Plan Review Details - Permit 16100739
Plan Review Stops For Permit 16100739
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-11-18 Cont ID  
Sent By shill Date 2016-11-18 Time 14:17 Rev Time 0.00
Received By shill Date 2016-11-18 Time 14:17 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-11-01 Cont ID  
Sent By shill Date 2016-11-01 Time 12:09 Rev Time 0.00
Received By shill Date 2016-11-01 Time 12:09 Sent To E
Notes
2016-11-01 12:42:16****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. PROVIDE A VERIFIABLE COPY OF THE CONTRACT FOR THIS
 JOB, FBC 109. VALUE IS TO INCLUDE LABOR, MATERIALS,
 OVERHEAD, LABOR, EVEN IF PROVIDED BY OTHERS.
  
 2. THREE FASTENERS DOES NOT APPEAR ADEQUATE FOR ALL OF
 THE LETTERS DUE TO THE CONFIGURATION OF THE LETTERS
 (FOR INSTANCE, H OR S). IN PREVIOUS CONVERSATION AND
 COMMENT LIST, A FASTENING PATTERN WAS SUGGESTED. NO MAX
 SPACING OR FASTENING PATTERN WAS SPECIFIED.
  
 3. FASTENER REQUIRED IS NOT CLEAR. SHEET 4, M1
 SPECIFIES "10/24 NUTSERT / ALL THREAD / NUTS /
 WASHERS". DO ALL 10/24 NUTSERTS HAVE THE SAME STRENGTH,
 REGARDLESS OF MANUFACTURER?
  
 REPEAT COMMENTS FOR THIS ENGINEER. PLANS HAVE BEEN
 FORWARDED TO FBPE TO DETERMINE SUFFICIENCY.
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2016-11-17 Cont ID  
Sent By vperez Date 2016-11-17 Time 16:40 Rev Time 0.00
Received By vperez Date 2016-11-17 Time 16:40 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2016-11-02 Cont ID  
Sent By vperez Date 2016-11-02 Time 13:28 Rev Time 0.00
Received By vperez Date 2016-11-02 Time 13:28 Sent To  
Notes
2016-11-02 13:29:27ADDRESS BUILDING REVIEW COMMENTS FOR AN ELECTRICAL
 APPROVAL.
  
 VAL PEREZ
 *6717

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-11-18 Cont ID  
Sent By shill Date 2016-11-18 Time 14:17 Rev Time 0.00
Received By shill Date 2016-11-09 Time 10:23 Sent To  
Notes
2016-11-14 10:23:20RESUB ROUTED TO NJWIRA VIA ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-11-02 Cont ID  
Sent By vperez Date 2016-11-02 Time 13:28 Rev Time 0.00
Received By vperez Date 2016-11-02 Time 13:28 Sent To Z
Notes
2016-11-01 12:48:57TO VP DESK
  

Review Stop Z ZONING
Rev No 2 Status P Date 2016-11-17 Cont ID  
Sent By ajones Date 2016-11-17 Time 14:32 Rev Time 0.00
Received By ajones Date 2016-11-14 Time 15:34 Sent To E
Notes
2016-11-15 16:48:47ROUTED TO ERIC SCHNEIDER

Review Stop Z ZONING
Rev No 1 Status P Date 2016-10-27 Cont ID  
Sent By vperez Date 2016-11-02 Time 13:28 Rev Time 0.00
Received By njwira Date 2016-10-26 Time 14:12 Sent To E
Notes
2016-10-26 15:16:29ROUTED TO ERIC SCHNEIDER