Review Stop G GAS REVIEW
Rev No 4 Status P Date 2016-12-08 Cont ID  
Sent By tklarge Date 2016-12-08 Time 04:31 Rev Time 0.00
Received By tklarge Date 2016-12-08 Time 03:43 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status F Date 2016-11-23 Cont ID  
Sent By tklarge Date 2016-11-23 Time 06:54 Rev Time 0.00
Received By tklarge Date 2016-11-23 Time 06:32 Sent To  
Notes
2016-11-23 06:54:021) COMBUSTION AIR CALCULATIONS ARE ALSO REQUIRED FOR
 THE FUTURE DRYER AT THIS TIME TO ENSURE CODE
 COMPLIANCE. 2014 FBCR SEC.G2407.9.3.1.
 2) THE SHUTOOF VALE FOR THE FUTURE GAS OUTLETS SHALL BE
 LOCATED AHEAD OF THE REGULATOR. THE PLAN SHOWS THE
 SHUTOFF VALVE DOWNSTREAM OF THE REGULATOR.THIS CAN BE
 NOTED. ON THE PLANS IN PEN. 2014 FBCR G2420.4.
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  
  

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2016-10-20 Cont ID  
Sent By tklarge Date 2016-10-20 Time 05:51 Rev Time 0.00
Received By tklarge Date 2016-10-20 Time 04:56 Sent To  
Notes
2016-10-20 05:51:281) SUBMIT CALCULATIONS FOR COMBUSTION AIR. COMPLY WITH
 2014 FBCR SEC.G2407.1, G2439.4, G2407.9.3. WHERE
 COMBUSTION AIR IS PROVIDED BY THE BUILDING?S MECHANICAL
 VENTILATION SYSTEM, THE SYSTEM SHALL PROVIDE THE
 SPECIFIED COMBUSTION AIR RATE IN ADDITION TO THE
 REQUIRED VENTILATION AIR. FGC SEC..304.9.3 OR FBCR
 G2407.9.3.2ND REQUEST.
 2) LOCATION OF THE DRYER EXHAUST SHALL BE A MIN. OF 3
 FEET FROM THE WINDOW PER 2014 FBCR SEC.M1502.3.
 3) THE FUTURE GAS OUTLETS SHALL BE EQUIPPED WITH A
 SHUT-OFF VALE AND THE STEP DOWN REGULATOR INSTALLED
 WITH THE GAS OUT OF THE REGULATOR PLUGGED OR CAPPED.L
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2016-09-02 Cont ID  
Sent By tklarge Date 2016-09-02 Time 04:57 Rev Time 0.00
Received By tklarge Date 2016-09-02 Time 04:24 Sent To  
Notes
2016-09-02 04:57:481) THE PLANS ON RECORD SHOW A GAS DRYER BUT IT IS NOT
 SHOWNON THE GAS DRAWING. CLARIFY.
 2) SUBMIT A PLAN OF THE HOUSE SHOWING THE PROPOSED
 LOCARION OF THE FUTURE TANKLESS WATER HEATER IN
 RELATION TO OPERABLE WINDOWS AND DOORS IN THE
 STRUCTURE. THE TANKLESS WATER HEATER SHALL COMPLY WITH
 THE MANUFACTURER'S INSTALLATION INSTRUCTIONS IN REGARDS
 TO THE MINIMUM REQUIRED DISTANCES FROM OPERABLE DOORS,
 WINDOWS AND SOFFIT VENTS.
 3) SHOW THE CORRESPONDING EHD OF THE CSST. THERE ARE
 TWO DIFFERENT EHD'S WITH THE CSST AND EACH ONE CARRIES
 A DIFFERENT BTU LOAD. SEE 2014 FGC TABLE 402.4 (15).
 4) IF THE GAS DRYER IS ADDED TO THE SYSTEM THE PIPE
 SIZES SHALL BE RECHECKED AS THEY MAY BE UNDERSIZED WITH
 THE ADDED BTU LOAD.
 5) SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2014
 FBC-FUEL GAS CODE SEC.304.1 OR 2014 FBC-RES. SEC. G
 2407.
 6). SUBMIT MANUFACTURER?S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1.
 7) SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND
 TERMINATION OF THE GAS VENTS PER 2014 FBC-FUEL GAS
 SECS. 502 THRU 505 OR 2014 FBC-RES. SEC.G2426.
  
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2016-12-08 Cont ID  
Sent By tklarge Date 2016-12-08 Time 04:31 Rev Time 0.00
Received By tklarge Date 2016-12-02 Time 14:13 Sent To  
Notes
2016-12-05 14:13:11RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2016-11-23 Cont ID  
Sent By tklarge Date 2016-11-23 Time 06:54 Rev Time 0.00
Received By tklarge Date 2016-11-21 Time 13:08 Sent To  
Notes
2016-11-22 13:08:14RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-10-20 Cont ID  
Sent By tklarge Date 2016-10-20 Time 05:51 Rev Time 0.00
Received By tklarge Date 2016-10-18 Time 10:12 Sent To  
Notes
2016-10-19 10:12:58RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-09-02 Cont ID  
Sent By tklarge Date 2016-09-02 Time 04:58 Rev Time 0.00
Received By tklarge Date 2016-08-31 Time 09:49 Sent To  
Notes
2016-09-01 09:50:11PLUMB <5K