Plan Review Details - Permit 16090823
Plan Review Stops For Permit 16090823
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2016-10-14 Cont ID  
Sent By Mgonzale Date 2016-10-14 Time   Rev Time 1.00
Received By mgonzale Date 2016-10-14 Time   Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-10-14 Cont ID  
Sent By andrian Date 2016-10-14 Time 11:41 Rev Time 0.00
Received By andrian Date 2016-09-22 Time 13:03 Sent To  
Notes
2016-09-22 13:04:13ROUTED TO ZONING

Review Stop Z ZONING
Rev No 2 Status P Date 2016-10-14 Cont ID  
Sent By njwira Date 2016-10-14 Time 11:36 Rev Time 0.00
Received By njwira Date 2016-10-14 Time 11:36 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2016-09-27 Cont ID  
Sent By njwira Date 2016-09-27 Time 14:45 Rev Time 0.00
Received By njwira Date 2016-09-22 Time 15:18 Sent To ENG
Notes
2016-09-27 14:51:149/27/16
  
 SF-7
  
 FAILED
 1. DRIVEWAY EXCEEDS 75% OR 1,000SQFT. OF IMPERMIABLE
 SURFACE. 94-482(A)
 2. WHAT IS THE RADIUS OF THE CIRCULAR DIVEWAY. FIGURE
 XV-I
  
 PASSED
 1. NON-DUSTING SURFACE
 2. NO TREES BEING REMOVED
 3. DRIVEWAY DOES NOT EXCEED THE 20FT. MAXINIMUM CURB
 CUT.
  
 PLEASE CONTACT
 NATHAN WIRA
 [email protected]
 (561)822-1442
  