Plan Review Details - Permit 16090909
Plan Review Stops For Permit 16090909
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2016-10-13 Cont ID  
Sent By albarran Date 2016-10-13 Time 07:46 Rev Time 0.00
Received By albarran Date 2016-10-13 Time 07:15 Sent To I
Notes
2016-10-13 07:47:08APPROVED ELECTRICAL REVIEW. IN CONVERSATION W/MR.
 PATTERSON THE DRAWING WAS CORRECTED TO COMPLY.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2016-09-29 Cont ID  
Sent By albarran Date 2016-09-29 Time 08:29 Rev Time 0.00
Received By albarran Date 2016-09-28 Time 19:05 Sent To I
Notes
2016-09-29 08:30:05ELECTRICAL REVIEW NOTES
 REVIEWED FOR COMPLIANCE WITH:
 ELECTRICAL REVIEW NOTES
 REVIEWED FOR COMPLIANCE WITH:
 5TH EDITION FBC 2014 & NFPA 70 2011 (NEC)
  
 PROJECT NAME:
 JOB ADDRESS:
 DESCRIPTION: REPLACE METER CAN AND 2 LAKE AERATOR
 CONTROLLERS
 MASTER PERMIT: 16090909
  
 BELOW PLEASE FIND A LIST OF REQUIRED CORRECTIONS.
 ADDITIONAL CORRECTIONS MAY BE REQUIRED AFTER REVIEW OF
 SUBMITTED CORRECTIONS.
  
 1. NEC 682.11: YOU SHALL SUBMIT A SITE DIAGRAM/PLAN
 SHOWING THE LOCATION OF EVERY ELECTRICAL COMPONENT
 ASSOCIATED WITH THE PERMIT TO ASCERTAIN COMPLIANCE WITH
 RELATION TO THE SHORELINE AND THE ELECTRICAL DATUM
 PLANE.
 2. ALL LIVE PARTS SHALL BE ELEVATED 12? ABOVE THE EDP &
 SERVICE EQUIPMENT SHALL DISCONNECT WHEN THE WATER RISES
 TO THE EDP.
 3. NEC 682.33(A): YOU SHALL SHOW ON THE SITE PLAN THE
 REQUIRED EQUIPOTENTIAL BONDING PLANE.
  
 WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR
 RE-SUBMITTAL, PLEASE PROVIDE A RESPONSE LETTER
 (NARRATIVE) ADDRESSING EACH ITEM AND THE PAGE NUMBER
 WHERE THE CORRECTIONS APPEAR ALONG WITH THE STANDARD
 CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PAGES INTO THE SUBMITTAL PACKAGE. MARK VOID
 AND LEAVE THE PREVIOUSLY REVIEWED SHEETS FOR
 COMPARATIVE REVIEW. CLOUDING THE CHANGES WILL BE
 GREATLY APPRECIATED.
  
 IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO
 CONTACT ME DIRECTLY.
  
 THANK YOU,
 MIKE ALBARRAN
 ELECTRICAL PLANS EXAMINER
 PH: 561-805-6746
 EMAIL: [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-10-13 Cont ID  
Sent By albarran Date 2016-10-13 Time 07:49 Rev Time 0.00
Received By albarran Date 2016-10-13 Time 07:00 Sent To  
Notes
2016-10-13 07:50:3010/13/16 APPROVED ELECTRICAL REVIEW. CONTACTED ISAAC
 PATTERSON VIA EMAIL. FILE SENT TO SMALL READY BIN U. MA
2016-10-13 07:48:20MR. PATTERSON EMAIL CORRECTED DRAWINGS DIRECTLY TO ME
 FOR APPROVAL.
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-09-29 Cont ID  
Sent By albarran Date 2016-09-29 Time 08:32 Rev Time 0.00
Received By albarran Date 2016-09-26 Time 08:03 Sent To  
Notes
2016-09-29 08:46:53FAILED ELECTRICAL REVIEW AS NOTED. SPOKE W/EC TO ADVISE
 OF NEEDED CORRECTIONS.
2016-09-27 08:05:14ELEC <5K