Plan Review Details - Permit 16110960
Plan Review Stops For Permit 16110960
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2016-11-30 Cont ID  
Sent By shill Date 2016-11-30 Time 08:42 Rev Time 0.00
Received By shill Date 2016-11-30 Time 06:48 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2016-12-12 Cont ID  
Sent By dharvey Date 2016-12-12 Time 08:05 Rev Time 0.00
Received By vperez Date 2016-12-12 Time 08:05 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2016-12-07 Cont ID  
Sent By wjolin Date 2016-12-07 Time 12:03 Rev Time 0.00
Received By wjolin Date 2016-12-07 Time 11:55 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-01-13 Cont ID  
Sent By gjohnson Date 2017-01-13 Time 10:09 Rev Time 0.00
Received By gjohnson Date 2017-01-05 Time 09:36 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-12-27 Cont ID  
Sent By cpuell Date 2016-12-27 Time 06:00 Rev Time 0.00
Received By cpuell Date 2016-11-22 Time 15:14 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2016-12-13 Cont ID  
Sent By hmoser Date 2016-12-13 Time 15:07 Rev Time 0.00
Received By hmoser Date 2016-12-13 Time 13:12 Sent To  
Notes
2016-12-13 14:58:48PASS PROVISO
 1) REFER TO SECTION 504.3 CLEANOUT. EACH VERTICAL RISER
 SHALL BE
 PROVIDED WITH MEANS OF CLEANOUT. 2014 FBC (M)
 2) REFER TO SECTION 501.3.1 LOCATION OF EXHAUST OUTLETS
 # 2
 SHALL BE 10FT. FROM OPERABLE OPENINGS INTO BUILDING.
 2014 FBC (M)
  
 PLAN REVIEW BY HAROLD MOSER
 [email protected]
 OFFICE 561-805-6732
 FAX 561-805-6676

Review Stop P PLUMBING
Rev No 2 Status P Date 2017-01-13 Cont ID  
Sent By tklarge Date 2017-01-13 Time 09:59 Rev Time 0.00
Received By gjohnson Date 2017-01-13 Time 09:59 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2016-12-27 Cont ID  
Sent By tklarge Date 2016-12-19 Time 05:57 Rev Time 0.00
Received By tklarge Date 2016-12-19 Time 06:06 Sent To  
Notes
2016-12-19 06:08:25PLEASE PROVIDE A DESCRIPTIVE NARRATIVE THAT CLEARLY
 STATES WHAT CHANGES HAVE BEEN BEEN MADE TO EACH
 PLUMBING SHEET. THE NARRATIVE IS TOO VAGUE AND GENERAL
 TO DO A COMPREHENSIVE REVIEW. WPB AMEND. TO FBC SEC.
 107.2.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2017-01-13 Cont ID  
Sent By gjohnson Date 2017-01-13 Time 10:09 Rev Time 0.00
Received By gjohnson Date 2016-11-30 Time 09:00 Sent To  
Notes
2017-01-13 10:01:131/13/17 DIG SIG ON MEP+T SHEETS ARE GOOD GPJ
2016-11-30 09:00:3711/30/16, 1ST REVIEW CYCLE, VERIFIED A AND FP SHEETS OK
 SH
  
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2016-12-06 Cont ID  
Sent By eschneid Date 2016-12-06 Time 15:09 Rev Time 0.00
Received By eschneid Date 2016-12-06 Time 15:09 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved