Review Stop FIRE FIRE DEPARTMENT
Rev No 4 Status P Date 2016-12-30 Cont ID  
Sent By pleduc Date 2016-12-30 Time   Rev Time 0.00
Received By pleduc Date 2016-12-30 Time 12:58 Sent To M
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2016-11-21 Cont ID  
Sent By pleduc Date 2016-11-21 Time   Rev Time 0.00
Received By pleduc Date 2016-11-21 Time 16:32 Sent To M
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2016-09-16 Cont ID  
Sent By pleduc Date 2016-09-16 Time   Rev Time 0.00
Received By pleduc Date 2016-09-16 Time 12:14 Sent To M
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2016-08-29 Cont ID  
Sent By pleduc Date 2016-08-29 Time :02 Rev Time 0.00
Received By pleduc Date 2016-08-29 Time 16:02 Sent To M
Notes
2016-08-29 16:04:53THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
 1) THE APPROVAL OF ANY SUPPRESSION SYSTEM IS NOT
 INCLUDED NOR APPROVED WITH THIS PERMIT.
  
 ANY PROPOSED SUPPRESSION SYSTEM SHALL BE SUBMITTED
 UNDER SEPARATE SHOP DRAWINGS.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2017-01-13 Cont ID  
Sent By ccole Date 2017-01-13 Time 07:32 Rev Time 0.00
Received By ccole Date 2017-01-11 Time 14:27 Sent To  
Notes
2017-01-11 14:27:57RESUB ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2017-01-03 Cont ID  
Sent By ccole Date 2017-01-03 Time 09:06 Rev Time 0.00
Received By ccole Date 2016-12-28 Time 09:22 Sent To  
Notes
2016-12-29 09:22:58RESUB ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2016-11-29 Cont ID  
Sent By ccole Date 2016-11-29 Time 11:53 Rev Time 0.00
Received By ccole Date 2016-11-17 Time 11:18 Sent To  
Notes
2016-11-18 11:18:46RESUB ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2016-11-04 Cont ID  
Sent By ccole Date 2016-11-04 Time 12:53 Rev Time 0.00
Received By ccole Date 2016-11-02 Time 12:53 Sent To  
Notes
2016-11-03 12:54:01RESUB ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-09-19 Cont ID  
Sent By ccole Date 2016-09-19 Time 12:37 Rev Time 0.00
Received By ccole Date 2016-09-09 Time 10:46 Sent To  
Notes
2016-09-12 10:46:23RESUB ROUTED TO FIRE INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-09-12 Cont ID  
Sent By lmarchan Date 2016-09-02 Time 10:45 Rev Time 0.00
Received By lmarchan Date 2016-08-23 Time 14:30 Sent To  
Notes
2016-08-23 14:30:45ROUTED TO FIRE INBOX

Review Stop M MECHANICAL (A/C)
Rev No 6 Status P Date 2017-01-13 Cont ID  
Sent By ccole Date 2017-01-13 Time 07:32 Rev Time 0.00
Received By ccole Date 2017-01-13 Time 07:32 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 5 Status F Date 2017-01-03 Cont ID  
Sent By ccole Date 2017-01-03 Time 10:20 Rev Time 0.00
Received By ccole Date 2017-01-03 Time 09:06 Sent To  
Notes
2017-01-03 10:33:305TH REVIEW FBC-2014 MECHANICAL
 PERMIT #16080974
 1/3/17
  
 1) COMMENTS FROM THE PREVIOUS REVIEWS REGARDING MAKEUP
 TEMPERATURE STILL EXISTS. IF CHOOSING TO SHOW THAT THE
 EXISTING OR PROPOSED AC SYSTEM HAS THE CAPACITY TO
 ACCOMODATE THE ADDITIONAL HEAT GAIN FROM THE MAKEUP
 AIR, PLEASE PROVIDE AN EQUIPMENT SCHEDULE FOR THE
 SYSTEM AND A LOAD CALCULATION FOR THE SPACE THAT
 INCLUDES THE ADDITIONAL HEAT LOAD.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 4 Status F Date 2016-11-29 Cont ID  
Sent By ccole Date 2016-11-29 Time 11:53 Rev Time 0.00
Received By ccole Date 2016-11-29 Time 11:53 Sent To  
Notes
2016-11-29 11:56:122ND REVIEW FBC-2014 MECHANICAL
 PERMIT #16080974
 11/29/16
  
 1) COMMENT #1 FROM THE 1ST REVIEW STILL EXISTS. I HAVE
 REPRINTED BELOW.
  
 1ST REVIEW COMMENT #1: IF CHOOSING NOT TO PROVIDE
 CONDITIONED MAKEUP AIR, PLEASE PROVIDE AN AC
 CALCULATION THAT INCORPORATES THE ADDITIONAL HEAT LOAD
 FROM THE MAKEUP AIR. THE CALCULATION MUST INDICATE THAT
 THE EXISTING SYSTEM CAN HANDLE THE ADDITINAL LOAD.
 PLEASE SEE SECTION R302.1 FBC-14 ENERGY CONSERVATION
 FOR INTERIOR DESIGN TEMPERATURE (75 DEGREES F FOR
 COOLING).
  
 THE SUBMITTED CALCULATION INDICATES AN INTERIOR DESIGN
 DRYBULB TEMPERATURE OF 75 DEGREES. THE ENGINEER HAS
 WRITTEN IN HIS REPONSE NARRATIVE THAT THE TEMPERATURE
 WILL BE SET AT 81 DEGREES IN THE KITCHEN AREA, HOWEVER
 THERE IS ONE AC SYSTEM THAT IS PROVIDING COOLING TO
 BOTH THE DINING AND KITCHEN AREAS. PROVIDE EVIDENCE ON
 THE PLAN THAT THE INTERIOR DESIGN TEMPERATURE IN THE
  
 KITCHEN WILL BE 81 DEGREES.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2016-11-04 Cont ID  
Sent By ccole Date 2016-11-04 Time 12:37 Rev Time 0.00
Received By ccole Date 2016-11-04 Time 12:37 Sent To  
Notes
2016-11-04 12:53:463RD REVIEW FBC-2014 MECHANICAL
 PERMIT #16080974
 11/4/16
  
 1) REFER TO SECTION 508.1.1: IF CHOOSING NOT TO PROVIDE
 CONDITIONED MAKEUP AIR, PLEASE PROVIDE AN AC
 CALCULATION THAT INCORPORATES THE ADDITIONAL HEAT LOAD
 FROM THE MAKEUP AIR. THE CALCULATION MUST INDICATE THAT
 THE EXISTING SYSTEM CAN HANDLE THE ADDITINAL LOAD.
 PLEASE SEE SECTION R302.1 FBC-14 ENERGY CONSERVATION
 FOR INTERIOR DESIGN TEMPERATURE (75 DEGREES F FOR
 COOLING).
  
 2) PROVIDE THE TYPES AND SIZES OF MAKEUP AIR DUCTS, AND
 REFER TO SECTION 507.9 FOR CLEARANCES TO COMBUSTIBLES.
  
 3) AS PREVIOUSLY REQUESTED IN THE 1ST REVIEW, PROVIDE
 THE PROJECT ADDRESS ON THE PLANS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2016-09-19 Cont ID  
Sent By ccole Date 2016-09-19 Time 12:38 Rev Time 0.00
Received By ccole Date 2016-09-19 Time 12:38 Sent To  
Notes
2016-09-19 12:44:251ST REVIEW FBC-2014 MECHANICAL
 PERMIT #16080974
 9/19/16
  
 1) SUBMIT THE NOA'S FOR THE FANS.
  
 2) CLARIFY HOW COMPLIANCE IS BEING MET FOR MAKEUP AIR
 TEMPERATURE- SEE SECTION 508.1.1 FBC-14 MECH.
  
 3) PROVIDE AN ENLARGED DETAIL FOR THE GREASE DUCT
 ENCLOSURE AT THE ROOF PENETRATION.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2016-09-02 Cont ID  
Sent By hmoser Date 2016-09-02 Time 07:28 Rev Time 0.00
Received By hmoser Date 2016-09-01 Time 15:34 Sent To  
Notes
2016-09-02 07:26:33PLAN DENIED
 NO ADRESS ON PLANS PER SECTION107
 2014 FBC.
  
 PLAN REVIEW BY HAROLD MOSER
 [email protected]
 OFFICE 561-805-6732
 FAX 561-805-6676


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved