Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2016-12-14 Cont ID  
Sent By ccole Date 2016-12-14 Time 09:36 Rev Time  
Received By ccole Date   Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2016-12-01 Cont ID  
Sent By ccole Date 2016-12-14 Time 09:36 Rev Time 0.00
Received By pleduc Date 2016-12-01 Time 14:11 Sent To M
Notes
2016-12-01 14:15:41THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
  
 1) THERE ARE 43 NEW HEADS AND NEW PIPING THAT IS MORE
 THAN RELOCATED DROPS.
  
 PER NFPA 13, ISOLATE AND TEST AT 200PSI FOR 2 HRS.
  
 24.2 ACCEPTANCE REQUIREMENTS.
 24.2.1* HYDROSTATIC TESTS.
 24.2.1.1 UNLESS PERMITTED BY 24.2.1.2 THROUGH 24.2.1.8,
 ALL PIPING AND ATTACHED APPURTENANCES SUBJECTED TO
 SYSTEM WORKING PRESSURE SHALL BE HYDROSTATICALLY TESTED
 AT 200 PSI (13.8 BAR) AND SHALL MAINTAIN THAT PRESSURE
 WITHOUT LOSS FOR 2 HOURS.
 24.2.1.2 PORTIONS OF SYSTEMS NORMALLY SUBJECTED TO
 SYSTEM WORKING PRESSURES IN EXCESS OF 150 PSI (10.4
 BAR) SHALL BE TESTED AS DESCRIBED IN 24.2.1.1, AT A
 PRESSURE OF 50 PSI (3.5 BAR) IN EXCESS OF SYSTEM
 WORKING PRESSURE.
 24.2.1.4 MODIFICATIONS AFFECTING 20 OR FEWER SPRINKLERS
 SHALL NOT REQUIRE TESTING IN EXCESS OF SYSTEM WORKING
 PRESSURE.
 24.2.1.5 WHERE ADDITION OR MODIFICATION IS MADE TO AN
 EXISTING SYSTEM AFFECTING MORE THAN 20 SPRINKLERS, THE
 NEW PORTION SHALL BE ISOLATED AND TESTED AT NOT LESS
 THAN 200 PSI (13.8 BAR) FOR 2 HOURS.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-12-15 Cont ID  
Sent By ccole Date 2016-12-15 Time 11:58 Rev Time 0.00
Received By ccole Date 2016-12-14 Time 09:28 Sent To  
Notes
2016-12-15 09:29:04RESUB ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-12-14 Cont ID  
Sent By ccole Date 2016-12-14 Time 09:36 Rev Time 0.00
Received By ccole Date 2016-11-28 Time 17:13 Sent To FIRE
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2016-12-15 Cont ID  
Sent By ccole Date 2016-12-15 Time 11:58 Rev Time 0.00
Received By ccole Date 2016-12-15 Time 11:58 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2016-12-14 Cont ID  
Sent By ccole Date 2016-12-14 Time 09:36 Rev Time 0.00
Received By ccole Date 2016-12-14 Time 09:36 Sent To  
Notes
2016-12-14 09:41:081ST REVIEW FBC-2014 MECHANICAL
 PERMIT #16111134
 12/14/16
  
 1) ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND
 ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF
 THE PERSON RESPONSIBLE FOR THE DESIGN- SECTION 107.2.1
 WPB AMENDMENTS TO THE FBC. IN LIEU OF DESIGNER
 SIGNATURE, A SHOP DRAWING APPROVAL BY THE ENGINEER OF
 RECORD FOR THE MAIN PROJECT IS ACCEPTABLE,
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved