Review Stop G GAS REVIEW
Rev No 2 Status P Date 2016-11-02 Cont ID  
Sent By tklarge Date 2016-11-02 Time 06:16 Rev Time 0.00
Received By tklarge Date 2016-11-02 Time 05:23 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2016-10-28 Cont ID  
Sent By tklarge Date 2016-10-28 Time 09:21 Rev Time 0.00
Received By tklarge Date 2016-10-27 Time 03:50 Sent To  
Notes
2016-10-27 06:29:201) SHOW THE BTU LOAD FOR THE FUTURE GRILL AND THE
 OUTDOOR FIREPLACE ON THE GAS RISER. THIS BTU LOAD MUST
 BE ADDED INTO THE TOTAL BTU LOAD OF THE SYSTEM AND THE
 SYSTEM SHALL BE SIZED ACCORDINGLY. 2014 FGC SEC.404.2.
 2) THE LONGEST LENGTH APPEARS TO BE 129 FT. NOT 120 FT.
 PLEASE RECHECK YOUR MEASUREMENTS AND MAKE THE
 ADJUSTMENT ON THE RISER.
 3) AS A MATTER OF SAFETY, THE PLUMBING INSPECTION
 SECTION REQUIRES THAT FUTURE GAS OUTLETS BE EQUIPPED
 WITH A STEP-DOWN REGULATOR, A SHUT OFF VALVE, A NIPPLE
 AND CAP FOR 2 PSI GAS SYSTEMS AND A SHUTOFF VALVE,
 NIPPLE AND CAP FOR SYSTEMS LESS THAN 2 PSI. THE VENT
 OUTLET ON THE STEP DDOWN REGULATORS SHALL BEE PLUGGED
 OR CAPPED.
 4) SHOW THE DISTANCE OF THE MOST REMOTE OUTLET FROM THE
 POINT OF DELIVERY FOR THE LOW PRESSURE SIDE OF THE
 SYSTEM. 2014 FGC SEC. 402.4.1.
 5) SUBMIT ADDITIONAL INFORMATION FROM THE MANUFACTURER
 OF THE TANKLESS WATER HEATER. THE INFORMATION THAT WAS
 SUBMITTED DOES NOT INDICATE THE MANUFACTURER, THE MODEL
 NUMBER, THE BTU LOAD, ETC.
 6) THE DRYER IS LOCATED IN A ROOM WITH A DOOR THEREFORE
 COMBUSTION AIR REQUIREMENTS MUST BE CALCULATED ON THE
 SPACE OF THE ROOM WHERE THE DRYER IS LOCATED IN
 ACCORDANCE WITH THE FGC SEC.304.1, 614.5. ACCORDING TO
 FGC SEC.304.5.1, THE VOLUME REQUIRED FOR THE DRYER IS
 1750 CUBIC FEET.ADDITIONAL COMBUSTION AIR IS REQUIRED.
 7) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-11-02 Cont ID  
Sent By tklarge Date 2016-11-02 Time 06:16 Rev Time 0.00
Received By tklarge Date 2016-10-31 Time 13:24 Sent To  
Notes
2016-11-01 13:24:22RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-10-28 Cont ID  
Sent By tklarge Date 2016-10-28 Time 09:21 Rev Time 0.00
Received By tklarge Date 2016-10-25 Time 14:32 Sent To P