDER A SEPARATE PERMIT. THE PLUMBING
 PERMIT WILL NOT BE FINALED UNTIL A BUILDING PERMIT
 APPLICATION IS SUBMITTED ALONG WITH A SLAB REPAIR
 DETAIL AND THE PERMIT IS ISSUED. WPB AMEND. TO FBC SEC.
 107.2.1.
 3) SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION MANUAL FOR THE PEDICURE CHAIRS.WPB AMEND.
 TO FBC SEC. 107.2.1.
 4) THE REPLACEMENT OF THE SHOWER VALVE SHALL COMPLY
 WITH 2014 FBC-PLUMBING SEC.424.3.
 5) IDENTIFY THE TYPE OF FIXTURES ON THE FLOOR PLAN AND
 THE SANITARY RISER.WPB AMEND. TO FBC SEC. 107.2.1.
 6) THE SOIL SHALL BE TREATED WITH A TERMITICIDE AFTER
 THE PIPE INSTALLATION AND BACKFILLING IS COMPLETE. 2014
 FBC-BUILDING SEC. 1816.1. A CERTIFICATE FROM THE
 COMPANY WHO APPLIED THE CHEMICALS SHALL BE ON THE
 JOBSITE CONFIRMING THE TERMITICIDE HAS BEEN APPLIED.
 7) SIZE ALL SECTIONS OF THE PIPE ON THE SANITARY RISER.
 WPB AMEND TO FBC SEC. 107.2.1.
 8) SUBMIT A WATER RISER DIAGRAM FOR REVIEW. WPB AMEND.
 TO FBC SEC. 107.2.1, 107.3.5.1.3.
 9) WHAT TYPE OF BUSINESS WAS PREVIOUSLY IN THIS SPACE?
 IS THERE CURRENTLY AN ACTIVE BUSINESS IN THIS SPACE AND
 IF SO WHAT IS IT? THERE IS A POSSIBILITY THIS COULD BE
 A CHANG OF OCCUPANCY AND THE PLANS ARE TOO VAGUE TO
 MAKE AN EVALUATION.
  
 DUE TO THE LACK OF INFORMATION ON THE SUBMITTAL AND
 PLANS A THOROUGH AND COMPREHENSIVE PLAN REVIEW COULD
 NOT BE PERFORMED AND ADDITIONAL REVIEW COMMENTS MAY BE
 GENERATED ON THE RESUBMITTAL.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved