Plan Review Details - Permit 16100603
Plan Review Stops For Permit 16100603
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2016-10-27 Cont ID  
Sent By skennedy Date 2016-10-27 Time 13:42 Rev Time 0.00
Received By skennedy Date 2016-10-27 Time 13:42 Sent To  
Notes
2016-10-27 13:46:48THIS IS A RE-ISSUE OF PERMIT NUMBER 05040730. PLEASE
 SEE THE NOTES PERTAINING TO ELECTRICAL, PLUMBING AND
 GAS. A FINAL BUILDING INSPECTION AND OTHER INSPECTIONS
 ARES REQUIRED.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2016-10-27 Cont ID  
Sent By skennedy Date 2016-10-27 Time 13:42 Rev Time 0.00
Received By skennedy Date 2016-10-27 Time 13:42 Sent To  
Notes
2016-10-27 13:46:23THERE IS NO INSPECTION HISTORY. THE ELECTRICAL
 INSPECTOR MAY ACCEPT AN AFFIDEVIT FROM THE ELECTRICAL
 CONTRACTOR OF RECORD OR HE MAY REQUIRE WORK TO BE MADE
 ACCESSIBLE FOR INSPECTION.

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2016-10-27 Cont ID  
Sent By skennedy Date 2016-10-27 Time 13:43 Rev Time 0.00
Received By skennedy Date 2016-10-27 Time 13:43 Sent To  
Notes
2016-10-27 13:45:02A GAS HEATER IS INCLUDED HOWEVER THERE APPEARS TO BE NO
 RECORD OF A GAS PERMIT. IF THE HEATER IS INSTALLED, A
 NEW GAS PERMIT MAY BE REQQUIRED.

Review Stop P PLUMBING
Rev No 1 Status P Date 2016-10-27 Cont ID  
Sent By skennedy Date 2016-10-27 Time 13:43 Rev Time 0.00
Received By skennedy Date 2016-10-27 Time 13:43 Sent To  
Notes
2016-10-27 13:43:52A FINAL INSPECTION IS REQUIRED.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved