Plan Review Details - Permit 16080421
Plan Review Stops For Permit 16080421
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-12-16 Cont ID  
Sent By cthroop Date 2016-12-16 Time 13:51 Rev Time 0.00
Received By cthroop Date 2016-12-15 Time 12:12 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-08-26 Cont ID  
Sent By cthroop Date 2016-08-26 Time 13:26 Rev Time 0.00
Received By cthroop Date 2016-08-26 Time 13:26 Sent To  
Notes
2016-08-26 13:39:24BUILDING PLAN REVIEW
 2014 FLORIDA BUILDING CODE
  
 CHRISTOPHER S. THROOP, C.B.O.
 BUILDING PLANS EXAMINER ? PX3169
 CONSTRUCTION SERVICES DIVISION
 TEL: 561-805-6726
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
 1ST REVIEW
 ACTION: DENIED
  
 1. PROVIDE SITE PLAN SHOWING REQUIRED PARKING,
 INCLUDING ACCESSIBLE PARKING.
 2. PROVIDE ACCESSIBLE ROUTE FROM PARKING TO MODULAR
 STRUCTURE.
 3. PROVIDE ACCESSIBLE RAMP.
  
 PROVIDE A LEGIBLE PLAN TO PROVIDE THE FOLLOWING
 INFORMATION:
 TOTAL NUMBER OF PARKING SPACES
 NUMBER OF ACCESSIBLE SPACES ? PER TABLE 208.2
 LOCATION OF ACCESSIBLE ENTRANCES
 LOCATION OF ACCESSIBLE SPACES AND ACCESS AISLES
 SHOW ACCESSIBLE ROUTE FROM PUBLIC WAY
 ACCESSIBLE ROUTE FROM ACCESSIBLE SPACE TO ACCESSIBLE
 ENTRANCE
  
 SEE FBC 2010 ACCESSIBILITY 202.3 (ALTERATIONS), 208.2
 (PARKING SPACES), 502 (PARKING SPACES), 206 (ACCESSIBLE
 ROUTE).
  
 402.2 COMPONENTS.
 ACCESSIBLE ROUTES SHALL CONSIST OF ONE OR MORE OF THE
 FOLLOWING COMPONENTS: WALKING SURFACES WITH A RUNNING
 SLOPE NOT STEEPER THAN 1:20, DOORWAYS, RAMPS, CURB
 RAMPS EXCLUDING THE FLARED SIDES, ELEVATORS, AND
 PLATFORM LIFTS. ALL COMPONENTS OF AN ACCESSIBLE ROUTE
 SHALL COMPLY WITH THE APPLICABLE REQUIREMENTS OF
 CHAPTER 4 AND 208.3.1.
  
  
  
  

Review Stop E ELECTRICAL
Rev No 2 Status N Date 2016-10-13 Cont ID  
Sent By vperez Date 2016-10-13 Time 08:48 Rev Time 0.00
Received By vperez Date 2016-10-13 Time 08:48 Sent To  
Notes
2016-10-13 08:49:40ELECTRICAL SUBMITTED SEPERATE TEMP ELECTRICAL PERMIT
 SETUP/ C/F ELECTRIC

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2016-08-26 Cont ID  
Sent By skennedy Date 2016-08-26 Time 13:01 Rev Time 0.00
Received By skennedy Date 2016-08-26 Time 13:01 Sent To  
Notes
2016-08-26 13:04:511ST REVIEW: FBC 2014 5TH ED.
  
 FBC 107 - PROVIDE ELECTRICAL DETAILS FOR THE FEED TO
 THE MODULAR BUILDING.
  
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2016-09-28 Cont ID  
Sent By pleduc Date 2016-09-28 Time   Rev Time 0.00
Received By pleduc Date 2016-09-27 Time 17:03 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2016-08-22 Cont ID  
Sent By pleduc Date 2016-08-22 Time   Rev Time 0.00
Received By pleduc Date 2016-08-22 Time 11:39 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-12-15 Cont ID  
Sent By cthroop Date 2016-12-15 Time 12:13 Rev Time 0.00
Received By cthroop Date 2016-09-22 Time 10:00 Sent To  
Notes
2016-09-23 10:01:05B10

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-08-26 Cont ID  
Sent By cthroop Date 2016-08-26 Time 13:26 Rev Time 0.00
Received By cthroop Date 2016-08-10 Time 13:24 Sent To  
Notes
2016-08-10 13:24:17ROUTED TO ZONING

Review Stop P PLUMBING
Rev No 2 Status P Date 2016-10-21 Cont ID  
Sent By gjohnson Date 2016-10-21 Time 14:09 Rev Time 0.00
Received By gjohnson Date 2016-10-21 Time 14:09 Sent To  
Notes
2016-10-21 14:14:46APPROVED WITH PROVISO
  
 1. PROVIDE SIZE OF HOLDING TANK IF OVER 300 GAL PERMIT
 FROM HEALTH DEPT IS REQUIRED.
 2. BACKFLOW FOR WATER SERVICE REQUIRED WITH SEPARATE
 PERMIT REQUIRED.
 3. A SIGNED COPY OF CONTRACT FROM VENDOR WITH PUMP OUT
 SCHEDULE FOR HOLDING TANK.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2016-08-26 Cont ID  
Sent By skennedy Date 2016-08-26 Time 13:01 Rev Time 0.00
Received By skennedy Date 2016-08-26 Time 13:01 Sent To  
Notes
2016-08-26 13:03:501ST REVIEW: FBC 2014 5TH ED.
  
 FBC 107 - PROVIDE PLUMBING DETAILS FOR SEWER CONNECTION
 OR OSTD, & POTABLE WATER CONNECTION.\.
  
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status P Date 2016-10-28 Cont ID  
Sent By jroach Date 2016-10-28 Time 14:09 Rev Time 0.00
Received By jroach Date 2016-10-28 Time 13:58 Sent To  
Notes
2016-10-28 14:09:18ZONING PLAN REVIEW
 ___________________________________________
  
 DATE OF REVIEW: 10.28.2016
 PERMIT NO.: 16080421
 ADDRESS: 3501 PARKER AVENUE
 CONTRACTOR/CONTACT: BRETT STRASSEL
 TELEPHONE NO.: 561.324.1127
 SCOPE OF REVIEW: TEMPORARY CONSTRUCTION TRAILER
 ___________________________________________
  
 REVIEW STATUS: PASSED WITH PROVISOS
 ___________________________________________
  
 THIS REVIEW HAS BEEN PASSED SUBJECT TO THE FOLLOWING
 PROVISOS:
  
 1. ALL CONSTRUCTION TRAILERS SHALL BE REMOVED WITHIN
 SEVEN DAYS OF THE FINAL CONSTRUCTION INSPECTION BY THE
 CITY AND PRIOR TO THE ISSUANCE OF A CERTIFICATE OF
 OCCUPANCY.
  
 2. ALL LANDSCAPING (TREES, PALMS, SHRUBS, SOD, ETC.)
 THAT IS DAMAGED AS A RESULT OF CONSTRUCTION SHALL BE
 REPLACED WITH THE SAME SPECIES, OF EQUAL SIZE.
  
 3. PRIOR TO THE REMOVAL OF ANY TREES / PALMS, A TREE
 ALTERATION PERMIT SHALL BE OBTAINED FROM THE
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION.
  
 4. ALL TREES / PALMS WITHIN THE CONSTRUCTION ZONE THAT
 ARE PROPOSED TO REMAIN SHALL BE SURROUNDED BY A TREE
 PROTECTION BARRIER TO PREVENT DAMAGE.
 ___________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ___________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 F: 561.822.1460
  
 E: [email protected]
  
 W: WPB.ORG
  

Review Stop Z ZONING
Rev No 1 Status P Date 2016-08-17 Cont ID  
Sent By jroach Date 2016-08-17 Time 16:41 Rev Time 0.00
Received By jroach Date 2016-08-10 Time 17:17 Sent To FIRE
Notes
2016-08-17 16:42:13ZONING PLAN REVIEW
 ___________________________________________
  
 DATE OF REVIEW: 08.17.2016
 PERMIT NO.: 16080421
 ADDRESS: 3501 PARKER AVENUE
 CONTRACTOR/CONTACT: BRETT STRASSEL
 TELEPHONE NO.: 561.324.1127
 SCOPE OF REVIEW: TEMPORARY CONSTRUCTION TRAILER
 ___________________________________________
  
 REVIEW STATUS: PASSED WITH PROVISOS
 ___________________________________________
  
 THIS REVIEW HAS BEEN PASSED SUBJECT TO THE FOLLOWING
 PROVISOS:
  
 1. ALL CONSTRUCTION TRAILERS SHALL BE REMOVED WITHIN
 SEVEN DAYS OF THE FINAL CONSTRUCTION INSPECTION BY THE
 CITY AND PRIOR TO THE ISSUANCE OF A CERTIFICATE OF
 OCCUPANCY.
  
 2. ALL LANDSCAPING (TREES, PALMS, SHRUBS, SOD, ETC.)
 THAT IS DAMAGED AS A RESULT OF CONSTRUCTION SHALL BE
 REPLACED WITH THE SAME SPECIES, OF EQUAL SIZE.
  
 3. PRIOR TO THE REMOVAL OF ANY TREES / PALMS, A TREE
 ALTERATION PERMIT SHALL BE OBTAINED FROM THE
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION.
  
 4. ALL TREES / PALMS WITHIN THE CONSTRUCTION ZONE THAT
 ARE PROPOSED TO REMAIN SHALL BE SURROUNDED BY A TREE
 PROTECTION BARRIER TO PREVENT DAMAGE.
 ___________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ___________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 F: 561.822.1460
  
 E: [email protected]
  
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved