Plan Review Stops For Permit 16090844 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2016-11-01 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-11-01 |
Time |
14:42 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-11-01 |
Time |
14:42 |
Sent To |
|
|
Notes |
2016-11-01 14:50:48 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. THE ENGINEER'S LETTER DOES NOT APPEAR TO BE | | NECESSARY. IT REFERS TO DELEGATED ENGINEERING, BUT THIS | | DOES NOT APPEAR TO BE DELEGATED ENGINEERING. | | | | IF THE ENGINEER'S APPROVAL LETTER IS TO BE A PART OF | | THE PERMIT RECORD, IT IS TO BE SIGNED AND SEALED. | | | | PER BUILDING OFFICIAL, SOMEONE IS TO SIGN THE SHOP | | DRAWING REVIEW STAMP. IT IS ACCEPTABLE AT THIS TIME FOR | | BRIAN R. GREENE TO SIGN ON BEHALF OF THE ARCHITECT, BUT | | THE REVIEW STAMP IS TO INCLUDE A SIGNATURE. | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2016-11-01 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-11-01 |
Time |
14:50 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-09-22 |
Time |
10:25 |
Sent To |
|
|
Notes |
2016-09-23 10:25:34 | SUBMITTAL ROUTED TO SHILL |
|
|
|