Plan Review Details - Permit 16120868
Plan Review Stops For Permit 16120868
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2017-01-31 Cont ID  
Sent By jgomez Date 2017-01-31 Time 10:24 Rev Time 0.00
Received By jgomez Date 2017-01-31 Time 10:23 Sent To  
Notes
2017-01-31 10:28:34BUILDING REVIEW APPROVED WITH PROVISO:
  
 1- PROVIDE PRODUCT APPROVAL FOR CASEMENT WINDOWS THAT
 MEET THE DESIGN PRESSURES CALCULATED BY THE ENGINEER OF
 RECORD.
  
 2- PROVIDE PRODUCT APPROVAL FOR CASEMENT WINDOW SIZE
 THAT MEETS THE SIZE SPECIFIED ON WINDOW SCHEDULE FOR
 WINDOW #7 AND #8.
  
 3- ENGINEER OF RECORD TO REVIEW AND APPROVE IN WRITING
 PRODUCT APPROVALS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2017-01-30 Cont ID  
Sent By jgomez Date 2017-01-30 Time 11:41 Rev Time 0.00
Received By jgomez Date 2017-01-30 Time 11:41 Sent To  
Notes
2017-01-30 12:20:41RESIDENTIAL (R3) ALTERATION, SECOND BUILDING REVIEW
 COMMENTS.
 CODE: FBC 5TH EDITION (2014).
  
 1- WINDOW CORNER DETAIL IS INCORRECT. PER MEETING WITH
 CONTRACTOR, THE CORNER IS CONCRETE BLOCK CONSTRUCTION
 NOT WOOD FRAMED CONSTRUCTION. REVISE AS REQUIRED TO
 MATCH ACTUAL CONDITIONS. SEC. R301.1 FBC-RESIDENTIAL,
 5TH EDITION (2014).
  
 2- STRUCTURAL CORNER DETAIL IS NOT CLEAR. A) WHAT ARE
 THE #6 TEK SCREW ATTACHING TO THE 3" STEEL COLUMN?.
 WHAT IS THE SIMPSON SPH4Z HOLDING? ENGINEER TO PROVIDE
 CALCULATIONS SHOWING HOW THE STRUCTURAL BUCK DETAIL IS
 TRANSFERRING THE LOADS TO THE 3" STEEL COLUMN? SEC.
 107.2.1.3 CITY AMENDMENTS.
  
 3- WINDOW SCHEDULE IS NOT CLEAR. CONTRACTOR SAYS THAT
 THERE ARE ONLY CASEMENT WINDOWS. THERE ARE NOT FIXED
 AND SINGLE HUNG WINDOWS. SEC. 107.2.1 CITY AMENDMENTS.
  
 4- PROVIDE PRODUCT APPROVAL (2 COPIES) FOR CASEMENT
 WINDOWS AS REQUIRED BY FAC61G20-3.002(33).
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (5610805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-12-27 Cont ID  
Sent By cthroop Date 2016-12-27 Time 15:18 Rev Time 0.00
Received By cthroop Date 2016-12-27 Time 15:06 Sent To  
Notes
2016-12-27 15:22:11BUILDING PLAN REVIEW
 2014 FLORIDA BUILDING CODE W/2010 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1
 ADMINISTRATION
  
 CHRISTOPHER S. THROOP, C.B.O.
 BUILDING PLANS EXAMINER, PX3169
 CONSTRUCTION SERVICES DIVISION
 TEL: 561-805-6726
 FAX: 561-805-6676
  
 1ST REVIEW
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 1. PROVIDE PRODUCT APPROVALS FOR WINDOW MULLIONS.
 2. PROVIDE DESIGN WIND LOADS FOR WINDOW OPENINGS.
 3. THE INDIVIDUAL TAKING RESPONSIBILITY SHALL PROVIDE
 THEIR PRINTED NAME AND SIGNATURE ON THE PLAN PER FBC
 107.
  
 FBC 107.3.4 - PROVIDE PRODUCT APPROVALS FOR THOSE
 PRODUCTS WHICH ARE REGULATED BY
 FAC RULE 9N-3 REVIEWED AND APPROVED IN WRITING BY THE
 DESIGNER OF RECORD. SPECIFICALLY, PROVIDE ROOFING,
 WINDOW, AND DOOR SUBMITTALS.
  
 FBC 107.3.5.3 - PROVIDE WIND DESIGN LOADS/DESIGN
 PRESSURES PURSUANT TO FBC-R301.2.
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2017-01-31 Cont ID  
Sent By jgomez Date 2017-01-31 Time 10:28 Rev Time 0.00
Received By jgomez Date 2017-01-31 Time 10:24 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-01-30 Cont ID  
Sent By jgomez Date 2017-01-30 Time 12:39 Rev Time 0.00
Received By jgomez Date 2017-01-30 Time 11:41 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-12-27 Cont ID  
Sent By cthroop Date 2016-12-27 Time 15:06 Rev Time 0.00
Received By cthroop Date 2016-12-27 Time 13:44 Sent To  
Notes
2016-12-27 13:44:44BLDG -$5000


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved