Plan Review Details - Permit 16080690
Plan Review Stops For Permit 16080690
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-09-12 Cont ID  
Sent By shill Date 2016-09-12 Time 09:01 Rev Time 0.00
Received By shill Date 2016-09-12 Time 09:01 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-08-18 Cont ID  
Sent By shill Date 2016-08-18 Time 12:56 Rev Time 0.00
Received By shill Date 2016-08-18 Time 12:56 Sent To  
Notes
2016-08-18 12:59:44****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. SEE PRIOR CORRECTION LISTS. IF A REVIEW LETTER IS
 SUBMITTED IN LIEU OF AN INTIALED/DATED SHOP DRAWING
 REVIEW STAMP DIRECTLY ON THE SUBMITTAL, THE LETTER IS
 TO BE SIGNED AND SEALED (PER BUILDING OFFICIAL), FBC
 107.
  
 2. ONE PAGE IN THE SUBMITTAL INCLUDES A TITLE BLOCK,
 SIGNATURE AND SEAL. ALL OTHER PAGES (SETS OF
 CALCULATIONS, DRAWINGS) ARE LACKING A TITLE BLOCK,
 SIGNATURE AND SEAL. SEE FAC61G15-23.002 REGARDING
 FORMATS ACCEPTABLE TO FBPE FOR ENGINEERING. THIS IS
 AVAILABLE AT WWW.FBPE.ORG (LAWS AND RULES).
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-09-12 Cont ID  
Sent By shill Date 2016-09-12 Time 09:01 Rev Time 0.00
Received By shill Date 2016-09-08 Time 09:41 Sent To  
Notes
2016-09-09 09:41:38RESUB ROUTED TO SHILL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-08-18 Cont ID  
Sent By shill Date 2016-08-18 Time 12:59 Rev Time 0.00
Received By shill Date 2016-08-17 Time 12:56 Sent To  
Notes
2016-08-17 12:56:19SHILL'S DESK


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved